Loading...
HomeMy WebLinkAbout03-35 Resolution No. 03-35 RESOLUTION ACCEPTING AND AUTHORIZING EXECUTION OF THE 2001 MOTOR FUEL TAX MUNICIPAL MAINTENANCE EXPENDITURE STATEMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that it hereby accepts and authorizes Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, to execute the 2001 Motor Fuel Tax Municipal Maintenance Expenditure Statement, a copy of which is attached hereto and made a part hereof by reference. s/ Ed Schock Ed Schock, Mayor Presented: February 12 , 2003 Adopted: February 12 , 2003 Vote : Yeas : 6 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 03/14/01 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds, for that work,during the period from 01/01/01 ,thru 12/31/01 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 407,515.62 $ 83,363.07 $ 242,734.42 $ 81,418.13 $ 407,515.62 Catch basin cleaning $ 227,689.85 $ 129,801.33 $ 97,888.52 $ 227,689.85 Storm sewer cleaning $ 56,427.29 $ 2,819.03 $ 53,608.26 $ 56,427.29 Street sweeping $ 423,835.15 $ 188,533.26 $ 235,301.89 $ 423,835.15 Traffic markings $ 46,474.24 $ 37,429.19 $ 9,045.05 $ 46,474.24 Pre-mix patching $ 299,825.11 $ 146,823.03 $ 95,461.79 $ 57,540.29 $ 299,825.11 Traffic signals $ 150,426.38 $ 28,883.94 $ 109,990.94 $ 11,551.50 $ 150,426.38 Curbs and gutters $ 30,932.28 $ 20,744.34 $ 10,187.94 $ 30,932.28 Street resurfacing $ 43,537.20 $ 23,104.76 $ 20,432.44 $ 43,537.20 Street Paving Projects $ 577,979.04 $ 577,979.04 $ 577,979.04 Traffic Marking Projects $ 132,726.18 $ 132,726.18 $ 132,726.18 Traffic Signal Project $ 19,619.13 $ 19,619.13 $ 19,619.13 Bridge Maintenance Project $ 67,484.02 $ 67,484.02 $ 67,484.02 Engineering Maintenance $ 115,135.90 $ 115,135.90 $ 115,135.90 Total Cost $ 2,599,607.39 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,484,471.49 Net Cost of Engineering: $ 115,135.90 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 3,025,000.00 $ 157,805.00 2. Net cost to date $ 2,484,471.49 $ 115,135.90 3. Unexpended balance $ 540,528.51 $ 42,669.10 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 540,528.51 $ 42,669.10 Remarks: Total of Line 5= $583,197.61 February 14 , 2003 Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev 4/02) Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 03/14/01 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds,for that work,during the period from 01/01/01 ,thru 12/31/01 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 407,515.62 $ 83,363.07 $ 242,734.42 $ 81,418.13 $ 407,515.62 Catch basin cleaning $ 227,689.85 $ 129,801.33 $ 97,888.52 $ 227,689.85 Storm sewer cleaning $ 56,427.29 $ 2,819.03 $ 53,608.26 $ 56,427.29 Street sweeping $ 423,835.15 $ 188,533.26 $ 235,301.89 $ 423,835.15 Traffic markings $ 46,474.24 $ 37,429.19 $ 9,045.05 $ 46,474.24 Pre-mix patching $ 299,825.11 $ 146,823.03 $ 95,461.79 $ 57,540.29 $ 299,825.11 Traffic signals $ 150,426.38 $ 28,883.94 $ 109,990.94 $ 11,551.50 $ 150,426.38 Curbs and gutters $ 30,932.28 $ 20,744.34 $ 10,187.94 $ 30,932.28 Street resurfacing $ 43,537.20 $ 23,104.76 $ 20,432.44 $ 43,537.20 Street Paving Projects $ 577,979.04 $ 577,979.04 $ 577,979.04 Traffic Marking Projects $ 132,726.18 $ 132,726.18 $ 132,726.18 Traffic Signal Project $ 19,619.13 $ 19,619.13 $ 19,619.13 Bridge Maintenance Project $ 67,484.02 $ 67,484.02 $ 67,484.02 Engineering Maintenance $ 115,135.90 $ 115,135.90 $ 115,135.90 Total Cost $ 2,599,607.39 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,484,471.49 Net Cost of Engineering: $ 115,135.90 