HomeMy WebLinkAbout03-306 Resolution No . 03-306
RESOLUTION
AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT
WITH BARNEY CAVITT
(217-219 National Street)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that David M. Dorgan, City Manager, and Dolonna Mecum,
City Clerk, be and are hereby authorized and directed to execute a
facade improvement program agreement on behalf of the City of Elgin
with Barney Cavitt for the property commonly known as 217-
219 National Street, a copy of which is attached hereto and made a
part hereof by reference .
s/Ed Schock
Ed Schock, Mayor
Presented: November 5, 2003
Adopted: November 5, 2003
Vote : Yeas : 5 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
Memorandum
-, City of Elgin
October 31, 2003
TO: Mayor and Members of the City Council
FROM: David Dorgan, City Manager
Sarosh Saher, Urban Design & Preservation Specialist
SUBJECT: Facade Improvement Project for 217-219 National Street
Owned by Mr. Rodney Cavitt
Amendment to the project cost and City participation
At the last meeting of the Committee Of the Whole, a request to
fund Phase 1 of a Facade Improvement project was approved. The
estimated cost for Phase 1 as provided by the architect was
$71, 554 . 33 . The City' s recommended participation in the program
at 50o amounted to $35, 772 . 17 . Since only Phase 1 was able to be
funded due to the limited availability of program funds, the
City recommended that the property owner submit an amended
application for Phase 2 to be funded in FY2004 .
However, due to various other projects coming in under budget,
the City Manager' s office has indicated that there are
additional funds now available to fund the project in its
entirety. The total project costs requested by the property
owner at this time are $146, 626 . 70, with the City' s
participation at 50o amounting to $73, 313 . 35 . The attached
agreement and resolution reflect the amended project costs and
City participation.
Funds for the project will be made available from Account Number
275-0000-791 . 78-99, Project No. 079832, Riverboat Rehabilitation
Grant .
Respectfully submitted for your consideration.
Attachments
CITY OF ELGIN
FACADE IMPROVEMENT PROGRAM AGREEMENT
217-219 NATIONAL STREET
THIS AGREEMENT is made and entered into this day of
� '. 2003 , by and between the City of Elgin, Illinois, a
municipal corporation (hereinafter referred to as "City") , and Barney
Cavitt, the property owner, (hereinafter referred to as "Owner") .
WHEREAS, City has established a facade improvement program
(hereinafter referred to as "Program" ) for application within certain
areas of the corporate limits of City designated by City as appropriate
for such application (hereinafter referred to as "Rehabilitation Areas") ;
and
WHEREAS, Program is administered and funded solely by City for
purposes of the control and prevention of blight, dilapidation and
deterioration of Rehabilitation Areas; and
WHEREAS, pursuant to Program, City has undertaken to share the cost
of facade improvements to certain structures within Rehabilitation Area,
pursuant to the criteria set forth herein; and
WHEREAS, Owner owns at least 500 of subject commercial building(s) ,
or is the tenant of commercial building (s) located within Rehabilitation
Area, with owner having provided the owner' s consent and authority to
participate in Program pursuant to the terms and provisions of this
Agreement .
NOW, THEREFORE, in consideration of the mutual promises and
covenants contained herein, the sufficiency of which is hereby
acknowledged, the parties hereto hereby agree as follows:
Section 1 . The total approved project costs for the facade
improvements for the structure referred to at Section 16 herein shall be
$146, 626 . 70, as set forth in Attachment A attached hereto (such total
approved project costs for facade improvements are hereinafter referred
to as "Eligible Costs" and such structure is hereinafter referred to as
the "Structure") . The City shall pay the Owner a sum not to exceed
$73, 313 .35, being 50% of the total Eligible Costs, for facade ,
improvements to the structure approved pursuant to the provisions of this
Agreement. The project shall be confined to approved improvements made to
that part of the Structure visible from any public right-of-way. All
parties hereto agree that all payments from the City provided for herein
shall be made to Barney Cavitt, who shall provide the City with a full
release upon receipt .
Section 2 . Eligible costs shall include labor, material and
equipment costs, and such other costs as may be reasonably necessary for
the execution and completion of the facade improvement hereby provided
for (hereinafter referred to as the "Work") , as designated from the
1
design drawings and specifications approved by the Project Review Team
pursuant to the provisions of Section 3 herein and prepared by Consultant
(hereinafter referred to as "Plans" ) .
Section 3 . No Work shall be undertaken or shall be considered to
constitute the basis for an Eligible Cost until the design for such Work
has been submitted to and approved in writing by the Project Review Team,
consisting of the City' s Urban Design and Preservation Specialist and
City' s Principal Planner, and any other member designated on the Project
Review Team. Such design shall include, but not be limited to, a date
certain by which the Work shall be completed. In no event shall such
Work be completed more than one hundred eighty (180) days from the date
of this Agreement, without the written consent of the Project Review
Team.
