HomeMy WebLinkAbout03-4 Resolution No. 03-4
RESOLUTION
AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT
WITH CRAIG BAKSTAD
(213 E. Chicago Street)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna
Mecum, City Clerk, be and are hereby authorized and directed to
execute a facade improvement program agreement on behalf of the
City of Elgin with Craig Bakstad for the property commonly known
as 213 E. Chicago Street, a copy of which is attached hereto and
made a part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: January 8, 2003
Adopted: January 8, 2003
Omnibus Vote : Yeas : 6 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
CITY OF ELGIN
FACADE IMPROVEMENT PROGRAM AGREEMENT
213 E. CHICAGO STREET
THIS AGREEMENT is made and entered into this al,2,t- day of
�S Aj,) A C- , 200_3, by and between the City of Elgin, Illinois, a
municipal corporation rporation (hereinafter referred to as "City") , and Craig
Bakstad, the property owner, (hereinafter referred to as "Owner") .
WHEREAS, City has established a facade improvement program
(hereinafter referred to as "Program") for application within
certain areas of the corporate limits of City designated by City as
appropriate for such application (hereinafter referred to as
"Rehabilitation Areas") ; and
WHEREAS, Program is administered and funded solely by City for
purposes of the control and prevention of blight, dilapidation and
deterioration of Rehabilitation Areas; and
WHEREAS, pursuant to Program, City has undertaken to share the
cost of facade improvements to certain structures within
Rehabilitation Areas, pursuant to the criteria set forth herein;
and
WHEREAS, Owner owns at least 50% of subject commercial
building (s) , or is the tenant of commercial building (s) located
within one of these Rehabilitation Areas, with owner having
provided the owner's consent and authority to participate in Program
pursuant to the terms and provisions of this Agreement .
NOW, THEREFORE, in consideration of the mutual promises and
covenants contained herein, the sufficiency of which is hereby
acknowledged, the parties hereto hereby agree as follows :
Section 1 . The total approved project costs for facade
improvements for the structure referred to at Section 15 herein
shall be $110, 123 . 97, as set forth in Attachment A attached hereto
(such total approved project costs for facade improvements are
hereinafter referred to as "Eligible Costs" and such structure is
hereinafter referred to as the "Structure") . The City shall pay the
Owner a sum not to exceed $38, 543 . 39, being 35% of the total
Eligible Costs, for facade improvements to the structure approved
pursuant to the provisions of this Agreement . The project shall be
confined to approved improvements made to that part of the
Structure visible from any public right-of-way. All parties hereto
agree that all payments from the City provided for herein shall be
made to Craig Bakstad, who shall provide the City with a full
release upon receipt .
Section 2 . Eligible costs shall include labor, material and
1
equipment costs, and such other costs as may be reasonably
necessary for the execution and completion of the facade
improvement hereby provided for (hereinafter referred to as the
"Work") , as designated from the specifications approved by the
Project Review Team pursuant to the provisions of Section 3 herein
(hereinafter referred to as "Plans") .
Section 3 . No Work shall be undertaken or shall be considered
to constitute the basis for an Eligible Cost until the design for
such Work has been submitted to and approved in writing by the
Project Review Team, consisting of the City's Urban Design and
Preservation Specialist and City's Principal Planner, and any other
member designated on the Project Review Team. Such design shall
include, but not be limited to, a date certain by which the Work
shall be completed. In no event shall such Work be completed more
than one hundred eighty (180) days from the date of this Agreement,
without the written consent of the Project Review Team.
Section 4 . The Project Review Team shall be permitted access
to Structure to periodically review the progress of the Work. Such
review shall not be in lieu of any other inspections which may
otherwise be required by law or by City. Any and all portions of
the Work which do not, in the sole discretion of the Project Review
Team, conform to the Plans or other applicable terms of this
Agreement, shall be made to conform to the Plans and other
applicable Terms of this Agreement upon written notice of the
existence of such non-conforming portions .
Section 5 . Upon completion of the Work, and upon final
inspection and written approval by the Project Review Team and such
other final inspections and approvals as may be required by law,
Owner shall submit to City: (1) an executed, notarized itemized
contractor statement reflecting the total cost of the Work and each
portion thereof, including, but not limited to, the cost of labor
(whether provided by any contractor or subcontractor) , materials
and equipment; (2) copies of all bids, contracts and invoices
submitted, executed or incurred pursuant to the Work; and (3)
reasonable proof of payment of all costs incurred pursuant to the
Work.
Section 6 . City shall pay to Owner the sum provided for at
Section 1 herein within thirty (30) days of owner's compliance with
the provisions of Section 5 herein. In no event shall the amount
paid to Owner exceed the amount specified in this Agreement, which
ever is less .
Section 7 . In the event Owner fails to complete the Work in
accordance with the terms of this Agreement, or otherwise breaches
the terms of this Agreement, City may terminate this Agreement upon
written notice of breach and termination to Owner, and any and all
financial or other obligations on the part of City shall cease and
2
become null and void.
Section 8 . Upon completion of the Work, and for a period of
five (5) years thereafter, Owner shall properly maintain the Work
in its finished form, without alteration or change thereto, and
shall not enter into any agreement, or take any other steps to
alter, change or remove such Work, or to create or undertake any
other Work which may constitute a deviation from the Plans, without
prior written approval from the Project Review Team in its sole
discretion.
Section 9 . Nothing herein is intended to limit, restrict or
prohibit the Owner from undertaking any other Work in or about the
subject premises which is unrelated to the facade improvement
provided for in this Agreement .
Section 10 . This Agreement shall be binding upon City and its
successors, and upon Owner, Owner's successors and assigns for a
period of five (5) years from and after the date of completion and
approval of the Work. Owner shall provide subsequent Owner (s) of
Structure with a copy of this Agreement . This Agreement shall run
with the land underlying Structure .
Section 11 . If Owner does not own the underlying property for
which Work is being done, Owner warrants and represents to City
that Owner has a lease at the location for which the Work is
proposed for a term of at least six (6) years . Owner further
warrants and represents that he has received authorization from all
owners of the property for which Work is to be done to accept funds
under this program and to undertake the Work. Further, such
owner (s) of the property for which Work is to be done hereby
acknowledges that he is aware of this Agreement and authorized the
Work which is to be made to the Structure . Said owner (s) of the
property for which improvements are to be made further acknowledge
that, as owner of the property, he is a party to this Agreement and
is bound by the provisions of this Agreement specifically, but not
limited to, the provisions of Section 6 of this Agreement . Each
"Owner" signature hereto hereby warrants and represents that there
are no other entities having an ownership interest in the
Structure, which have not executed this Agreement .
Section 12 . This Agreement shall not be construed to create a
partnership, joint venture or employment relationship between the
parties hereto.
Section 13 . This Agreement shall be subject to and governed
by the laws of the State of Illinois . The parties hereto hereby
agree that venue for any and all actions which may be brought by
each and either of them to enforce the provisions of this Agreement
shall be in the Circuit Court of Kane County, Illinois .
3
Section 14 . The terms of this Agreement shall be severable .
In the event that any of the terms or provisions of this Agreement
are deemed to be void or otherwise unenforceable for any reason,
the remainder of this Agreement shall remain in full force and
effect .
Section 15 .
Owner's Name : Craig Bakstad
Address : 219 N. Fifth Street
City: West Dundee, Illinois 60118
Telephone Number: 847-488-1400
Property Location: 213 East Chicago Street
Ownership Interest : property owner
Contact Person: Craig Bakstad, property owner
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the date first appearing above .
As to CITY OF ELGIN As to OWNER:
By ` By:
Olufemi F lari Craig Bakstad
Interim C ' M ger Property Owner
ATTEST:
Dolonna Mecum,' City Clerk
4
City of Elgin Agenda Item No
November 15, 2002
ALIVE DOWNTOWN
TO: Mayor and Members of the City Council
FROM: Olufemi Folarin, Interim City Manager
SUBJECT: Facade Project for 213 E. Chicago Street
Owned by Craig Bakstad
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information to consider a
Facade Improvement project for the property located at 213 E.
Chicago Street .
