Loading...
HomeMy WebLinkAbout04-203 Resolution No. 04-203 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH GETDOWN UNDERGROUND FOR THE BENT STREET SEWER SEPARATION PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Getdown Underground for the Bent Street Sewer Separation Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M.Dorgan,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by reference. s/Robert Gilliam Robert Gilliam, Mayor Pro Tem Presented: July 28, 2004 Adopted: July 28, 2004 Omnibus Vote: Yeas: 5 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk ELGIN,ILLINOIS PROJECT 339059 CHANGE ORDER No. 1 and Final CONTRACT: Bent Street Sewer Separation Project SCOPE: This Change Order No. 1 will provide additional items necessary to complete the Bent Street Sewer Separation Project in an acceptable manner. This change order affects a contract entered into between the City of Elgin and Getdown Underground of Batavia, IL, an Illinois corporation, dated April 12, 2004 for the Bent Street Sewer Separation Project REASONS FOR CHANGE: This Change Order No. 1 and Final is in the best interests of the City and is authorized by law. The necessity for the changes were unforeseen at the time of the original agreement, and the changes contemplated hereby are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount the contract will be revised is as follows: See Attachment A The original contract with Getdown Underground is $252,780.00. By reason of Change Order No. 1 and Final, the contract for the Bent Street Sewer Separation Project will be increased in the amount of eighty thousand six hundred twenty five and 88/100 dollars ($80,625.88). The new and final contract amount, inclusive of Change Order No. 1 and Final is three hundred thirty three thousand four hundred five and 88/100 dollars ($333,405.88). CHANGE ORDER No.! and Final June 30,2004 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of , 2004. Recommended: ENGINEERING DIVISION By: `� I Title: ,Z�,._;,...` �, Date: G' 5ef,--i' ¢- Accepted: GETDOWN UNDERGROUND Party of the S- -, d Part (Contractor) By: Title: e-w r//44 Date: 6/_, /e(7 Approved: CITY OF ELGIN Party of the First Part (Owner) By: Title: Date: V ugaTqzwpT KANE COUNTY,ILLINOIS Sewer Seperation-Bent Street CITY COST CENTER 4028 ENGINEER'S PAYMENT ESTIMATE CONTRACTOR'S JOB NUMBER: ESTIMATE NO.4 FROM JUNE 2,2004 TO JUNE 25,2004 CONTRACTOR'S INVOICE NUMBER: PAYABLE TO: Getdown Underground,Inc. 1311 N.Raddant Road Batavia,IL 60510 Tel.(630)761-9044 COMPLETED AWARDED AWARDED ADDED DEDUCTED TOTAL ROADWAY WATER ROADWAY WATER No. DESCRIPTION VALUE UNIT PRICE QUANTITY QUANTITY VALUE VALUE VALUE BASE BID 1 IL-19.OL,Bit Conc Bind Cse(Low ESAL)Superpave,N30,Mix I Ton 0 $0.00 $0.000 S0 00 SO 00 $0.00 2 Leveling Binder(Hand Method),Type 2 Ton 0 $0.00 $0.00 0 So 00 $0 00 $0.00 3 Incidental Bituminous Surface Ton 5 $410.00 10.5 $82.00 10 5 $86100 $0.00 $861.00 4 IL-9.5L,Bit Conc Surf Cse(Low ESAL)Superpave,N30,Mix D Ton 160 $13,120.00 196 $82.00 196 016,072 00 10 00 $16,072.00 5 Mixture for Cracks,Joints anf Flangeways Ton 0 $0.00 $0.00 0 $0 00 $0 00 $0.00 6 P.C.C. Pavement Removal-Complete Sq Yd 0 $0.00 1550 $0.00 1550 $0 00 $0 00 $0.00 7 Bituminous Surface Removal,Special Sq Yd 