Section 4 . The Project Review Team shall be permitted access to
Structure to periodically review the progress of the Work. Such review
shall not be in lieu of any other inspections which may otherwise be
required by law or by City. Any and all portions of the Work which do
not, in the sole discretion of the Project Review Team, conform to the
Plans or other applicable terms of this Agreement, shall be made to
conform to the Plans and other applicable Terms of this Agreement upon
written notice of the existence of such non-conforming portions.
Section 5 . Upon completion of the Work, and upon final inspection
and written approval by the Project Review Team and such other final
inspections and approvals as may be required by law, Owner shall submit
to City: (1) an executed, notarized itemized contractor statement
reflecting the total cost of the Work and each portion thereof,
including, but not limited to, the cost of labor (whether provided by any
contractor or subcontractor) , materials and equipment; (2) copies of all
bids, contracts and invoices submitted, executed or incurred pursuant to
the Work; and (3) reasonable proof of payment of all costs incurred
pursuant to the Work.
Section 6 . City shall pay to Owner the sum provided for at Section
1 herein within thirty (30) days of owner' s compliance with the
provisions of Section 5 herein. In no event shall the amount paid to
Owner exceed the amount specified in this Agreement or in the contractor
statement .
Section 7 . In the event Owner fails to complete the Work in
accordance with the terms of this Agreement, or otherwise breaches the
terms of this Agreement, City may terminate this Agreement upon written
notice of breach and termination to Owner, and any and all financial or
other obligations on the part of City shall cease and become null and
void. Additionally, Owner shall refund to City, all money paid to Owner
by City pursuant to this agreement upon thirty (30) days written demand.
This provision shall not constitute a restriction on City to pursue any
and all other rights to which it may be entitled by law.
Section 8 . Upon completion of the Work, and for a period of five
(5) years thereafter, Owner shall properly maintain the Work in its
2
finished form, without alteration or change thereto, and shall not enter
into any agreement, or take any other steps to alter, change or remove
such Work, or to create or undertake any other Work which may constitute
a deviation from the Plans, without prior written approval from the
Project Review Team in its sole discretion.
Section 9. Nothing herein is intended to limit, restrict or
prohibit the Owner from undertaking any other Work in or about the
subject premises which is unrelated to the facade improvement provided
for in this Agreement .
Section 10 . This Agreement shall be binding upon City and its
successors, and upon Owner, Owner' s successors and assigns for a period
of five (5) years from and after the date of completion and approval of
the Work. Owner shall provide subsequent Owner (s) of Structure with a
copy of this Agreement . This Agreement shall run with the land
underlying Structure. Notwithstanding the aforementioned five (5) year
period, the provisions of Sections 7 and 12 herein shall survive the
termination of this agreement .
Section 11. If Owner does not own the underlying property for which
Work is being done, Owner warrants and represents to City that Owner has
a lease at the location for which the Work is proposed for a term of at
least six (6) years. Owner further warrants and represents that he has
received authorization from all owners of the property for which Work is
to be done to accept funds under this program and to undertake the Work.
Further, such owner(s) of the property for which Work is to be done
hereby acknowledges that he is aware of this Agreement and authorized the
Work which is to be made to the Structure. Said owner(s) of the property
for which improvements are to be made further acknowledge that, as owner
of the property, he is a party to this Agreement and is bound by the
provisions of this Agreement specifically, but not limited to, the
provisions of Section 6 of this Agreement. Each "Owner" signature hereto
hereby warrants and represents that there are no other entities having an
ownership interest in the Structure, which have not executed this
Agreement .
Section 12 . Owner hereby holds harmless and indemnifies City from
and against any and all causes of action, suits, claims for damages, and
any and all other liability, which may arise out of or in connection with
Owner' s or Owner' s agents, employees and assigns' negligent performance
of any of the terms of this Agreement . In the event the indemnification
provisions of this Agreement are invoked so as to require legal defense
of City, counsel for such defense shall be of City' s choosing.
Section 13 . This Agreement shall not be construed to create a
partnership, joint venture or employment relationship between the parties
hereto.
Section 14. This Agreement shall be subject to and governed by the
laws of the State of Illinois. The parties hereto hereby agree that
venue for any and all actions which may be brought by each and either of
them to enforce the provisions of this Agreement shall be in the Circuit
3
Court of Kane County, Illinois .
Section 15 . The terms of this Agreement shall be severable.
In the
event that any of the terms or provisions of this Agreement are deemed to
be void or otherwise unenforceable for any reason, the rema_nder of this
Agreement shall remain in full force and effect .
Section 16 .
Owner' s Name : Barney Cavitt
Address : 114 S . Eastern Avenue
City: Bartlett, IL 60103
Telephone Number : (847) 742-9555
Property Location : 217-219 National Street
Ownership Interest : property owner
Contact Person: Rodney Cavitt, 23 Douglas Avenue, Elgin, IL 60120
IN WITNESS WHEREOF, the parties hereto have executed this Agreement
on the date first appearing above .
As to CITY OF ELGIN As to OWNER:
Byz%'
�Davi�djDor BY an 3arney Cavitt
City Manager Property Owner
ATTEST:
Dolonna Mecum, City Clerk
c
• 1
PROJ No. DATE: 09116/03
03109 BERNA ARCHITECTS AND DESIGN
RODNEY CAVITT
217-219 National Street
Elgin Facade program
217 NATIONAL ST.
REMODEL ESTIMATE
PROJECT COST ESTIMATE
pr
DIVISION 2-SITEWORK
SITE ELECTRICAL
PARKING LOT LIGHTING 2 EA. $2,000.00 EA. $4,000.00
DOUBLE LUMEN,250W,M.H.,30'H.
FRONT STREET LIGHTING 3 EA. $500.00 EA. $1,500.00
LOW INTENSITY,LOW LEVEL
DIVISION 2A-SUBSTRUCTURE
BUILDING SUBSTRUCTURE
DISPOSAL OFFSITE DUMPSTERS 7 EA. $600.00 EA. $4,200.00
6"GRAVEL FILL S.O.G. 70 S.Y. $4.20 S.Y. $294.00
GRANULAR BACKFILL 11 C.Y. $25.00 C.Y. $275.00
DIVISION 3-CONCRETE
CONCRETE
CONCRETE FOOTINGS AND FOUNDATION W 85 L.F. $120.00 L.F. $10,200.00
ASSEMBLED COST
EXTERIOR STRIP FOOTING 80 L.F. $35.00 L.F. $2,800.00
5"CONCRETE SLAB-S.O.G. 400 S.F. $5.50 S:F. $2,200.00
w/6X6 WWF REINFORCING
DIVISION 4-MASONRY
4"BRICK TIUCK POINT'G 400 S.F. $9.50 S.F. $3,800.00
4"MASONRY CLEANING 900 S.F. $6.50 S.F. $5,850.00
DIVISION 5-METALS
STRUCTURAL STEEL
STEEL LINTELS W8 OR WW w/12"PLATE,PF 36 L.F. $60.00 L.F. $2,160.00
RAILING AT FRONT DOOR 40 L.F. $135.00 L.F. $5,400.00
DIVISION 6-WOOD&PLASTIC
ROUGH CARPENTRY
TEMPORARY PROTECTION 1,000 ADD $1.00 ADD $1,000.00
MISC.WOOD BLOCKING&CAPITALS 2,000 ADD $1.00 ADD $2,000.00
MISC.WOOD STAIR,DECK, 15,000 ADD $1.00 ADD $15,000.00
DIVISION 7-THERMAL&MOISTURE PROTECTION
WATER PROOFING
INSULATION
CAULK AND SEALANTS
INTERIOR CAULK 1,000 ADD $1.00 ADD $1,000.00
EXTERIOR CAULK 1,000 ADD $1.00 ADD $1,000.00
ROOFING
SHINGLE ROOF SYSTEM 125 S.F. $5.00 S.F. $625.00
BAYS&CUPOLA
SHINGLE ROOF SYSTEM 344 S.F. $5.00 S.F. $1,720.00
REPAIR CUPOLA 50 S.F. 25 SF $1,250.00
REPAIR CORNICE 1 EA. $1,500.00 EA. $1,500.00
ROOF EDGING ASSEMBLED COST 50 L.F. $30.00 L.F. $1,500.00
BAY AND CUPOLA&ALUMINUM ROOF EDGE4"HIGH
Page 1
Y 1
DIVISION 8-DOORS&WINDOWS
EXTERIOR DOORS ASSEMBLED COSTS
DOORS,FRAME AND HARDWARE INSTALLED
6 EA. $1,500.00 EA. $9,000.00
SINGLE
EXTERIOR GLAZING
WINDOWS AT EXTERIOR 220 S.F. $78.00 S.F. $17,160.00
STOREFRONT AT EXTERIOR 360 S.F. $70.00 S.F. $25,200.00
PAINTING
GYP.BOARD WALLS 10 S.F. $0.80 S.F. $8.00
CEILING 120 S.F. $1.50 S.F. $180.00
DOORS AND FRAMES 5 EA. $35.00 EA. $175.00
PAINT&REPAIR TOP WIND VANE 1 EA. 200 1 EA. $200.00
DIVISION 10-SPECIALITIES
MISC.
EXTERIOR SIGNAGE $1,000.00
DEMO. 150 M.H. $70.00 M.H. $10,500.00
ELEC. 50 S.F $12.00 S.F. $600.00
GENERAL CONDITIONS
CONTINGENCY 0.1 $13,329.70
}
o,
Page 2