E; BACKGROUND
The property at 213 E. Chicago Street is located in downtown
Elgin and was built at the turn of the last century. The
property owner, Mr. Craig Bakstad, proposes to rehabilitate the
existing facades of the buildings, addressing such items as
restoring the storefronts to their original configuration,
masonry cleaning, tuckpointing, window and door replacement,
exterior lighting, and canopy treatments . Work is also proposed
to be carried out to the rear of the property, visible from the
public alley, which will include reconstruction of the rear deck
and stairs and the attached vehicle shelter.
The architect for the project, Mr. Greg Berna of Berna
Architects and Design, in contract for the project with the City
since June of this year, has provided drawings, specifications
and an estimated cost of the project which will enable the
property owner to bid out the work.
The estimated project cost for the proposed work is $110, 123 . 97 .
The City' s participation at 35 percent would amount to
$38, 543 .39.
Facade - 213 E. Chicago Street
November 15, 2002
Page 2
Currently funds from the Center City Facade Improvement Program
account from which this project would have been funded are
depleted. However, there are funds available in the State and
National Street Facade program. The City does not anticipate any
more requests for funding under the State and National Street
program for this year, and therefore recommends that remaining
funds be used towards projects in the City Facade program.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None.
' FINANCIAL IMPACT
The total budget in the State & National Street Facade
Improvement Program funded under account number 275-0000-791 .78-
99, Riverboat Rehabilitation Grant was originally $150, 000 .
Currently a balance of $89, 298 remains in the account . The total
amount that will be allocated for the project at ,213 E. Chicago
Street amounts to $38, 543 .39 . A budget transfer would be
required from Riverboat account 275-0000-791 . 78-99 to the
Downtown Redevelopment account 350-0000-795. 78-99, project
number 079818 to fund this project .
LEGAL IMPACT
An agreement between the City of Elgin and property owner at 213
E. Chicago Street will be required.
ALTERNATIVES
1. Approve the Facade Improvement project proposed for 213 E.
Chicago Street to be funded from the State and National
Street program account in an amount of $38, 543 . 39.
2 . Reject the Facade Improvement project proposed for 213 E.
Chicago Street.
Facade - 213 E. Chicago Street
November 15, 2002
Page 3
RECOMMENDATION
It is recommended that the City Council approve the Facade
Improvement project proposed for 213 E. Chicago Street to be
funded from the State and National Street program account in the
amount of $38, 543 .39.
Respectfully submitted,
Olufemi Fo arin
Inte y Manager
SBS/sr
Attachments
. Nov 07 02 04: 15p Berna [847) 697-0286 p.2
pmw llw DATE: 11107!02
02114 BERNA ARCHITECTS AND DESIGN
Craig Bakstad
213 E.Chicago St
Bon Fad pr"-
213 E.CMc"D St.
REMODEL ESTIMATE
PROJECT COST ESTIMATE
DIV. DESCRIPTION QUAN I PRICEIUNIT I PRICE
DIVISION 2-SITEWORK
SITE ELECTRICAL
PARKING LOT LIGHTING 2 EA u 000.00 EA. 54,000.00
DOUBLE LUMEN,25OW,M.H.,30'H.
FRONT STREET LIGHTING 4 EA :500.00 EA $2,000.00
LOW INTENSITY,LOW LEVEL
DMSION 2A-SUBSTRUCTURE
BUILDING SUBSTRUCTURE
DISPOSAL OFFSITE DUMPSTERS 3 EA $600.00 EA $1,800.00
W GRAVEL FILL S.O.G. 75 S.Y. $420 S.Y_ $315.00
GRANULAR BACKFILL 11 C.Y. $26.00 C.Y. 5275.00
DIVISION 3-CONCRETE
CONCRETE
CONCRETE COLUMN FOOTINGS(ASSEMBLEC 6 EA. !1..00 EA $1,500.00
3'X3701'FOOTING
CONCRETE FOOTINGS AND FOUNDATION W 23 LF. 00 L.F. $2,300.00
ASSEMBLED COST
INTERIOR STRIP FOOTING 120 LF. .00 L.F_ 54,200.00
W CONCRETE SLAB-S.O.G. 720 S.F. .50 S.F. $3.240.00
rW 6X6 W WF REINFORCING
DIVISION 4-MASONRY
-BRO K TIUCK POINTG 900 S.F. $9.50 S_F. 58,550.00
4-MASONRY CLEANING 900 S.F. $6.50 S-F_ $5,850.00
'PRICE OF MATERIAL PLUS....
