HomeMy WebLinkAbout02-340 Resolution No. 02-340
RESOLUTION
AUTHORIZING EXECUTION OF AMENDMENT NO. 3 TO AN
ENGINEERING SERVICES AGREEMENT WITH
CIVIL DESIGN GROUP, INC. FOR THE
2001 SEWER REHABILITATION PROJECT-ALLEN DRIVE/BRUCE DRIVE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna
Mecum, City Clerk, be and are hereby authorized and directed to
execute Amendment No. 3 to an Engineering Services Agreement on
behalf of the City of Elgin with Civil Design Group, Inc . for the
2001 Sewer Rehabilitation Project-Allen Drive/Bruce Drive
Drainage Improvements, a copy of which is attached hereto and
made a part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: October 23 , 2002
Adopted: October 23 , 2002
Omnibus Vote : Yeas : 7 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
•
CConsulting EngineerFAX www.civildesigngroupinc.com
CITY OF ELGIN, ILLINOIS
2001 SEWER REHABILITATION
ENGINEERING SERVICES AGREEMENT
AMENDMENT NO. 3
THIS AGREEMENT AMENDMENT NO. 3, made and entered into this day
of ,2002, by and between the CITY OF ELGIN, an Illinois municipal
corporation (hereinafter referred to as "CITY") and CIVIL DESIGN GROUP, INC.
(hereinafter referred to as "ENGINEER"), shall modify that Agreement dated March 20,
2001,Amendment No.1 dated August 10, 2001 and Amendment No.2 dated July 22, 2001,
whereby the ENGINEER was engaged to perform professional services in connection with
the preparation of final design plans, specifications and quantities as needed for contract
bid and construction of the 2001 Sewer Rehabilitation (hereinafter referred to as the
PROJECT).
WHEREAS, the services did not include professional design services for drainage
improvements in the Highview Hills Subdivision as part of the PROJECT,
AND
WHEREAS, the CITY desires the ENGINEER to provide design services for this
part of the PROJECT,
AND
WHEREAS, the CITY desires to include the payments to the ENGINEER under the
AGREEMENT in connection with the professional services with the PROJECT.
In response to these additional services, certain revisions and additions must be
made to the AGREEMENT. In compliance, therefore, the terms and conditions of the
AGREEMENT are modified as specifically set out below. All other parts of the
AGREEMENT remain unchanged.
SECTION I of the AGREEMENT is hereby amended to include PARAGRAPHS H. and I.:
H. An outline of the design services to be provided by the ENGINEER includes
development of preliminary design concepts to be selected for
implementation by the CITY; preparation of final design plans,specifications
and quantities as needed for contractor bid and construction for the
Highview Hills Drainage Improvements.
I. A detailed Scope of Design Services is attached hereto as attachment A-4.
1754 North Washington Street Suite 120 Naperville, Illinois 60563-1334
SECTION IV, PARAGRAPH A. of the AGREEMENT is hereby deleted and replaced
with the following:
A. For services provided, the Engineer shall be reimbursed at hourly rates as
given in Attachment B-2 for the personnel employed on this PROJECT,with
the total fee not to exceed $144,000 regardless of the actual costs incurred
by the ENGINEER unless substantial modifications to the scope of the work
and authorized in writing by the DIRECTOR.
SECTION IV, PARAGRAPH C. of the AGREEMENT is hereby deleted and replaced with
the following:
C. Reimbursable expenses will include mileage for vehicles used,printing costs
for plans and specifications as needed for review by the CITY, permit
applications, and review by utility companies. Additionally included are one
set of reproducible plans and specifications for use by the CITY in making
sets for the bid and construction phases of the PROJECT. The total for
these expenses is given in E, F, G and H. Fees required by other agencies
for permit application will be paid directly by the CITY.
SECTION IV of the AGREEMENT is hereby amended to include PARAGRAPH H:
H. The schedule of Fees and Expenses for the design services to be
performed by the ENGINEER as described in Paragraphs I.H. and I.I. is
attached hereto as Attachment C-4. Any such fees are included in the
above-referenced figure of$144,000.00.
IN WITNESS Whereof, the undersigned have placed their hands and seals
upon and executed this Agreement in triplicate as though watch copy hereof was an
original and that there are no other oral agreements that have not been reduced to
writing in this statement.