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 3,025,000.00 $ 157,805.00 2. Net cost to date $ 2,484,471.49 $ 115,135.90 3. Unexpended balance $ 540,528.51 $ 42,669.10 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 540,528.51 $ 42,669.10 Remarks: Total of Line 5= $583,197.61 Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev.4/02) Resolution No. 03-34 RESOLUTION ACCEPTING AND AUTHORIZING EXECUTION OF THE 2000 MOTOR FUEL TAX MUNICIPAL MAINTENANCE EXPENDITURE STATEMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that it hereby accepts and authorizes Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, to execute the 2000 Motor Fuel Tax Municipal Maintenance Expenditure Statement, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: February 12 , 2003 Adopted: February 12 , 2003 Vote : Yeas : 6 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 02/29/00 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds,for that work, during the period from 01/01/00 ,thru 12/31/00 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 831,322.56 $ 325,440.69 $ 192,327.66 $ 313,554.21 $ 831,322.56 Catch basin cleaning $ 272,293.39 $ 168,682.05 $ 103,611.34 $ 272,293.39 Storm sewer cleaning $ 50,707.26 $ 2,350.03 $ 48,357.23 $ 50,707.26 Street sweeping $ 469,293.96 $ 203,057.61 $ 266,236.35 $ 469,293.96 Traffic markings $ 109,839.31 $ 90,834.45 $ 19,004.86 $ 109,839.31 Pre-mix patching $ 255,001.92 $ 119,035.14 $ 89,472.33 $ 46,494.45 $ 255,001.92 Traffic signals $ 86,345.23 $ 43,874.07 $ 26,800.85 $ 15,670.31 $ 86,345.23 Curbs and gutters $ 43,160.40 $ 28,907.89 $ 14,252.51 $ 43,160.40 Street resurfacing $ 813.02 $ 355.42 $ 457.60 $ 813.02 Crack filling $ 316.00 $ 316.00 $ 316.00 Street Paving Projects $ 489,961.82 $ 489,961.82 $ 489,961.82 Traffic Marking Projects $ 147,525.76 $ 147,525.76 $ 147,525.76 Traffic Signal Project $ 67,846.29 $ 67,846.29 $ 67,846.29 Bridge Maintenance Project $ 88,076.36 $ 88,076.36 $ 88,076.36 Engineering Maintenance $ 114,984.81 $ 114,984.81 $ 114,984.81 Total Cost $ 3,027,488.09 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,912,503.28 Net Cost of Engineering: $ 114,984.81 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,736,380.00 $ 101,180.00 2. Net cost to date $ 2,912,503.28 $ 114,984.81 3. Unexpended balance $ (176,123.28) $ (13,804.81) 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ (176,123.28) $ (13,804.81) Remarks: Total of Line 5= ($189,928.09) February 14, 2003 Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev.4/02) Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 02/29/00 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202, approved on ,and that the expenditure of motor fuel tax funds,for that work, during the period from 01/01/00 ,thru 12/31/00 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 831,322.56 $ 325,440.69 $ 192,327.66 $ 313,554.21 $ 831,322.56 Catch basin cleaning $ 272,293.39 $ 168,682.05 $ 103,611.34 $ 272,293.39 Storm sewer cleaning $ 50,707.26 $ 2,350.03 $ 48,357.23 $ 50,707.26 Street sweeping $ 469,293.96 $ 203,057.61 $ 266,236.35 $ 469,293.96 Traffic markings $ 109,839.31 $ 90,834.45 $ 19,004.86 $ 109,839.31 Pre-mix patching $ 255,001.92 $ 119,035.14 $ 89,472.33 $ 46,494.45 $ 255,001.92 Traffic signals $ 86,345.23 $ 43,874.07 $ 26,800.85 $ 15,670.31 $ 86,345.23 Curbs and gutters $ 43,160.40 $ 28,907.89 $ 14,252.51 $ 43,160.40 Street resurfacing $ 813.02 $ 355.42 $ 457.60 $ 813.02 Crack filling $ 316.00 $ 316.00 $ 316.00 Street Paving Projects $ 489,961.82 $ 489,961.82 $ 489,961.82 Traffic Marking Projects $ 