0 $0.00 $0.00 0 $0 00 $0.00 $0.00 8 Concrete Barrier Curb Ln Ft 0 $0.00 $0.00 0 $o 00 $0.00 $0.00 9 Bituminous Materials,Prime Coat,SS-1 Gal 60 $300.00 250 $5.00 250 $1,250 00 $000 $1,250.00 10 Class"C"Patches-8" Sq Yd 675 $19,575.00 1391.3 $29.00 1391 3 $40,347 70 00,00 $40,347.70 11 Combination Curb and Gutter Removal La Ft 500 $2,500.00 898.9 $5.00 898 9 $4,49450 S000 $4,494.50 12 Combination Curb and Gutter,B6.18 La Ft 500 $6,500.00 898 9 $13.00 8989 511,685 70 $0 00 $11,685.70 13 Sidewalk Removal Sq Ft 500 $1,000.00 496 9 $2.00 496 9 $993 80 $0 00 $993.80 14 P.C.C.Sidewalk,5" Sq Ft 500 $2,000.00- 496.9 $4.00 4969 $1,987 60 0000 $1,987.60 15 Driveway Pavement Removal Sq Yd 50 $450.00 72.1 $9.00 72.1 $648 90 $0.00 $648.90 16 P.C.C.Driveway Pavement,6" Sq Yd 50 $1,450.00 72.1 $29.00 72.1 $2,090 90 $000 $2,090.90 17 P.C.C.Driveway Pavement,8" Sq Yd 0 $0.00 $0.00 0 $0 00 $O 00 $0.00 18 Monolithic Sidewalk Removal Sq Ft 300 $900.00 2937.3 $3.00 22937.3 $8.811 90 $0 00 $8,811.90 19 P.C.C.Monolithic Sidewalk Sq Ft 300 $2,100.00 2737.3 $7.00 2737.3 $19,161 10 $000 $19,161.10 20 Manholes to be AdjustedEach 0 $0.00 $0.00 0 $0 00 $O 00 $0.00 21 Manholes to be Reconstructed Each 0 $0.00 $0.00 0 TO 00 SO 00 $0.00 22 Catch Basins to be Adjusted Each 0 $0.00 $0.00 0 10.00 SO 00 $0.00 23 Catch Basins to be Reconstructed Each 0 $0.00 $0.00 0 10.00 00.00 $0.00 24 Neenah R-1712-C,Frame with Closed Lid,390 Lbs/conceal pick hole Each 5 $875.00 5 $175.00 5 0 5875.00 $0 00 $875.00 25 Neenah R-1712-C,Frame with Type A Graze 390 Lbs Each 4 $700.00 5 $175.00 4I 500.00 $175.00 $875.00 26 Neenah R-3010,Type"L"Grate(4l0 Lbs) Each 0 $0.00 $0.00 0 $0 00 $0 00 $0.00 27 Neenah R-3010,Type"A"Grate(410 Lbs) Each 6 $1,200.00 11 $200.00 11 12,20000 $O 00 $2,200.00 28 Water Boxes to be Adjusted Each 0 $0.00 $0.00 0 $0.00 $0 00 $0.00 29 Sodding and Supplemental Watering Sq Yd 200 $2,000.00 400 $10.00 400 $0.00 $4,000.00 $4,000.00 30 Ductile lion Pipe-6" La Ft 0 $0.00 $0.00 0 10 00 $0 00 $0.00 31 Ductile Iron Pipe-8" La Ft 0 $0.00 $0.00 0 S0 00 $0 00 $0.00 32 5'Diameter Valve Vault, Each 0 $0.00 $0.00 o SO 00 $0 00 $0.00 33 Fire Hydrant to be Removed Each 0 $0.00 $0.00 0 00 00 SO 00 $0.00 34 Fire Hydrant Complete Each 0 $0.00 $0.00 0 $0 00 $O 00 $0.00 35 Ductile Iron Fittings Lbs 0 $0.00 $0.00 0 00 00 00 00 $0.00 36 Near Side Water Service Each 0 $0.00 $0.00 0 . SO 00 SO 00 $0.00 37 Far Side Water Service Each 0 $0.00 $0.00 0 SO 00 SO 00 $0.00 38 Reconnect Existing Water Service Each 50 $2,500.00 4 $50.001 $50 00 so 00 $200.00 39 6"Ductile Iron Pipe,Sanitary Ln Ft 200 $4,000.00 92 $20.00 92 0 $1,84000 so 00 $1,840.00 40 8"Ductile Iron Pipe,Sanitary Ln Ft 100 $2,000.00 22 $20.00 a 11 $220 00 $220 00 $440.00 41 Mudjacking Sq Ft 0 $0.00 $0.00 0 10 00 S0 00 $0.00 42 6"x 6"Pressure Connection Each 0 $0.00 $0.00 o 10 00 $000 $0.00 43 8"x 8"Pressure Connection Each 0 $0.00 $0.00 0 $0 00 10 00 $0.00 44 Pavement Saw Cutting,Special Ln Ft 0 $0.00 $0.00 0 10 00 S0 00 $0.00 w A. • COMPLETED AWARDED AWARDED ADDED DEDUCTED TOTAL ROADWAY WATER ROADWAY WATER No. DESCRIPTION VALUE UNIT PRICE QUANTITY QUANTITY VALUE VALUE VALUE 45 Catch Basin Type A,4 ft Diameter La Ft 6 $10,800.00 6 $1,800.00 6 $10,800 00 $0 00 $10,800.00 46 12"Ductile Iron Pipe,Storm