DIVISION S-METALS
STRUCTURAL STEEL
STEEL UNTELS OR W12 WI 12-PLATE;PR 18 LF. $30.00 L.F. 3540.00
RAILING ATBALCONIES d PLATFORMS 22 L.F. $75.00 L.F. $1,650.00
DIVISION 6-WOOD&PLASTIC
ROUGH CARPENTRY
TEMPORARY PROTECTION 1.000 ADD $1.00 $1,000.00
MISC.WOOD BLOCKING 3.000 ADD $1.00 $3,000.00
MM.WOOD STAIR,DECK,ROOF 6,000 ADDI $1.00 tADD 1 $6,000.00 :
DIVISION 7-THERMAL 6 MOISTURE PROTECTION
WATER PROOFMG
BASEMENT WALL WATERPROOFING 110 S.F. $2.50 S.F. $275.00
INSULATION
PERIMETER FOUND.WALL INSULATION 44 S.F. $1.30 S.F. $57.20
CAULK AND SEALANTS
INTERK)RCAULK IIAW ADD $1.00 ADD $1,000.00
EXTERIOR CAULK 1,000 ADD $1.00 ADD $1,000.00
ROOFING
BUILT UP ROOF SYSTEM 850 S.F. $10.00 S.F. 58,5Q0.00
MECK FASTENED 111 FLASHING&
ACCESSORIES
REPAIR CORNICE 1 EA $2,000.00 EA $2,000.00
ROOF EDGING(ASSEMBLED COS 50 L.F. 530.00 LF. 31,500.00
INCLUDES BLOCKING,ALUMINUM ROOF EDGE4-HIGH
Page 1
Nov 07 02 04: 15p Herna (847)697-0286 p.3
DIVISION 8-DOORS&YNNDOVYS
EXTERIOR DOORS ASUMBLED COSTS
DOORS,FRAME AND HARDWARE INSTALLED
-SINGLE 5 EA. $2,000.00 EA. $10,000.00
EXTEROR GLAZWG
WINDOWS AT EXTERIOR 125 S.F. $78.00 S.F_ $975000
STOREFRO AT EXTERIOR 175 S.F. ;75.00 .F. t3,123.00
PAWnM
GYP.BOARD WALLS 10 S.F. $0.80 S.F. $8.00
CEILING 135 S.F. $1.50 S.F. S20Q.50
DOORS AND FRAMES 5 EA. ;3500 EA. ;175.00
DWISION 10-SPECLALMES
MISG
WMRIOR SIGNAGE $1.500.00
DEMO. 60 M.H. $70.00 M_H. $4,20000
ELEC. 50 SF. $12.00 S.F. $600.00
SUBTOTAL $100,112.70
GENERAL COMMONS
CONTINGENCY 0.1 (10,011.27
TOTAL PROJECT COST $110,123.97
TOTAL $110,123.97
Page 2
REMOVER EXISTING WOOD
WINDOWS FRAMES IN
7\NEW ISTING MASONRY
ENING AND PROVIDE
WIND OWS (TYP.)
I i
I
TRANSOM FRAME li '
NAL OPERABLE ABOVE DOOR OF
FRAME (TYP.)
! 2131/2 213 HAIR SAL
--� --- --------
ALL WINDOWS FRAMES ARE REMOVE INFILL F
TO BE REPLACED (TYP.) REPLACE GLASS
ABOVE DOOR OF
f NORTH ELEVATION- CHICAGO ST.FRAME (TYP.)
ELG'td F4C.ApE'•R`F4��:�Ei.E�i7 F=C c,c=d. ew�ea MM BWU
213 E. CHICAGO STREET DZ (�j
:,TYOt �LGIh:� � Al
mfy0 M�rMM-�
REMOVE AND REPLACE
WINDO 'S IN EXISTING
MASO RY OPENING
El
�o
,t
i
RADE
F�ll,I
II 11
II I.
II II
II I.
11 11
-------------BIMNA
GIN.:a:..,CE!'.PF.n',;EMEN?Pft�4t yL.`%
213 E. CHICAGO STREET I�MCBRl1i �=
CITY OF ELGlh! A2 a&%, o
MN� MAF�rMM-