147,525.76 $ 147,525.76 $ 147,525.76 Traffic Signal Project $ 67,846.29 $ 67,846.29 $ 67,846.29 Bridge Maintenance Project $ 88,076.36 $ 88,076.36 $ 88,076.36 Engineering Maintenance $ 114,984.81 $ 114,984.81 $ 114,984.81 Total Cost $ 3,027,488.09 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,912,503.28 Net Cost of Engineering: $ 114,984.81 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,736,380.00 $ 101,180.00 2. Net cost to date $ 2,912,503.28 $ 114,984.81 3. Unexpended balance $ (176,123.28) $ (13,804.81) 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ (176,123.28) $ (13,804.81) Remarks: Total of Line 5= ($189,928.09) Date Date City,Town or Vi ag lerk Signature District Engineer Signature BLR 8501(Rev.4/02) Resolution No. 03-33 RESOLUTION ACCEPTING AND AUTHORIZING EXECUTION OF THE 1998 MOTOR FUEL TAX MUNICIPAL MAINTENANCE EXPENDITURE STATEMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that it hereby accepts and authorizes Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, to execute the 1998 Motor Fuel Tax Municipal Maintenance Expenditure Statement, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: February 12 , 2003 Adopted: February 12 , 2003 Vote : Yeas : 6 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk . Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 2/25/98 , and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds,for that work, during the period from 01/01/98 ,thru 12/31/98 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 381,677.98 $ 108,660.11 $ 146,983.14 $ 126,034.73 $ 381,677.98 Catch basin cleaning $ 136,930.42 $ 68,737.39 $ 68,193.03 $ 136,930.42 Storm sewer cleaning $ 71,081.80 $ 17,298.09 $ 53,783.71 $ 71,081.80 Street sweeping $ 541,981.86 $ 205,835.54 $ 336,146.32 $ 541,981.86 Traffic markings $ 100,137.00 $ 82,634.22 $ 17,502.78 $ 100,137.00 Pre-mix patching $ 322,401.45 $ 165,584.86 $ 83,354.84 $ 73,461.75 $ 322,401.45 Traffic signals $ 104,414.43 $ 34,654.28 $ 44,650.45 $ 25,109.70 $ 104,414.43 Curbs and gutters $ 24,210.69 $ 16,217.42 $ 7,993.27 $ 24,210.69 Street resurfacing $ 60,778.65 $ 38,942.85 $ 21,835.80 $ 60,778.65 Street Paving Projects $ 113,445.64 $ 113,445.64 $ 113,445.64 Traffic Marking Projects $ 123,526.73 $ 123,526.73 $ 123,526.73 Engineering Maintenance $ 14,145.38 $ 14,145.38 $ 14,145.38 Total Cost $ 1,994,732.03 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 1,980,586.65 Net Cost of Engineering: $ 14,145.38 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,338,310.00 $ 20,000.00 2. Net cost to date $ 1,980,586.65 $ 14,145.38 3. Unexpended balance $ 357,723.35 $ 5,854.62 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 357,723.35 $ 5,854.62 Remarks: Total of Line 5=$363,577.97 FPhrilary 14 , 7(103 Date Date City,Town or Village lerk ignature District Engineer Signature BLR 8501(Rev.4/02) Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality I here by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 2/25/98 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds,for that work,during the period from 01/01/98 ,thru 12/31/98 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 381,677.98 $ 108,660.11 $ 146,983.14 $ 126,034.73 $ 381,677.98 Catch basin cleaning $ 136,930.42 $ 68,737.39 $ 68,193.03 $ 136,930.42 Storm sewer cleaning $ 71,081.80 $ 17,298.09 $ 53,783.71 $ 71,081.80 Street sweeping $ 541,981.86 $ 205,835.54 $ 336,146.32 $ 541,981.86 Traffic markings $ 100,137.00 $ 82,634.22 $ 17,502.78 $ 100,137.00 Pre-mix patching $ 322,401.45 $ 165,584.86 $ 83,354.84 $ 73,461.75 $ 322,401.45 