Sewer Ln Ft 205 $17,425.00 251 $85.00 251 $21335 00 $0 00 $21,335.00 47 Class X Concrete,Retaining Wall Cu Yd 10 $1,000.00 $100.00 0 SO 00 $0 00 $0.00 48 Thermoplastic Pavement Marking,4" Ln Ft 700 $700.00 $1.00 0 $0 00 SO 00 $0.00 49 Thermoplastic Pavement Marking,6" Ln Ft 0 $0.00 $0.00 0 $0 00 $0 00 $0.00 50 Thermoplastic Pavement Marking,12" Ln Ft 0 $0.00 $0.00 0 So 00 S0 00 $0.00 51 Thermoplastic Pavement Marking,24" Ln Ft 50 $50.00 $1.00 0 00 00 $0 00 $0.00 52 Thermoplastic Pavement Marking,Letters&Symbols Sq Ft 0 $0.00 $0.00 0 $0 00 SO 00 $0.00 53 Aggregate Base Course Ton 0 $0.00 $0.00 0 So 00 So 00 $0.00 54 Traffic Control LS 1 $13,000.00 0.5 $13,000.00 0.5 86,500 00 $0 00 $6,500.00 55 Supplemental Water/Dust Control Unit 10 $10.00 $1.00 0 $0.00 So 00 $0.00 56 Supplemental Water-Sod-Entire job Each 10 $10.00 $1.00 0 $000 $000 $0.00 57 P.C.C.Barrier Curb Removal Ln Ft 0 $0.00 $0.00 0 $0 00 SO 00 $0.00 58 Catch Basin Type C,2 ft Diameter Each 2 $3,600.00 2 $1,800.00 2 $3,600 00 $0.00 $3,600.00 59 Manhole,Precast 6 ft Diameter Each 9 $34,200.00 10 $3,800.00 10 $38.000 00 50 00 $38,000.00 60 Brick Walk Removal and Replacement LS 0 $0.00 $0.00 0 SO 00 $0 00 $0.00 61 Valve Vault,Precast 6 ft Diameter Each 0 $0.00 $0.00 0 50 00 50 00 $0.00 62 8"Gate Valve Each 0 $0.00 $0.00 0 50.00 $0 00 $0.00 63 4"Gate Valve Each 0 $0.00 $0.00 0 80.00 $0 00 $0.00 64 Earth Excavation Cu Yd 0 $0.00 $0.00 0 $0 00 50 00 $0.00 65 Storm Sewer,36"R.C.C.P.,Ty 1,Cl IV Ln Ft 817 $69,445.00 458 $85.00 458 $38,930 00 $0 00 $38,930.00 66 Storm Sewer,12"R.C.C.P.,Ty 1,Cl IV Ln Ft 320 $20,800.00 325 $65.00 325 821,123 00 $000 $21,125.00 67 Storm Sewer,24"R.C.C.P.,Ty 1,Cl IV Ln Ft 258 $18,060.00 249 $70.00 249 017,430 00 $0 00 $17,430.00 68 Polyethelene Warp-8" Ln Ft 0 $0.00 $0.00 0 $0 00 S0 00 $0.00 69 P.C.C.Stairs Sq Ft 0 $0.00 $0.00 0 50 00 $0 00 $0.00 70 Bituminous Cold Patch Ton 100 $100.00 $1.00 0 S0 00 $0 00 $0.00 71 Ductile Iron Pipe-4" Ln Ft 0 $0.00 $0.00 0 $o 00 $0 00 $0.00 TOTALS $252,780.00 $272,010.10 $4,395 00 $276,555 10 ROADWAY ROADWAY MISCELLANEOUS EXTRAS AND CREDITS COMPLETED VALUE VALUE VALUE 30"Equivalent Ellptical Pipe Ln Ft 366 $56,850.78 366 $155.33 366 $56,850.78 $0.00 $56,850.78 $0.00 $0.00 $0.00 TOTAL MISCELLANEOUS EXTRAS AND CREDITS $155.33 $56,850.78 $0.00 $56,850.78 TOTAL VALUE OF COMPLETED WORK $328,860.86 $4,395.00 $333,405 88 DEDUCT RETAINAW0%) $0.00 $0.00 $0.00 BALANCE DUE ON COMPLETED WORK $328,860.88 $4,395 00 $333,405.88 MISCELLANEOUS DEBITS VALUE PREVIOUS PAYMENTS Payout No.1, April 30,2004 $30,667.00 $30,667.00 Payout No.2, May 14,2004 $121,045.00 $121,045.00 Payout No.3, June 2,2004 $55,339.00 $55,339 00 TOTAL MISCELLANEOUS DEBITS&PREVIOUS PAYMENTS $207,051.00 $207,051 00 NET AMOUNT DUE $121,809.88 $4,395.00 $126,354.88 APPROVED /14-'...---. 