HomeMy WebLinkAbout04-240 Resolution No. 04-240
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
BOWEN ENGINEERING FOR THE FOX LANE BOOSTER PUMP STATION PROJECT
WHEREAS,the City of Elgin has heretofore entered into a contract with Bowen Engineering
for the Fox Lane Booster Pump Station Project; and
WHEREAS,it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1, attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN,ILLINOIS,that David M.Dorgan,City Manager,be and is hereby authorized and directed to
execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference.
s/Ed Schock
Ed Schock, Mayor
Presented: September 8, 2004
Adopted: September 8, 2004
Omnibus Vote: Yeas: 6 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk