Loading...
HomeMy WebLinkAbout04-39 Resolution No. 04-39 RESOLUTION AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT WITH JULIA HUGEE-PEDERSEN (Al's Ice Creamery—43 DuPage Court) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M.Dorgan,City Manager,and Dolonna Mecum,City Clerk,be and are hereby authorized and directed to execute a facade improvement program agreement on behalf of the City of Elgin with Julia Hugee-Pedersen for the property commonly known as Al's Ice Creamery at 43 DuPage Court,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: February 25, 2004 Adopted: February 25, 2004 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk CITY OF ELGIN FACADE IMPROVEMENT PROGRAM AGREEMENT 43 DuPage Court THIS AGREEMENT is made and entered into this ( _ day of a,,z , 2004, by and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as "City") , and Julia Hugee-Pedersen, the owner of the property commonly known as 43 DuPage Court, Elgin, Illinois, (hereinafter referred to as "Owner" ) . WHEREAS, City has established a facade improvement program (hereinafter referred to as "Program" ) for application within certain areas of the corporate limits of City designated by City as appropriate for such application (hereinafter referred to as "Rehabilitation Areas") ; and WHEREAS, Program is administered and funded solely by City for purposes of the control and prevention of blight, dilapidation and deterioration of Rehabilitation Areas; and WHEREAS, pursuant to Program, City has undertaken to share the cost of facade improvements to certain structures within Rehabilitation Area, pursuant to the criteria set forth herein; and WHEREAS, Owner owns at least 500 of subject commercial building(s) , or is the tenant of commercial building(s) located within Rehabilitation Area, with owner having provided the owner' s consent and authority to participate in Program pursuant to the terms and provisions of thi.s Agreement . NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the sufficiency of which is hereby acknowledged, the parties hereto hereby agree as follows : Section 1 . The total approved project costs for the facade improvements for the structure referred to at Section 16 herein shall be $61, 004 . 00, as set forth in Attachment A attached hereto (such total approved project costs for facade improvements are hereinafter referred to as "Eligible Costs" and such structure is hereinafter referred to as the "Structure") . The City shall pay the Owner a sum not to exceed $21, 351 .40, being 35% of the total Eligible Costs, for facade improvements to the structure approved pursuant to the provisions of this Agreement . The project shall be confined to approved improvements made to that part of the Structure visible from any public right-of-way. All parties hereto agree that all payments from the City provided for herein shall .be made to Julia Hugee-Pedersen, who shall provide the City with a full release upon receipt . Section 2 . Eligible costs shall include labor, material and equipment costs, and such other costs as may be reasonably necessary for the execution and completion of the facade improvement hereby provided 1 for (hereinafter referred to as the "Work" ) , as designated from the design drawings and specifications approved by the Project Review Team pursuant to the provisions of Section 3 herein and prepared by Consultant (hereinafter referred to as "Plans" ) . Section 3 . No Work shall be undertaken or shall be considered to constitute the basis for an Eligible Cost until the design for such Work has been submitted to and approved in writing by the Project Review Team, consisting of the City' s Urban Design and Preservation Specialist and City' s Principal Planner, and any other member designated on the Project Review Team. Such design shall include, but not be limited to, a date certain by which the Work shall be completed. In no event shall such Work be completed more than one hundred eighty (180) days from the date of this Agreement, without the written consent of the Project Review Team. Section 4 . The Project Review Team shall be permitted access to Structure to periodically review the progress of the Work. Such review shall not be in lieu of any other inspections which may otherwise be required by law or by City. Any and all portions of the Work which do not, in the sole discretion of the Project Review Team, conform to the Plans or other applicable terms of this Agreement, shall be made to conform to the Plans and other applicable Terms of this Agreement upon written notice of the existence of such non-conforming portions. Section 5 . Upon completion of the Work, and upon final inspection and written approval by the Project Review Team and such other final inspections and approvals as may be required by law, Owner shall submit to City: (1) an executed, notarized itemized contractor statement reflecting the total cost of the Work and each portion thereof, including, but not limited to, the cost of labor (whether provided by any contractor or subcontractor) , materials and equipment; (2) copies of all bids, contracts and invoices submitted, executed or incurred pursuant to the Work; and (3) reasonable proof of payment of all costs incurred pursuant to the Work. Section 6 . City shall pay to Owner the sum provided for at Section 1 herein within thirty (30) days of owner' s compliance with the provisions of Section 5 herein. In no event shall the amount paid to Owner exceed the amount specified in this Agreement or in the contractor statement. Section 7 . In the event Owner fails to complete the Work in accordance with the terms of this Agreement, or otherwise breaches the terms of this Agreement, City may terminate this Agreement upon written notice of breach and termination to Owner, and any and all financial or other obligations on the part of City shall cease and become null and void. Additionally, Owner shall refund to City, all money paid to Owner by City pursuant to this agreement upon thirty (30) days written demand. This provision shall not constitute a restriction on City to pursue any and all other rights to which it may be entitled. by law. Section 8 . Upon completion of the Work, and for a period of five 2 (5) years thereafter, Owner shall properly maintain the Work in its finished form, without alteration or change thereto, and shall not enter into any agreement, or take any other steps to alter, change or remove such Work, or to create or undertake any other Work which may constitute a deviation from the Plans, without prior written approval from the Project Review Team in its sole discretion. Section 9. Nothing herein is intended to limit, restrict or prohibit the Owner from undertaking any other Work in or about the subject premises which is unrelated to the facade improvement provided for in this Agreement . Section 10 . This Agreement shall be binding upon City and its successors, and upon Owner, Owner' s successors and assigns for a period of five (5) years from and after the date of completion and approval of the Work. Owner shall provide subsequent Owner(s) of Structure with a copy of this Agreement . This Agreement shall run with the land underlying Structure. Notwithstanding the aforementioned five (5) year period, the provisions of Sections 7 and 12 herein shall survive the termination of this agreement . Section 11. If Owner does not own the underlying property for which Work is being done, Owner warrants and represents to City that Owner has a lease at the location for which the Work is proposed for a term of at least six (6) years. Owner further warrants and represents that he/she has received authorization from all owners of the property for which Work is to be done to accept funds under this program and to undertake the Work. Further, such owner (s) of the property for which Work is to be done hereby acknowledges that he/she is aware of this Agreement and authorized the Work which is to be made to the Structure. Said owner(s) of the property for which improvements are to be made further acknowledge that, as owner of the property, he/she is a party to this Agreement and is bound by the provisions of this Agreement specifically, but not limited to, the provisions of Section 6 of this Agreement. Each "Owner" signature hereto hereby warrants and represents that there are no other entities having an ownership interest in the Structure, which have not executed this Agreement . Section 12 . Owner shall defend, hold harmless and indemnify City from and against any and all causes of action, suits, claims for damages, and any and all other liability, which may arise out of or in connection with Owner' s or Owner' s agents, employees and assigns' negligent performance of any of the terms of this Agreement . In the event the provisions of this Agreement are invoked so as to require legal defense of City, counsel for such defense shall be of City' s choosing. The provisions of this section shall survive any termination and/or expiration of this agreement . Section 13 . This Agreement shall not be construed so as to create a partnership, joint venture or employment or other agency relationship between the parties hereto. 3 Section 14 . This Agreement shall be subject to and governed by the laws of the State of Illinois. The parties hereto hereby agree that venue for any and all actions which may be brought by each and either of them to enforce the provisions of this Agreement shall be in the Circuit Court of Kane County, Illinois . Section 15. The terms of this Agreement shall be severable. In the event that any of the terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any reason, the remainder of this Agreement shall remain in full force and effect . Section 16 . This agreement is the only agreement between the parties hereto. There are no other agreements, either oral or implied, between the parties hereto. This agreement may not be amended or modified without the express written agreement of the parties hereto. Section 17 . Owner' s Name: Julia Hugee-Pedersen Address : 715 N. Spring Street City: Elgin, IL 60120 Telephone Number: (847) 476-1327 Property Location: 43 DuPage Court Ownership Interest : property owner Contact Person: Julia Hugee-Pedersen IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date first appearing above. As to CITY OF ELGIN As to OWNER: c By By: / David Dorga /;""Julia e -Pedersen City Manager L.= Property Owner ATTEST: Dolon a Mecum, bC' ty C e 4 sn = City of Elgin Agenda Item No. January 23, 2004 TO: Mayor and Members of the City Counc' FROM: David Dorgan, City Manager ALIVE DOWNTOWN Sarosh Saher,Urban Design & reservation Specialist SUBJECT: Facade Project for 43 DuPage Court DBA Al's Caf6 & Creamery - Owned by Julia Pedersen PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider a Facade Improvement project for the property located at 43 DuPage Court, d.b.a. Al's Caf6 & Creamery. RECOMMENDATION It is the recommendation of staff that the City Council approve the Facade Improvement project proposed for 43 DuPage Court to be retroactively funded in an amount of$21,351.40, since the completed work meets the design and scope of work requirements of the Facade Improvement Program. BACKGROUND The property at 43 DuPage Court is located in downtown Elgin and is one of the significant buildings in downtown Elgin. The owner, Ms. Julia Pedersen who owns and operates Al's Caf6 & Creamery at the property, is requesting funding from the Facade Improvement Program for cleaning and tuckpointing the exterior brick masonry, scraping and painting the exterior painted surfaces, and constructing a new accessible ramp to the front entrance of the building. The work to the project was completed in Fall of 2003. The property owner had submitted estimates for the work after it was completed, with the understanding that there was no guarantee of the City's retroactive participation. Additionally, on receipt of the documentation, the City was unable to even consider funding the project since FY2003 funds for the program had been expended for the year. The property owner was thus informed that consideration would be given to fund the project in 2004 when program funds would become available. The total eligible project cost is based on the lower of two required estimates for items of work, and amounts to $61,004.00. The City's share at 35%, if retroactive approval is granted, would amount to $21,351.40. Staff has inspected the completed work and has determined that, despite being completed prior to submission of documentation and approval by the City Council, it meets the Facade Facade—43 DuPage Ct January 23, 2004 Page 2 Improvement program requirements for scope of work and design. The exterior improvements will continue to preserve the architectural features of the building. The new ramp will allow the building to be accessible without detracting from its overall character. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Downtown Neighborhood Association, DNA FINANCIAL IMPACT If retroactive funding is approved, the City's cost associated with Facade Improvement project at 43 DuPage Court, Project No. 07989A, will total $21,351.40. There are sufficient funds available in the Riverboat and Riverboat Lease Funds, Downtown Business Facade Improvement Program, account numbers 275-0000-791.78-99 and 276-0000-791.78-99. A total amount of $150,000 is budgeted and available.. LEGAL IMPACT If retroactive funding is approved an agreement between the City of Elgin and property owner of 43 DuPage Court would be required. ALTERNATIVES 1. Approve the Facade Improvement project proposed for 43 DuPage Court to be retroactively funded i n an amount o f$21,3 51.40, s ince t he c ompleted work in eets t he design and scope of work requirements of the Facade Improvement Program. 2. Reject the request to fund the Facade Improvement project since the work is already completed making the project ineligible for funding. Respectfully Submitted for Council consideration. SBS/sr Attachments roll 43 DuPage Court—Julia Pedersen Center City Facade Improvement project—FY2004 New Awnings over Richter Awning Co. $4,590.00 Munzinger Williams, $3,240.00 windows Inc Masonry repairs and Seyller's,Inc. $24,900.00 Walter Grzebieniak $16,100.00 restoration Exterior Painting Quality Painting and $25,410.00 Sheppard Painting& $24,000.00 Decorating decorating New Handicap ramp and Seagren Construction, $22,775.00 W.F.Wetzel $17,664.00 front stoop reconstruction Inc Construction Co. Guard rail for ramp City ornamental iron $3,857.00 No second bid works Total Higher bids $81,532.00 Lower bids $61,004.00 Total eligible project costs - $61,004.00 City participation 35% - $21,351.40 DOWNTOWN FACADE IMPROVEMENT PROGRAM APPLICATION FORM A non-refundable fee of$50.00 must accompany this application. Checks should be made payable to: City of Elgin -Facade Improvement Program. 1. Applican ts LlA A4 ---,E —AAS�' Phone: (917) Home Address '7/S N. 511e)116 ST City/Zip: ��i�yf �L pia/Zrj Business Address _1/3 AAge Cr- City/Zip: X 6az/> ,) 2. Address for the building or establishment for which the rebate is sought: ZZG%v ZC 6o/z o Applicant is: Owner_ Tenant If tenant,what is term of lease? 3. Total number of storefronts: 69 A, Addresses of storefronts: e7- e5z6/x> p/w Total number of stories: /.uy-t Adi5(_ ' Facade to be improved: Front Side !/ Rear (i 4. Proposed use of program: Canopy/Awning _< Signage Windows/Doors X Exterior Lighting Painting/Tuck Restoration of Architectural Feature X Brick Cleaning �_Landscaping Other(please specify) Ly9V�i C'/t4 /\dp AQs�� 5. Statement of Understanding: A. The applicant(undersigned)agrees to comply with the guidelines and procedures of the Facade Improvement Program and the conceptual design and outline specifications as agreed to by the applicant and the application review team. B. The applicant understands that the applicant must submit detailed cost documentation, copies of building permits, buds, contracts and invoices and contractor=s final waivers of lien upon c plet n of the approved improvements. Applicant Signature If the applicant is other than the owner, the following line must be completed: I certify that 1, the owner of the property at do authorize the applicant to apply for a rebate under the Facade Improvement Program and undertake the approved improvements. Owner Signature Date FOR OFFICE USE ONLY Date Application Received: Application Fee Paid: Yes 1 4 03 . No V-' '6o• If yes, Check ✓ Cash Application I.D.Number: 0-11 89 A NbTe kg0W CZI- tMW ON P"3 MT . Rebate Approved: Date Total Estimated Project Cost 6 1 Do4"'O� Percent Applied for Rebate -35% Total Amount of Rebate 4.,241-3 C.; LF0 Rebate Denied: Date Reason Program Coordinator NurE n4v ot Ro soo�ww -rp-q(�a /jt&"�Dj -i>kpv" C141KETUD- Q City of' Elgin Mayor Ed Schock Council Members Juan Figueroa Robert Gilliam September 17,2003 Brenda Rodgers Thomas K. Sandor John Walters Marie Yearman Julia Hugee-Pedersen City Manager 43 DuPage Court David M. Dorgan Elgin, IL 60120 RE: 43 DuPage Court—Application for Facade Improvement grant Dear Ms. Pedersen, Thank you for your interest and submission of an application to the Facade Improvement Program for the above property. Your property is located within the boundaries of the program target area and qualifies to be considered for a grant. The type of assistance that you are eligible to be considered for is: 35 percent of the total cost of improving building facades, to a maximum of$100,000, with an additional $50,000 provided to high-impact projects. However before a grant can be allocated to the project,the following documentation needs to be submitted and following points need to be noted: 1. Application fee of$50.00 to participate in the program. Please make a check for P P P �" the required amount to the City of Elgin. 2. Specifications on the work proposed to be completed on the building. I would be happy to meet with you at the property and help you put together the specifications that would meet the requirements of the Facade Improvement Program. Additionally, from the proposed work outlined in the application, it appears that there may not be a need for the services of an architect to draw up plans for the work. Please note that work already completed on the property is not eligible for funding under the Facade Improvement Program. 3. Once specifications are prepared, you can bid out the project to obtain cost estimates of the work. Please note that the program requires that a minimum of two cost estimates are required for all work to be completed under the program. 4. The scope of work and cost estimates will need to be approved by the Elgin City Council along with a grant allocation for the project. The grant will be based on 35%of the total project cost. An agreement will also need to be undertaken between yourself and the City of Elgin to participate in the grant. Work may only proceed after the agreement is fully signed by all parties. * Please let me know when you would like me to stop by the property to meet with you so [ that we can discuss the scope of work and specifications in order to enable you to bid out 150 Dexter Court • Elgin, IL 60120-5555• Phone 847/931-6100• Fax 847/931-5610•TDD 847/931-5616 ® Printed on recycled paper www_cityotelgin.org Julia Hugee-Pedersen Page 2 September 17,2003 the projects. At this time,I will also take photographs of the existing condition of the exterior of the building for documentation purposes. In the meantime, if you have any questions,please do not hesitate to contact me at (847) 931-5943. Sincerely, Sarosh B. Saber Urban Design &Preservation Specialist � 9I�91o� AFE CREAMERY 43 DuPage Court Elgin, IL 60120 phone: 847-742-1180 - fax: 847-742-13§7 'r, � , 2002 11:37 6476834901 RICHTER AWNIR3 CO PAGE 02 r 847/683-4904 Richter Awning Co., Inc, Fax 84 /683-4901 P.O. Box 832 Hampshire, Il. 60140 147 Mill St. PROPOSAL CuTrom ,R JOB LOCAnQN_ Name:Al's Cafe Address: 43 Dupage Ct RECEIVED Elgin, Il. 60124 1 t NOV 200 phone: 742- 80 `' Attn: Julie Date: June 03, 2002 �1 g►,rk to be done: Provide and install 8 rigid frame, fabric covered awnings on 3 sides of building. 6 of these units will be on upper windows and 2 will be on lower windows.Unit over service area will be under transom window. Choice of acrylic fabric. A didonal wQ& NOTE - All material is guaranteed to be as specified,and the above work to be performed in accordance with the drawings and specifications submitted for the above work and completed in a workmanlike manner.Price does n� rk,de any city permit fees or charges Total Price: $4,590.00 Tennis: 50%deposit, Balance upon completion. Respectfully Submitted, Richter Awning Co.,Inc_ Note:This proposal may be withdrawn if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfact,ory and are hereby accepted.Payment will be made as outlined above. In the event the terms are not met as described,Richter Awning Co.has the option to remove and bold the furnished goods until balance is paid.A reinstallation fee will be charged.Interest on late payment is 1 112%per month. Today's Date: Signed: r 847-381-1878/ 1992 4WNINGS $ CANOPIES fax 847-381-2063 /2028 srgn * Manufacture * Instali AM, rum *Vnyl * Synthetic * Backlit 1<r-TRACTABLE AWNING SYSTEMS Residential and Commercial PROPOSAL 5250 e J.Fad 27W982 Commercial Av DATE 10/18/02 7-381-1878 Lake Barrington,IL 60010 Fax 847-381-2063 Proposal sobmined to lob Name Al's Cafe Sna+ )ab Location 43 DuPage Ct. RECEIVED City,star,,,Zip psl Elgin,11 60120 Q'y' 1 t U3 847-742-1180 Attrntion Fu Julia Hugee-Pedersen 847-742-1387 Ve propose one of the following: Option#1: Recover and install(8)Eight Existing Awnings with new Sunbrella fabric in your choice of available colors. We will use the existing frames and hardware. Installed Cost:$2,480.00 Option#2: Manufacture and install(8)Eight Mansord Awnings. The fabric will be Sunbrella in your choice of available colors. The awning frames will be of welded construction using'/,"& 1"galvanized structural steel tubing. All welds will be Primed and painted silver to match the tubing. The frames will be installed to a wood/brick surface. Installed Cost:$3,240.00 Option#3: Manufacture and install(1)One Removable Wind Panel over the front entrance. The fabric will be Sunbrella in your Choice of available colors. The frame will be of welded construction. Installed Cost:$342.00 ill permits required must be obtained by you at no cost to us. ,11 taxes are included. )elivery in approximately 4 weeks from date proposal is signed,deposit is received,fabric color has been approved and shop drawings are pproved. Shop drawings will be prepared on receipt of a signed proposal. lease call us if you have any questions or would lice to discuss this proposal. Your salesman's name is Lee Ford. Ve Propose to furnish material and labor-complete in accordance with the above specifications,for the sum of As stated above. TERMS: 1/2 Deposit is required with a signed proposal and the balance will be due on installation/delivery. Tuck 011 MINC 6MASONRY - F&.1 j65 F.O.BOX 7 - BURLINGTON,IL 60109 • (847)683-9000• FAX(847)653-9003 may.12,2003 RECEIVED NOV I ;..Julia Pedersen Al's Cafe 43 DwPage Court PO Box 505 Elgin,iL 60121-0505 . . 847-742'1180,Fax 847442-1387. Masonry restoration and repairs to building. $24,900.00 Scope of work A) Cleaning ofall:exterior masonry on north and east elevation • One`applicatiiin of SureKlean tID Restorat ion.Cleaner applied to masonry surface. Chemical.to be removed with power wash.Prre Jo below enough so as not to damage masonry. • Chemicals to be applied and removed according to manufactures specifications. Owner to provide adequate water source= Possible seepage of water around-window and door openings. B) Repointing. l) North and.east elevations/facebrick. •r Repoint all open;fractured (not hairline fractures)and unsound mortar joints. Mortar joints to be cutback a minimum of l''/2 times the thickness of mortar joints: Repointed joints are to.match existing mortar joint profile and color as closely as possible. 2) South-elevation/common brick. • Repointall open;fractured (n hairline fractures)and unsound mortar joints: Mortar joints to be cut back a minimum of4''prior to pointing:, Repointed mortar joints to.match existing mortar.joint profile and color as closely as possible. C) Chimney repairs. . 1) Rebuilding and repointing south chimney. Remove chimney down.to limestone trim pieces and rebuild same. • Cut out and repoint.i00%on lower section of chimney.Match existing mortar joint profile and color as closely as possible. Match existing brick as closely as possible. • Replace defective flue.liners in section of chimney being rebuilt • Pour new concrete cap on top of chimney. • Seal base of chimney at roofline with plastic roof cement. Serving the Fox Valley Since 1955 Page TAl'sCafe RE EIVED NO 1-1 r�0II3 2) Repng of north chimney.' • Cut out a'nd repoint all mortar joints-above roofline Match existing mortar joint profile and,color as closely as possible. • Repati firactures.in existing.concrete cap. _ " Seal bas of chimney.at roofli- with plactic roof cement.. D) Repairs to column at.left of:front entrance: • Stab ilize column wtth'_sainless steel-rod an'&epoxy: Repair cracks in b_ rick and limestone:with Jahn Restoration Mortar,�s supplied by Cathedral"Stone Products-.i • Repair mortars are to match areas surrounding patch as closely as possible. *Permits not included_ If total price is nne thousand dollars or niore,twenty percent pf total price is to be paid at the start of project with .balance'due upon comaletion. If total;price is.less than one thousand dollars,total is due won corrtpletion: One year warranty- All material is guaranteed to be as specified. All work to be completed in a workman-like manne according to st2nda-A practices..Any alteration or deviation from above specifications involving extra costs will"be executed only upon written orders,:and will become.an extra charge over'and above"the estimate: All agreements contingent upon strikes,accidents or delays beyond-our control.Owner to carry fire;tornado and`oiher necessary insurance_ Our workers are Uly covered by Workmen's Compensation Insurance. This proposal may be wit'hdrawn by us if not accepted within 60 days. Date l J r0 O\ Authorized Signature Acceptance of Proposal The above prices, specifications and conditions,are satisfactory and are hereby'accepted. You are withoiized is do the work as slsecifed Payment will be made as outlined above. Date of Acceptance,. Signature Signature (Please sign and return original to Seyller's Inc- 10/02/2003 10:56 18478653577 C-RZEBIENIAY PAGE 02 P140 : (8 } 885-3577 OVER 7S YEARS OF SERVICE (7 ) 774-7494 `IlHai er Cir ebteitf a.k BUILDING MAINTENANCE, INC. RECEIVED TUCKPOINTING ���' j L"UJ CHIMNEYS REPAIRED- REBUILT ALL TYPES OF MASONRY WORK DONE ]SA IZO A BLVD_ HOFFMAN ESTATES, IL 60194 ��,rJ11�►r�•- � `� � ��x ��1 a - ev l rYzl 21n Atq;A ct ��°� = , . p/-c lei J, 4-.-j.4ry IA;�'* -/- v L0 021,2003 10,56 12478853577 C 2ZEBIEraIr�K: PAGE 03 PFifJN :(8 ?885-3577 OVER 75 YEARS Of SERVI& V ) 774-7494 F ) a 'i ` 4o-ker Grz�bienia - RECEI V _ BUILDJNGMAINTENANCE, INC. �� TUCKPOINTING CHIMNEYS REPAIRED-REBUILT ALL TYPES OF MASONRY WORK DONE 485 A IZO A BLVD. P ,A*<� �,�— HOFFMAN ESTATES. IL 60194 �,Frr�► o 42 1 ,rte► ' ►�,[ ear rCjd ccl� se- e tv�� ! J P fra� A r 40Y�,)f �> Z4 � �a✓ Ak n/rnr✓� , c � 1.11-ICH w��1, �t,.[ ar- �v � .- +•�r�+-� all hm* -• Lrs�a-c oriz� RECEIVED ! STRUCTION INC. May 29, 2002 Mrs. Julia Hugee-Pedersen 43 DuPage Court Elgin, IL 60120 Re: INSTALLATION OF NEW HANDICAP RAMP & EXISTING STOOP REPLACEMENT Dear Mrs. Hugee-Pedersen, We would like to begin by thanking you for the opportunity to offer you with a cost proposal on your improvement project. Please review our below proposal. This price includes: • Install of new concrete handicap ramp • Replacement of existing front stoop • Steel shoring to support new stair slab • All necessary handrails • Any applicable permits Exclude: • Architectural or engineering fees The scope of work as outlined above may be completed for the price of $22,775. As you probably know, Seagren Construction is very experienced in this line of work and could begin work immediately. Once again, thank you for the opportunity to provide you with a quote. Respectful)y submitted, Jeff eagren 103 North State • Hampshire, IL 60140 (847) 683-9440 • Fax- : (847) 683-9442 Proposa �, Proposal No. 12377 Con6cccction Cno FII W. F. WetZee p• Sheet No. 1 (( 725 Schne<i.den Dki.v e Unit #2 - Date 8-1-03 Fax.# (847) 742-9852 - RECEIVED South Etg,in, It.tinoiz 60177 Phone (84-7) 742-6453 (R is I I n!f;j Proposal.Submitted To Work To Be Performed At dame Juti.a Pedelu5en Street 43 DuPaq e Cou,it itreet 43 DuPa e Count City Etg i n, State IfIlaniA :ity Efqin I Date of Plans itate Architect elephone number We hereby propose to furnish all the materials and perform all the labor necessary for the completion of CONCRETE WORK AS PER_ SKETCH DATED 6 ATTACHFD 5-?1-03 #1_ Temp_ Aho&iny £ daAt Ontertinn hu Can,thar-tnh #2. Worcft to beq in at 6:00a-m- to 12:00 hea i n ann n 0 1 :00 n m aA agA00d #3. Att exeeAA mat i-ae hauled atu U 41Inm AitP_ #4, AU wo4h to be eompLeted aA 12etr_ C lLj Code f A_D_A_ RPquJ.4emPatA #5. Conthaetan to meet 'with Citq Eng4_ Dept beAnhP utnhh heainA #6, Con Aac tort to A ecm e 8 patj- nh bu,i,Pd,i ny neh m,it #7. AU saAetij ztep6 to be taken to ntcntnct urn k aAipa E nubl r r #8. ContAac t A to catt Ju,P i e to man►z Uti Ut PA , d Phnh nu hd # Celts. o4 Inzmanee- to be Rent to nw eh . Bank aA h ecaoA.tPd �I rial is guaranteed to be as spec ifi ed, and the above work to be performed in accordance with the drawings ind specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Dollars ($ 17,664.00 ) vith payments to be made as follows: Seventeen Thouzand, Six Hundhed S-ixtts Foua DottahA E 500 when 50%' o6 woAk .cis comp eted, Ba,tance 10 day'A a4teh comn,E etion no utohfz any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will >ecome an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our :ontrol. Owner to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public .iability Insurance on above work to be token out by 4? ._,qr Respectfully submitted Wa.t teA F. Wetz e,L, Ph PA,id eny Per W. F. Wetz et Con6tAucti on Cohn_ tote—This proposal may be withdrawn by us if not accepted within 10 days ACCEPTANCE OF PROPOSAL -he above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as ,pecified. Payment will be made as outlined above. E ' kccepted Signature )ate Signature PS FORM 3450 �, O11ISlZ003 g Al's Ice Creamery atiflg & Decorating Q DS�I 43 Du~C IL 60120 73 M s M 847/742-1180 aaerior Ptiaait;etift &Md Tat l4oat lbet-Ike grandditg vp of wtoed said stela!lain www- RECEIVED aemm pow d6w beek wela col av d dpareiati semaawl uWals. f k a V aaitd oat wood aaa..,ea.t�wt�lt..�aao�,ea.a�a�l,r.a�s. bald mub sted trial sear wii a M ark*m w amaar+z paint said cho al nddw. amd rawk6 wA d b eeaarert slat=l& l ra.c •+•s )r lr�araea aoavardoigpiimm 611 aatb od bales is staid adti 4p"pefta apply aait ooaa dad aook aftwhd taaad P6w b mod win seers, psis ban wood wM ltaatla Wm@d*A rd pie w c kJoiets t d, e m wood saidwood tobd*joie.acs seeded vdmg a tp cube list perfonn nce raced cauk dubw apply two eoar of a PWAM W&hits l* colors n direr b be doW4 betUd 66aiat6 vWw a 6 color=how i staler oWw.2�wow soinw,2 r bw nomw oei M 1 mote�c coaepiymoafisry color )dooes• r own vteaish mix#wedlrsrisal ad chowAcd s owd aastfao& ateld act wood anu aftbak salad wo ft said necira kal saie+de apply alai coat Zar ad 2kAL aP*two wear bGCKhwd'a ldmiae ands SM WNW sa■dieg bstwem touts. (c=asks and baler it doors cm be Mbd aft a wood ap0q podeM cost for"prooedon is no included in peinft PiM gives sod is greed at$43,00 Par!calm pas raiaaarW boa dmM delludy be eonddemd as it wits pvrfly improve alt are not becatrtird in paijeNtm prise.A mechankat lift will he usrd in the,painting of the theft add will m"i epartial blocift gffO aAtr~md O*wailk d of Ik shave steps am Deoeastaty in gat whist wit M ddw in aooept*k Paint lob:U we went only allowed to do the basic scrape d pteimt type cd job tbtt meet btutiotse a"traess 91t ae world have to put it in oar oonuw that we wmM no Smmu ae the too- aikif of aba ptskt at all d of the shave prioes we based as ow aapaiaaioa in wadit vA&older buildings.Older buildings am w-U t umm for their abil- to hidt&*fawn sad as ses*ar taaMM SO ZW b SIMONS the pine alooted to cover cosy mexpoctod additious to the above oposed wv&No sddkiooal work wig be v,, It arsd Of costa iacw Md w about the expr and permission of the ow wr. ftg pqmds signed and received in the 30&p aAw rite bid date are wblect to not only to your Khedute and our scbedilte. d Mather Abp srbedta t also Said SO 01=11 sap elder are is wdite is MW hairless otherwise noted 4eer to sevpply a wens to waftr and�dsabfa ►t heeaby pvpose 110 lbeaiii eailrrlal(aoirrs Ifid Gard)std labor teopieled io a000adaeoe with 110 aibos►a sPsdgotliaAM :222.> S.t)Q JL,Mbor—5i6natut+e ey rea..t alts P eiwa m altett djs►r�+t�.lm.s drr Ierwls flee Jo►t)trltaw ar.lMes�airy. ttr aW cis iteatoios A essaos are*4t311 pr a" sosdts an aoearata#&)w part du& t uOwid qed"AS we.*to to eupkad is•wgbtaudie no. ..a.dt t we. -&ANY wrdwes rieui.w 2 u0s coo m tine.N be a wwM4 Wn�a 066,wd � eon show ow cos dwft so W%W OWMAa AN apeeamWs PeOP wj a"be.ri<let ws by eo itaaat .tea neiioML air dame brim*w on"awrr it to a4 in Mewway am w�tleiw jp *Nty un"w".An gigots grim mss Is Niseddy ea dwa f"PlM1 et wwe smarms G(M v s mired A0wPkm etQ&ppwd m rmpndhb lt.a/&soma r�neM a ails oci+efee duar 1+dea� A, iw,,,,,, ft,�.�� 7L slaw pion d SpudSO M w mti""al bNe QN*W�d Dowwaiwo io wtlorimd b do pftt rwe.tono%a"Mow All Pa Colon mad be Closets HEFO start ofPOW b. Time is as edditional Cllargat 1w any color changes AFTER the start of the lob. Heetttdrwsw to ree6ve any tel:paint from the yob. 01/15/2003 Painting Julia Proposal Al's Ice Creamery Fisnfing & D�CCOS'& 2li9 43 Dupage Ct ("70"-M1% ` Elgin, IL 60120 La n, slue 847/742-1180 ack of Building South fscigg side lywood wood covering windows and door openings,wood door and window trim, painted brick. scrape and sand to remove bore paint_ wash with TSP solution to remove dart near chalking- RECEIVED prime bare,wood with an ail base primer. prime bare brick with an acrylic base prism/. Lvv,� apply minimum one coat latex poise,to full coverage. one color for in areas. letal box and duct. scrape and sand to remove loose paint. wash with TSP solution to remove dirt and"king. pie rusty metal using Rust Dew*yw metal pruner.. apply minimum one cost bsex paint to full coverage. one color for all amens. wn esponOble for keepmg alley elsa►to allow access for ladders curd wwff P olds to be set-up weer to supply access to water read electric. 11 of the above steps are necessary to gat what we consider an acceptable paint job, If we were only allowed do the basic scrape and Paint type of job that most business owners get, we would have to put it in our rntract that we would not giwrantee the kmqpvity of the paint. E1 of the above prices are based on our experience in working with older buildings. Older buildings are well gown for their ability to hide their Saws. and as such we reserve the right to amend the price quoted to ever any unexpected additions to the above proposed work. No additional work wilt be performed or costs cared without the wxpreased permission of the owner. e haeby pltopoaa to fwmM 300"mil(mists etletwliae soled)and labor - - wploted in acmrdmm with the abvw A !b<:52,325.00 Authorized S*aanue ly tbeoelat d"prrlotis to Carl djol►lfaK d o� wt►io joie H�lrre�AM w�ia 7 days W doe,a i voioa A tbisaa ehrp et3%Iw ass&"M bo tpprodb all wooalats ti days me.&& miaatial is paaaad b be a orwAs t AN wtA r be osgipd a s watbredka 011 A. ma -VON%%a i) OMMUML Aar atasagss w dwmAn /bas as above Owsm ta5wtists aevatvsl�mats onms ae etas IM lased ady W"Biala adas.mad !!erase,/al nears users War mad elan tie aijaa!atYSSeta AY�lssat'r attat{a�at 7bss penposaE may be wRhdtawn by us if mat s ftnalm, aaad,aK at delays byaad o9e saeataL osar Is M amsy AN swaey PWtY iraamim.Am wp�aaabesas be,a aeisawhera M abw/relrety le»w ea mad whin 30 drys. aanud arsrvioss esadasd.Aampk a arts'ea*sad w at�eilts b t$adto w es rsevnar is tb=aedi a army pgmna 73s slaw peioAS asid apaalBasaisss aw A �a1wby Qum p Md D"MMMS is VAhmmd to do the x Agssest will M me&as seeped _- sue,.,: _ Ali Paint Colors mast be Chosen BEFO start o he eb. There is an additional Chrrlte for any color chances AFTER the start of the job. Homeowner to recent any kfy=r paint from the job. [Uaining�&t De corating RECEIVED ( ff7-9 !f ' �E ti S ICI. a,. Hello htlia, Just dropping you an extra note to ket you know I still drive by and gaze at your building with longing! Every time I go to the post,I drive the long way, I can just we myself hanging like a trapeze monkey off your fascia painth*happily.... Anyway,I would aba AAdy has to We this job without trying some sort of negotiation with you. I would like to reconsider and at least try to compare apples to apples. If you would let us, we would be happy to take one of your other bids(after you mark out their prices,of course) and rebid using their prep quality standards and products instead of ours. It would negate our guarantees, which are the best in the business, but I know that there is no ether company out there who could do the beautiful job that I can do paring that buddiag. John and I have talked about it all winter and he did say that we could offer on the current con- tract as it stands,to include color eonsuhatim for free(we charge$45.00 per hour, plus all the paint pur- chased for samples, minimum$1500.00)and drop the bid by$3000.00. There would be no lowering of work standards car product standards to accommodate the drop in pricing. We would also be more than mdUing to work out a payment schedule with you. I cannot afford to do this and not make a profit,but I really want to paint this building....you have made your restaimA a destination for ice c rc nr, I can add to that by making it a destination for historical beauty, something that EJ&is already known for, something that you can capitalize on. Please;go thru our paper work before you make any decisions, ask questions of your other con- tractors. Hopefully we will hear from you, if not,no hard feelings, of course,you cannot blame us for trying, and we will still admire you beavtiM property and enjoy you delicious food all summer long! Have a profitable year! Hollyce Sheppard Painting & Decorating RECEIVED 348 Cooper Avenue Elgin, Illinois 60120 a 1 L # ����� 847/742-5697.847/477-4420 PROPOSAL IL F`- Dear Sir: The undersigned pro to furnish mat an perf all labor necessary to complete the following: C'f:k z - t '- -2K ' 0C Lf . � a All of the above ork to be completed in a bstantial and workmanlike manner for the sum of Payments to be made P s to the value of per cent of all work ead. The entire amount of contract to be paid-,g; ,�n.-�-. days-afiax completion Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements s' must be made in writing. F The Contractor agrees to carry Workmen's Compensation and Public Liability Insurance, also to pay all Sales Taxes, Old Age Benefit and Unemployment Compensation Taxes upon the material and labor furnished under this contract, as required by the United States Government and the State in which this work is performed. Respectfully submi Contra r By ACCEPTA E n You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which the undersigned agrees to pay the amount mentioned in said proposal, and according to the terms thereof. j Date 19 r- FRC1M Panasonic FAX SlSTEN FNONE NO. Mar. 19 2001 09:39AM F3 1 Quotation RECEIVED City Ornamental Iron Works To: A? 'S Cafe Q 'Creamery 254 N. State St. 43 DoPage ^_t . Elgin, I1. 60123 rigin; 11. 60120 Phone: 847-888-8998 Phone: 74271180 Fax: 847-888-8898 Fax: 742--13$7 Date: 3/19/2001 Attn: Julia Note: All materials supplied and exed..Shop Coat ?riTaer. Only. Finish paint is by others :UX01. Stoop drawings included UNO. Quote limited to the . items . listed below', Al? other items are extra. All materials .guaranteed .for .one year, paint not guaranteed. All items are steel'"UN0, Item 4 1 . Shop drawing for approval., Optional. Total $ 300.00 Item # 2 . Supply and install approx. , 30. ft. Type ## 10 guard rail, with 46 ft si-de:: fnount and- valI .mount hand rail. 5 Ornamental: posts ins1-t�ded 1. See= t # 46 } . All materials are s./c p.r-3mer and s/c. Ein= 'sb painted. Total $> 3 ,51 57 .00 Note: Ramp to be approx 4k ft .y:ide, Minimum. $ ft 0 in. All permits and concrete work are -by: other§. Tom