For the City:
ATTEST: THE CITY OF ELGIN
By A► / 7 •_ By �� �\
City Clerk City Man!-
(SEAL)
For the ENGINEER:
Dated this day of A-r-ikti OFFICIAL SEAL
p +,Q AD.,2002 PATRICIA M POIRIER
�,, NOTARY PUBLIC,STATE OF ILLINOIS
ATTEST: � t•� 11G-14A-e"'t, MY COMMISSION EX S:OS/02/03
4.1!" —�� //l 'nevi 5climiz1h54/ Vice Preside
(SEAL)
ATTACHMENT A-4
CITY OF ELGIN 2001 SEWER REHABILITATION
HIGHVIEW HILLS DRAINAGE IMPROVEMENTS
DETAILED SCOPE OF DESIGN SERVICES
1. Make or cause to be made such drainage studies as may be required to furnish
sufficient data for the design of the proposed improvement.
2. Prepare detailed plans which will include the following as required:
- Cover Sheet
- Index of sheets
- Existing and proposed typical sections
- General Notes
- Summary of Quantities
- Existing topography within right of way as necessary to cover improvements.
- Proposed Geometrics
- Proposed drainage
- Existing easements and right of way
- Proposed easement and right of way
- Construction Staging
- Existing and Proposed cross sections
- Standards and Special Details
3. Make complete specifications special provisions, proposals and Estimate of Cost.
4. Attend progress meetings at any reasonable time when required to do so by
representatives of the city.
5. Attend the bid opening and prepare bid tabulations and award recommendation.
•
I
ATTACHMENT B-3
CITY OF ELGIN - 2001 SEWER REHABILITATION
HIGHVIEW HILLS DRAINAGE IMPROVEMENTS
HOURLY RATES AND REIMBURSABLE COSTS - 2002
Hourly
Salary Classification Des. $ Rate
Principal in Responsible Charge P1 130.00
Senior Project Manager E5 110.00
Project Manager E4 90.00
Project Engineer E3 80.00
Civil Engineer E2 75.00
Landscape Architect L1 90.00
Senior Engineering Technician T5 75.00
Engineering Technician T4 70.00
Technician T3 65.00
Junior Technician or Field Crew Chief T2 59.00
Field Crew Technician T1 52.00
Administrative Assistant Al 45.00
Field Survey Crew (2 Person) 111.00
Reimbursable Costs
Use of GPS Survey Equipment $50.00 / Hour (if in Agreement)
Printing & Reproduction Actual Cost x 1.1
Automobile Transportation 0.345 per mile x 1.1
Other Transportation Costs Actual Cost x 1.1
Package Delivery Services Actual Cost x 1.1
Outside Sub-consultant Services Actual Cost
Other Project-Specific Reimbursable Costs Actual Cost x 1.1
Notes on Billing Rates & Reimbursable Costs
1. Salary rates include general office and payroll overhead.
2. Computer systems are utilized for all design, drafting, and project administration
tasks. The rates quoted above include provision for the use of these systems.
There are no extra fees for computer usage.
3. Reimbursable costs will be itemized in billing statements.
4. Other consultant services (if required) will only be used with prior authorization and
will be specifically itemized in the Consulting Agreement.
5. Hourly Billing Rates normally change on January 1st of each year.
I
ATTACHMENT C-4
CITY OF ELGIN 2001 SEWER REHABILITATION
HIGHVIEW HILLS DRAINAGE IMPROVEMENTS
SCHEDULE OF FEES AND REIMBURSABLE COSTS
Description of Work Fees
Drainage Study/ Preliminary Design Services 2,208.00
Final Design Services 24,284.00
Bid Opening /Tabulations 1,104.00
Total Professional Services $27,596.00
Reimbursable Costs
Printing & Reproduction 318.00
Automobile Transportation 86.00
Total Reimbursable Costs $404.00
Total Fees (Professional Services plus Reimbursables) $28,000.00
r✓ ti
Agenda Item No.
City of Elgin
E
L ' , 011
G ot 1$P
October 4, 2002 101
pi 011
N F"'
FINANCIALLY STABLE CITYGOVERNMENT
TO: Mayor and Members of the City Council EF FIC TENT SE MIC ES,
AND OUAUTY INFRASTRUCTURE
FROM: Olufemi Folarin, Interim City Manager
SUBJECT: Amendment No. 3 to an Agreement with Civil Design
Group, Inc . for the 2001 Sewer Rehabilitation Project
for Construction Related Inspection Services for the
Allen Drive/Bruce Drive Drainage Improvements
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information to consider an
exception to the procurement ordinance and approval of Amendment
No. 3 to the engineering services agreement with Civil Design
Group, Inc . (CDG) for design services related to drainage
improvements in the Allen Drive/Bruce Drive neighborhood.
BACKGROUND
The agreement with CDG ($75, 000) for the preparation of final
plans, specifications, cost estimates and bidding assistance for
the 2001 Sewer Rehabilitation Projects was authorized by the
City Council on February 28, 2001 . The project included a
combination of both sanitary sewer and storm sewer
repairs/extensions that required conventional construction
techniques to implement . It was a counterpart to the
"trenchless" sewer lining contract and was funded by both the
2001 Neighborhood Storm Sewer Program and the 2001 Neighborhood
Sewer Repair Program.
Amendment No. 1 ($13 , 000) for construction engineering services
for the 2001 Sewer Rehabilitation Projects was authorized by
City Council on August 25, 2001 . Amendment No. 2 ($28, 000) for
construction engineering services for the Country Knoll Relief
Sewer Project was authorized by City Council on June 26, 2002 .
r
• .
telk Allen Dr. /Bruce Dr Drainage Improvements
October 4 , 2002
Page 2
The drainage improvements on Allen Drive and Bruce Drive were
chosen as the project to be completed under the 2002
Neighborhood Storm Sewer Program. The City received numerous
complaints from residents in the neighborhood about storm water
and ground water drainage problems . The problems include
standing water in the ditches, which makes them very difficult
to mow and properly maintain, and very shallow or non-existent
ditches, which causes the drainage to run onto the street
pavement and create icing problems in the winter.
Due to the similarity of the work and the lateness of the
season, it is recommended that CDG' s agreement be amended to
include this work rather than do a consultant selection process
for the project . The approval of the amendment will require an
exception to the procurement ordinance .
Amendment No. 3 ($28, 000) will add design engineering,
preparation of final plans, specifications and cost estimates
and bidding assistance for the project which will regrade and
sod all the drainage ditches after installing an under drain
system and re-establishing the culvert pipes under the driveway
entrances . The under drain will keep the ditches dry and
mowable, even in the areas of high groundwater. A copy of
Amendment No. 3 is attached as Exhibit A. A project location
map is attached as Exhibit B.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None .
FINANCIAL IMPACT
Amendment No. 3 totals $28 , 000 and covers design related
engineering services for the Allen Drive/Bruce Drive Drainage
Improvement Project . Funding is available in the amount of
$250, 400, account no. 276-0000-791 . 93-80, project no. 339657,
2002 Neighborhood Storm Sewer Rehabilitation.
The revised not-to-exceed agreement amount with CDG will now
total $144 , 000 .
ems Allen Dr. /Bruce Dr Drainage Improvements
October 4, 2002
Page 3
TOOL/
LEGAL IMPACT
Approval of the agreement will constitute an exception to the
procurement ordinance.
ALTERNATIVES
1 . Authorize Amendment No. 3 with CDG.
2 . Do not authorize Amendment No. 3 with CDG.
RECOMMENDATION
It is recommended that the City Council authorize Amendment No.
3 with Civil Design Group, Inc . in the amount of $28, 000 and
authorize staff to execute the necessary documents .
Respectfully submitted,
Olufemi F.'1 rin '
Inter' ' y anager
SP:do
Attachments
r
Vain
Resolution No. 02-340
RESOLUTION
AUTHORIZING EXECUTION OF AMENDMENT NO. 3 TO AN
ENGINEERING SERVICES AGREEMENT WITH
CIVIL DESIGN GROUP, INC . FOR THE
2001 SEWER REHABILITATION PROJECT-ALLEN DRIVE/BRUCE DRIVE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna
Mecum, City Clerk, he and are hereby authorized and directed to
execute Amendment No . 3 to an Engineering Services Agreement on
behalf of the City of Elgin with Civil Design Group, Inc . for the
2001 Sewer Rehabilitation Project-Allen Drive/Bruce Drive
Drainage Improvements, a copy of which is attached hereto and
made a part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: October 23 , 2002
Adopted: October 23 , 2002
Omnibus Vote: Yeas : 7 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk