Loading...
HomeMy WebLinkAbout03-328 Resolution No. 03-328 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH DOOR SYSTEMS, INC. FOR THE PUBLII WORKS FACILITY WHEREAS, the City of Elgin has he etofore entered into a contract with Door Systems, Inc. for over ead doors at the public works facility; and WHEREAS, it is necessary and desirab e to modify the terms of the contract as is described in Change Order No . 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that David M. Dorgan, City Manager, be and is hereby authorized and directed to execut: Change Order No. 1 and Final, a copy of which is attached hereto .:nd made a part hereof by reference . s/ Ed Schock Ed Sc ock, Mayor Presented: December 3 , 2003 Adopted: December 3 , 2003 Omnibus Vote : Yeas : 6 Nays : 0 Recorded: December 4, 2003 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT 339570—NEW PUBLIC WORKS FACILI I Y CHANGE ORDER NO. 1 AND FINAL FOR BID ITE C-7 SCOPE: Change Order No. 1 and Final will add one work item to the lump sum contract with Door Systems, Inc for Bid Item C-7, "Overhead Doors" of he New Public Works Facility Project - Bid Package C. REASONS FOR CHANGE: This Change Order No. 1 an. Final is in the best interests of the City and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOU T: The amount the contract will be revised is as follows: ITEM TOTAL 1. Install 3"by 3" steel tubular frames, from floor to lentel, on seven $11,000.00 new garage door openings and cover frame and edge of precast panel with 10 gauge paint grip metal 17" wide. The original contract with Door Systems, Inc. is for $53,626.00. By reason of Change Order No. 1 and Final,the contract for Bid Item C-7, "Overhead Doors" of the New Public Works Facility Project -Bid Package C will be increased by the amount of eleven thousand and 00/100 dollars ($11,000.00). The new contract amount, inclusive of Change Order No. 1 and Final is sixty-four thousand six hundred twenty-six and 00/100 dollars ($64,626.00). OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this 5th day of November, 2003. Recommended: PUBLIC WORKS DEPARTMENT By: John M. Loete Title: Public Works Director Date: 11/6/0 j Accepted: ELGIN, ILLINOIS PROJECT 339570—NEW PUBLIC WORKS FACILI Y CHANGE ORDER NO. 1 AND FINAL FOR BID ITE C-7 Page 2 DOOR SYSTEMS,INC. Party of the Second Part (Contractor) By. / !/� /�7( '�+' J Title: Timothy W. oward Vice President Door Systems, Inc. Date: 11/6/03 Approved: CITY OF ELGIN Party of the First Part (Owner) By: / C7:2-e..,,,-2,174/ Title: //2160.4'41/G�._ Date: / G //2'/ 4- • <0OFk-4.Cj ! City of Elgin Agenda Item No. Or •• E ttt i November 14, 2003 P I I ImoP ` `` pmt i N k., I •L FINANCIALLY STABLE CITY WVERNMENT TO: Mayor and Members of the City Co.zncil EFFKIENT SERVKES, AND QUALITY INFRASTRUCTURE FROM: David M. Dorgan, City Manager,' John M. Loete, Public Works Director SUBJECT: Authorization of Change Order No. 1 and Final Payment for the Contract for Bid Item C-7, "Overhead Doors" for the New Public Works Facility PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorization of Change Order No. 1 and final payment for the subject contract with Door Systems, Inc. BACKGROUND The City Council awarded the contract for overhead garage doors (Bid Item C-7) on the building at the new Public Works facility to Door Systems, Inc. at the meeting on April 23, 2003 . The project consisted of the installation of new overhead garage doors in seven new locations and replacing four existing doors. Change Order No. 1 (attached) will add one item of work at a cost of $11, 000 . 00 and the adjusted value of the contract with Door Systems, Inc is $64, 626. 00. The added work for Door Systems was required because the technique used to saw the openings in the exterior building walls did not allow the framing to be done as planned. The cost of the change is partially offset by a credit $1, 725 . 00 under Bid Item C-5 by the carpentry firm originally assigned to frame the doors . COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None CO#1 For Bid Item C-7, New Public Works Facility November 14, 2003 Page 2 ()KFINANCIAL IMPACT The total cost of this change order is $1 , 000 . 00 . Funding for the Public Works Facility Project is oudgeted under project number 339570 in the following accounts: Fund Account Numbe Amount Riverboat Fund 275-0000-791 . 92 36 $ 4, 215, 010* Riverboat Lease Fund 276-0000-795 . 92 36 1, 985, 000 1996A Bond Sale (water) 376-4000-795. 92 36 809, 945 2000 Bond Sale 380-0000-795. 92 36 1, 000, 000 2000 Bond Sale (water) 380-4000-795 . 92 36 132, 945 2002 Bond Sale 382-0000-795 . 92 36 3, 800, 000 2002 Bond Sale (water) 382-4000-795. 92 36 200, 000 1992 Bond Sale 392-4000-795. 92 41 57, 110 Total $12, 200, 010 *Includes Precision Glass rental payme is of $411, 510 and a budget transfer of $88, 500 from the 2103 Street Resurfacing Program (number 39905A) . Of this amount, $221, 506. 13 remains unen, umbered in the project budget as of 11/11/03 . A summary of actions to be funded by this balance is below. Item Status Cost CO#1 Item D-2 11/19/03 Agenda $ 57, 592 . 00 CO#1 Item A-6 11/19/03 Agenda 18, 250. 00 CO#1 Item C-7 11/19/03 Agenda 11, 000. 00 Added Cost As Of 11/19/03 $ 86, 842 . 00 If approved, the action items on the age da tonight will leave a balance of $134, 664 . 13 to provide for oth-r contingencies . em. CO#1 For Bid Item C-7, New Public Works Facility November 14, 2003 Page 3 The final contract with Door Systems is as follows : * Original Contract Amount $53, 626. 00 * Change Order No. 1 ▪ $11, 000 . 00 * Final Contract $64, 626. 00 Payments made to date total $53, 616. 00 Leaving a final payment of • $11, 010 . 00 \Plell' GAL IMPACT None ALTERNATIVES 1 . Approve Change Order No. 1 and final pa ment as recommended. t 2 . Do not approve Change Order No. 1 and final payment. t RECOMMENDATION It is recommended that the City Council authorize execution of Change Order No. 1 for $11, 000 . 00 and authorize final payment to Door Systems in the amount of $11, 010 . 01 for the contract for Bid Item C-7, "Overhead Doors" for the ne Public Works Facility Respectfully submitted for Council consid:ration. jml Attachment r