Traffic signals $ 104,414.43 $ 34,654.28 $ 44,650.45 $ 25,109.70 $ 104,414.43 Curbs and gutters $ 24,210.69 $ 16,217.42 $ 7,993.27 $ 24,210.69 Street resurfacing $ 60,778.65 $ 38,942.85 $ 21,835.80 $ 60,778.65 Street Paving Projects $ 113,445.64 $ 113,445.64 $ 113,445.64 Traffic Marking Projects $ 123,526.73 $ 123,526.73 $ 123,526.73 Engineering Maintenance $ 14,145.38 $ 14,145.38 $ 14,145.38 Total Cost $ 1,994,732.03 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 1,980,586.65 Net Cost of Engineering: $ 14,145.38 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,338,310.00 $ 20,000.00 2. Net cost to date $ 1,980,586.65 $ 14,145.38 3. Unexpended balance $ 357,723.35 $ 5,854.62 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 357,723.35 $ 5,854.62 Remarks: Total of Line 5=$363,577.97 Date Date City,Town or Viliag Cle Signature District Engineer Signature BLR 8501(Rev.4/02) G`� O F F4 Ci rui • § City of Elgin Agenda Item No. 1 February 7, 2003 L 1 G kd. �� TO: Mayor and Members of the City Council I ,j N filth H FROM: Olufemi Folarin, Interim City Manager it I t �,`r; FINANCIALLY STABLE CITYGOVERNMENT EFFICIENT SERVICES, AND QUALITY INFRASTRUCTURE SUBJECT: Acceptance of Motor Fuel Tax Expenditure Statements 1998, 2000 and 2001 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider the acceptance of the Motor Fuel Tax (MFT) Municipal Maintenance Expenditure Statements from 1998, 2000, and 2001 . BACKGROUND A Municipal Estimate of Maintenance Costs is prepared at the beginning of each calendar year by the Department of Public Works and is adopted in resolution form by the City Council . This document is based on the anticipated MFT-eligible activities at the start of the year and is forwarded to the Illinois Department of Transportation (IDOT) for approval . At the end of the calendar year, a Municipal Maintenance Expenditure Statement is normally prepared and adopted by the City Council . This document is based on the actual costs of MFT-eligible activities performed during the corresponding year and is forwarded to IDOT for approval . IDOT routinely audits these statements for conformity with eligible activities . The attached Municipal Maintenance Expenditure Statements summarize the 1998, 2000, and 2001 MFT eligible costs for in- house activities and maintenance contracts. These statements also compare actual expenditures for maintenance activities with approved estimated expenditures. These statements will bring the City current with IDOT in the documentation of MFT Fund uses. The 1999 Statement was already submitted to IDOT. A statement for 2002 cannot be submitted at this time because two projects are not complete. Upon the approval of final payment for the 2002 Unimproved Street Maintenance Project, the statement for 2002 will be forwarded to you for approval and submission to IDOT. The Municipal Estimate of Maintenance Costs for 2003 is also before the City Council on this agenda. r Acceptance of MFT Expenditure Statements for 1998, 2000 and 2001 February 7, 2003 Page 2 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. V/ /'lJ1FINANCIAL IMPACT The purpose of these documents is to provide information to IDOT on the funds actually expended in each year of the program in their desired format . Adoption of the budget and the subsequent audit by IDOT of that year' s revenues and expenditures is the official action to approve the use of MFT Funds . The differences between actual expenditures and those approved estimates are shown below: YEAR BUDGET AMOUNT ACTUAL AMOUNT BALANCE 1998 $2, 338, 310 .00 $1, 994, 732 . 03 $363, 577 . 97 2000 $2, 736, 380 . 00 $3, 027, 488 . 09 ($189, 928 . 09) r2001 $3 , 025, 000 . 00 $2, 599, 607 . 39 $583, 197 . 61 The actual expenditures for 2000 exceeded the budget because of the heavy December, 2000 snow storms which drastically increased snow removal costs. \OKI MAL IMPACT None. ALTERNATIVES 1 . Approve as recommended. 2 . Not approve the expenditure statements. RECOMMENDATION It is recommended that the City Council approve the Motor Fuel Tax Fund Expenditure Statements for 1998, 2000, and 2001 and r Acceptance of MFT Expenditure Statements for 1998, 2000 and 2001 February 7, 2003 Page 3 authorize staff to execute the documents and submit them to IDOT. Respectfully submitted, , . Olufemi F• arin Interim ager CAB:cab Attachments Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality r, ..e by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 2/25/98 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202, approved on ,and that the expenditure of motor fuel tax funds,for that work,during the period from 01/01/98 ,thru 12/31/98 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 381,677.98 $ 108,660.11 $ 146,983.14 $ 126,034.73 $ 381,677.98 Catch basin cleaning $ 136,930.42 $ 68,737.39 $ 68,193.03 $ 136,930.42 Storm sewer cleaning $ 71,081.80 $ 17,298.09 $ 53,783.71 $ 71,081.80 Street sweeping $ 541,981.86 $ 205,835.54 $ 336,146.32 $ 541,981.86 Traffic markings $ 100,137.00 $ 82,634.22 $ 17,502.78 $ 100,137.00 Pre-mix patching $ 322,401.45 $ 165,584.86 $ 83,354.84 $ 73,461.75 $ 322,401.45 Traffic signals $ 104,414.43 $ 34,654.28 $ 44,650.45 $ 25,109.70 $ 104,414.43 Curbs and gutters $ 24,210.69 $ 16,217.42 $ 7,993.27 $ 24,210.69 Street resurfacing $ 60,778.65 $ 38,942.85 $ 21,835.80 $ 60,778.65 Street Paving Projects $ 113,445.64 $ 113,445.64 $ 113,445.64 Traffic Marking Projects $ 123,526.73 $ 123,526.73 $ 123,526.73 rill. Engineering Maintenance $ 14,145.38 $ 14,145.38 $ 14,145.38 Total Cost $ 1,994,732.03 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 1,980,586.65 Net Cost of Engineering: $ 14,145.38 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,338,310.00 $ 20,000.00 2. Net cost to date $ 1,980,586.65 $ 14,145.38 3. Unexpended balance $ 357,723.35 $ 5,854.62 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 357,723.35 $ 5,854.62 Remarks: Total of Line 5 =$363,577.97 Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev.4/02) . VIllinois Department Municipal Maintenance of Transportation Expenditure Statement r City of Elgin Municipality t 1,are by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 02/29/00 ,and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202, approved on ,and that the expenditure of motor fuel tax funds,for that work,during the period from 01/01/00 ,thru 12/31/00 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 831,322.56 $ 325,440.69 $ 192,327.66 $ 313,554.21 $ 831,322.56 Catch basin cleaning $ 272,293.39 $ 168,682.05 $ 103,611.34 $ 272,293.39 Storm sewer cleaning $ 50,707.26 $ 2,350.03 $ 48,357.23 $ 50,707.26 Street sweeping $ 469,293.96 $ 203,057.61 $ 266,236.35 $ 469,293.96 Traffic markings $ 109,839.31 $ 90,834.45 $ 19,004.86 $ 109,839.31 Pre-mix patching $ 255,001.92 $ 119,035.14 $ 89,472.33 $ 46,494.45 $ 255,001.92 Traffic signals $ 86,345.23 $ 43,874.07 $ 26,800.85 $ 15,670.31 $ 86,345.23 Curbs and gutters $ 43,160.40 $ 28,907.89 $ 14,252.51 $ 43,160.40 Street resurfacing $ 813.02 $ 355.42 $ 457.60 $ 813.02 Crack filling $ - 316.00 $ 316.00 $ 316.00 Street Paving Projects $ 489,961.82 $ 489,961.82 $ 489,961.82 Traffic Marking Projects $ 147,525.76 $ 147,525.76 $ 147,525.76 Traffic Signal Project $ 67,846.29 $ 67,846.29 $ 67,846.29 Bridge Maintenance Project $ 88,076.36 $ 88,076.36 $ 88,076.36 rill Engineering Maintenance $ 114,984.81 $ 114,984.81 $ 114,984.81 Total Cost $ 3,027,488.09 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,912,503.28 Net Cost of Engineering: $ 114,984.81 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 2,736,380.00 $ 101,180.00 2. Net cost to date $ 2,912,503.28 $ 114,984.81 3. Unexpended balance $ (176,123.28) $ (13,804.81) 4. Outstanding bills 5. Credit to unobligated balance (line 3 or line 3 minus line 4) $ (176,123.28) $ (13,804.81) Remarks: Total of Line 5= ($189,928.09) Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev.4/02) Illinois Department Municipal Maintenance of Transportation Expenditure Statement City of Elgin Municipality (1.7re by certify that the maintenacne operation shown below were completed in accordance with the items of work listed on the Municipal Estimate of Maintenance Costs, Form BLR 8202 approved on 03/14/01 , and revised or supplemental Municipal Estimate of Maintenance Costs, Form BLR 8202,approved on ,and that the expenditure of motor fuel tax funds,for that work,during the period from 01/01/01 ,thru 12/31/01 is as shown and that receipted bills are on file and available for audit. Maintenance Operation Costs • Maintenance Operation Completed Equipment (For Details See Approved Form BLR 8202) Quantity Labor Materials Rental Totals Snow and ice control $ 407,515.62 $ 83,363.07 $ 242,734.42 $ 81,418.13 $ 407,515.62 Catch basin cleaning $ 227,689.85 $ 129,801.33 $ 97,888.52 $ 227,689.85 Storm sewer cleaning $ 56,427.29 $ 2,819.03 $ 53,608.26 $ 56,427.29 Street sweeping $ 423,835.15 $ 188,533.26 $ 235,301.89 $ 423,835.15 Traffic markings $ 46,474.24 $ 37,429.19 $ 9,045.05 $ 46,474.24 Pre-mix patching $ 299,825.11 $ 146,823.03 $ 95,461.79 $ 57,540.29 $ 299,825.11 Traffic signals $ 150,426.38 $ 28,883.94 $ 109,990.94 $ 11,551.50 $ 150,426.38 Curbs and gutters $ 30,932.28 $ 20,744.34 $ 10,187.94 $ 30,932.28 Street resurfacing $ 43,537.20 $ 23,104.76 $ 20,432.44 $ 43,537.20 Street Paving Projects $ 577,979.04 $ 577,979.04 $ 577,979.04 Traffic Marking Projects $ 132,726.18 $ 132,726.18 $ 132,726.18 Traffic Signal Project $ 19,619.13 $ 19,619.13 $ 19,619.13 Bridge Maintenance Project $ 67,484.02 $ 67,484.02 $ 67,484.02 r Engineering Maintenance $ 115,135.90 $ 115,135.90 $ 115,135.90 Total Cost $ 2,599,607.39 Less Other Contributions and/or Refunds: Net Cost of Maintenance $ 2,484,471.49 Net Cost of Engineering: $ 115,135.90 Maintenance Engineering 1. Total Motor Fuel Tax fund authorized $ 3,025,000.00 $ 157,805.00 2. Net cost to date $ 2,484,471.49 $ 115,135.90 3. Unexpended balance $ 540,528.51 $ 42,669.10 4. Outstanding bills 5. Credit to unobligated balance(line 3 or line 3 minus line 4) $ 540,528.51 $ 42,669.10 Remarks: Total of Line 5=$583,197.61 rk Date Date City,Town or Village Clerk Signature District Engineer Signature BLR 8501(Rev.4/02) ra. C.O.W. MEMO APPROVAL/ROUTING SLIP Name: Acceptance of MFT Expenditure Statements For 1998, 2000 and 2001 Department: Public Works Date: 1/31/03 FAX #: 5983 Ext: 6001 Department Head Approval:) pproval: %„, /77 2.4 Reminders: • Date the memo for meeting at which i • Select the Strateg rb- on the front page Wide Shared" Driv Logos" folder. • Type the initials at the bottom of th G: \City Wide Shared\cowmemo\cowmemo. 02\COW Memo Approval Routing Slip.wpd