1.PR DATED b ~ 3 0 2004 NGINEER ` OF f � G ' ,cj2 City of Elgin7,1 E Agenda Item No. \K ro4u,Dx,, , L 0 AiOa: Wp July 9, 2004 "NI LI 1 � TO: Mayor and Members of the City Council 1113 r FINANCIALLY STABLE CI TY GOVEPNME NT EFFICIENT SERVICES. FROM: David M. Dorgan, City Manager AND QUALITY INFRASTRUCTURE John M. Loete, Public Works Dir ctor SUBJECT: Change Order No. 1 and Final Payment for the Bent St. Sewer Separation Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorization of Change Order No. 1 and Final Payment for the subject project. RECOMMENDATION It is recommended that the City Council authorize execution of Change Order No. 1 for $80,625.88 and authorize final payment to Getdown Underground in the amount of$126,354.88 for the Bent St. Sewer Separation Project. BACKGROUND On March 10, 2004, the City Council awarded the contract for the Bent St. Sewer Separation Project to Getdown Underground, Inc. This is the first phase of what is anticipated to be a three phase project. This project provided for the installation of a new storm sewer line on Bent St., Yarwood St. and Raymond St. The old combined sewer line will be used exclusively as a sanitary sewer line. Change Order No. 1 provides for a net increase to the contract of$80,625.88. The change order consists of one new contract pay item and increases or decreases to the quantity of several existing contract pay items. The new contract pay item is for 36 inch diameter equivalent elliptical pipe. Because of grade conflicts with existing sanitary sewer service lines, it was necessary to use elliptical pipe instead of round pipe to gain sufficient clearance over the top of the sewer service lines. The change of pipe type resulted in a net increase to the contract of $26,335.78. The remainder of the change order amount, $54,290.10, is increased restoration costs. The location of the new sewer line had to be changed in the field due to unanticipated utility conflicts with Nicor and SBC utilities. This resulted in the need to replace more curb and gutter and Change Order#1 &Final Pymnt for Bent St. Sewer Separation r July 9, 2004 Page 2 sidewalk then originally planned and increased the amount of concrete and asphalt repair to the roadway. A copy of Change Order No. 1 is attached as Exhibit A. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. 9//kA___ FINANCIAL IMPACT The final contract with Getdown Underground is as follows: > Original Contract Amount : $252,780.00 > Change Order No. 1 : $ 80,625.88 > Final Contract : $333,405.88 Payments made to date total : $207,051.00 Leaving a final payment of : $126,354.88 A copy of the final payment is attached as Exhibit B. r The final project accounting is as follows Project#339059 Acct. #384-4200-795.93-41 Acct. #398-4200-795.92-41 Budget $1,100,000.00 $26,740.00 Contract Award $ 252,780.00 Final Contract $ 333,405.88 Bid Advertising $ 416.96 Balance $ 766,594.12 $26,323.04 Sufficient funds are available in the above two account numbers to fund Change Order No. 1 in the amount of$80,625.88. Phases 2 and 3 are under design and should go to bid late this year. Based on current estimates, it appears that the current budget will still be adequate for all three phases. As plans are completed and cost estimates refined, we will get a clearer picture of that situation. If needed, additional funds will be requested as part of the 2005 budget preparation process. w9/17LEGAL IMPACT None. r Change Order#1 &Final Pymnt for Bent St. Sewer Separation rJuly 9, 2004 Page 3 ALTERNATIVES 1. Approve Change Order No. 1 and Final Payment. 2. Do not approve the Change Order and Final Payment. Respectfully submitted for Council consideration. (do) Attachments r