RESOLUTION
AUTHORIZING EXECUTION OF A HIGHWAY AUTHORITY AGREEMENT WITH
BP PRODUCTS NORTH AMERICA, INC.
(1520 Big Timber Road)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Ed Schack, Mayor, and Dolonna Mecum, City Clerk,
be and are hereby authorized and directed to execute a Highway
Authority Agreement on behalf of the City of Elgin with BP
Products North America, Inc . to limit access to potentially
contaminated soil or groundwater in the public right-of-way
adjacent to 1520 Big Timber Road, a copy of which is attached
hereto and made a part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: September 11, 2002
Adopted: September 11, 2002
Omnibus Vote : Yeas : 6 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
CITY OF ELGIN-B P PRODUCTS NORTH AMERICA, INC.
UST OWNER/OPERATOR
HIGHWAY AUTHORITY AGREEMENT
INITIAL INFORMATION FORM
OVERVIEWS
The purpose of this document is to notify the City of Elgin, an
Illinois municipal corporation, of the extent of hydrocarbon im-
pact within soil and/or groundwater and to provide the necessary
initial information needed to enter into a highway authority
agreement, pursuant to 35 IAC 742 . 1020 .
APPLICANT INFORMATION
Property Owner/Operator: B P Products North America Inc . , a
Maryland corporation
Address : 28100 Torch Parkway, Suite 300 , Warrenville, IL 60555
Telephone No: 630-836-5674 (David Piotrowski)
Fax No: 630-836-6381
Name and Title of Person Authorized to Sign for Owner:
David Piotrowski, Environmental Business Manager
Name and Title of Person Authorized to Sign for Operator (if
different) :
Same
APPLICANT' S ATTORNEY ENVIRONMENTAL CONSULTANT
Jung & Associates, P.C. Delta Environmental Consultants,
Daniel S . Wiemerslage Inc . - Brad Littrell
33 N. Dearborn, Suite 1515 1717 Park Street
Chicago, IL 60602 Naperville, IL 60563-8471
Telephone No: 312-252-0104 Telephone No : 630-717-4024
PROPERTY ADJACENT TO THE RIGHT-OF-WAY
Address : 1520 Big Timber Road, Elgin, Illinois
RIGHT-OF-WAY (S) REQUIRING HIGHWAY AGREEMENT
Highway Number (s) : (Check one or both)
USoil Impact in Right-of-Way
Groundwater Impact in Right-of-Way
Street Name (if any) : Big Timber Road
REGULATORY INFORMATION
IEMA Incident Number: 903209
IEPA Project Manager: Matt Urish
IEPA Status : (Check one)
Conditional Approval
Approval Pending
Other
SAMPLING IN THE RIGHT-OF-WAY
(Check one)
® Right-of-Way Sampled Right-of-Way Impractical to
Sample
(Sampling was done adjacent
to right-of-way. )
PERSON(S) TO BE NOTIFIED IN AGREEMENT
Name : BP Products North America, Inc .
c/o David Piotrowski, Environmental Business Manager
28100 Torch Parkway, Suite 300
Warrenville, IL 60555
2
NATURE AND EXTENT OF HYDROCARBON IMPACT INFORMATION-
FOR EXHIBIT A
The Closure Report/Closure Response Letter will document the na-
ture and extent of hydrocarbon impact in the right-of-way.
Soil : Refer to Figure 1 - Estimated Soil Impact in the
Right-of-Way Map Using Tier One Residential Cor-
rective Action Objectives
Groundwater: Refer to Figure 2 - Estimated Groundwater Impact
in the Right-of-Way Map Using Tier One Corrective
Action Objectives
Tables showing soil and groundwater sampling results in the
right-of-way (if sampled) and/or adjacent to it need to be sub-
mitted and keyed to Figures 1 and 2 . Samples above Tier 1 One
Residential Corrective Action Objectives need to be highlighted.
AREA COVERED BY HIGHWAY AUTHORITY AGREEMENT - FOR EXHIBIT B
(Check one)
® Refer to Figure 3 - Proposed Highway Authority Agreement Loca-
tion Map
O Location not proposed (The Department will draw map based on
Figures 1 and 2 . )
Attachments :
® Figure 1 Estimated Soil Impact Map
® Figure 2 Estimated Groundwater Impact Map
® Figure 3 Proposed Highway Agreement Location Map
® Tables Showing Sampling Results
® Closure Report
0 Other
3
MASTER AGREEMENT
TIERED APPROACH TO CORRECTIVE-ACTION OBJECTIVES AGREEMENT
This Agreement is entered into this day of August, 2002 ,
pursuant to 35 Illinois Administrative Code Section 742 . 1020 by
and between BP Products North America, Inc . , a Maryland corpora-
tion ("Owner/Operator" ) , referred to herein as "Owner/Operator, "
and the City of Elgin, an Illinois municipal corporation
("City" ) , as follows :
1 . This Agreement shall not be binding upon the City until it is
executed by the undersigned representative of the City and prior
to execution this Agreement constitutes an offer by
Owner/Operator. The duly authorized representatives of
Owner/Operator have signed this Agreement and this Agreement is
binding upon them, their successors and assigns .
2 . a. Owner/Operator is pursuing a corrective action of a Site
and of the right-of-way adjacent to the boundary of the Site lo-
cated at1520 Big Timber Road, Elgin, Illinois (the "Site" ) .
2 .b. Attached as Exhibit A are site maps prepared by
Owner/Operator which show the area of estimated contaminant im-
pacted soil and/or groundwater at the time of this Agreement in
the right-of-way above Tier 1 residential levels under 35 Illi-
nois Administrative Code Part 742 . Also shown in Exhibit A are
tables prepared by Owner/Operator showing the concentration of
contaminants of concern, hereafter "Contaminants, " in soil
and/or groundwater within the Site and which shows the applica-
ble Tier 1 soil remediation objectives for residential property
and Tier 1 objectives for groundwater of the Illinois Pollution
Control Board ( `IPCB" ) which are exceeded along the boundary of
the Site adjacent to the Right of-Way. The right-of-way, and
only the right-of-way, as described in Exhibit B, hereinafter
the "Right-of-Way, " adjacent to the site is subject to this
Agreement . As the drawings in the Exhibits are not surveyed
plats, the boundary of the Right-of-Way in the Exhibits may be
an approximation of the actual right-of-way lines . The Right-of-
Way is impractical to sample for Contaminants ; however, the par-
ties believe that the area of the Right-of-Way is adequate to
encompass soil and/or groundwater within the Right-of-Way possi-
bly impacted with Contaminants from a release at the Site .
2 . c . The Illinois Emergency Management Agency has assigned inci-
dent number 903209 to this release at the Site .
4
2 . d. Owner/Operator intends to request risk-based, site specific
soil and/or groundwater remediation objectives from the Illinois
Environmental Protection Agency ( "IEPA" ) under 35 Illinois Ad-
ministrative Code Part 742 .
2 .e . Under these rules, use of risk-based, site specific reme-
diation objectives in the Right-of-Way may require the use of a
Highway Authority Agreement as defined in 35 Illinois Adminis-
trative Code Section 742 . 1020 .
3 . The City holds a fee simple interest or a dedication for
highway purposes in the Right-of-Way, or the Right-of-Way is a
platted street, and has jurisdiction of the Right-of-Way. For
purposes of this Agreement, "jurisdiction" means that the City
exercises access control over the use of groundwater beneath the
Right-of-Way and over access to the soil beneath the Right-of-
Way because it requires a permit for that access .
4 . a. Under 35 Illinois Administrative Code Section 742 . 1020 ,
this Agreement is intended to be an acceptable "Highway Author-
ity Agreement" to IEPA, as the City is willing to agree that it
will not allow the use of groundwater under the highway Right-
of-Way as a potable or other domestic supply of water and that
it will limit access as described herein to soil under the high-
way Right-of-Way that is contaminated from the release at levels
above residential Tier 1 remediation objectives .
4 .b. The IEPA must review and approve this Agreement, and this
Agreement shall be referenced in the IEPA' s "No Further Remedia-
tion" determination in the chain of title for the Site in the
county where the Site is located.
4 .c . This Agreement shall be null and void as a Highway Author-
ity Agreement should the IEPA not approve it or should it not be
referenced in the "No Further Remediation" determination. This
Agreement shall not be effective between the Owner/Operator and
the City unless and until the IEPA approves this Agreement and
the IEPA accordingly references the Agreement in the IEPA' s "No
Further Remediation" determination in the chain of title for the
Site in the county where the Site is located.
5 . The City promises IEPA and the Owner/Operator that it will
prohibit the use of groundwater that is contaminated from the
release at the Site at levels above Tier 1 remediation objec-
tives beneath its Right-of-Way as a potable or other domestic
supply of water and will limit access to soil as described
herein under the Right-of-Way that is contaminated from the re-
5
lease at the Site at levels above Tier 1 remediation objectives .
As the pavement in the Right-of-Way may be considered an engi-
neered barrier, the Owner/Operator agrees to reimburse the City
for maintenance activities requested by Owner/Operator in writ-
ing in order to maintain it as a barrier. The City does not oth-
erwise agree to perform maintenance of the Right-of-Way, nor
does it agree that the highway Right-of-Way will always remain a
highway or that it will maintain the Right-of-Way as an engi-
neered barrier.
6 . The Owner/Operator agrees to indemnify and hold harmless the
City, and other highway authorities, if any, maintaining the
highway Right-of-Way by an agreement with the City, and the
City' s agents, contractors, officers or employees for all obli-
gations asserted against or costs incurred by them, including
attorney' s fees and court costs, associated with the release of
Contaminants from the Site, regardless whether said obligations
or costs were caused by the negligence, but not the gross negli-
gence, of them.
7 . As an additional consideration, Owner/Operator agrees to re-
imburse the City for the reasonable costs it has incurred in
protecting human health and the environment, including, but not
limited to, identifying, investigating, handling, storing and
disposing of contaminated soil and groundwater in the Right-of-
Way as a result of the release of contaminants at this Site, and
the review and processing of this Agreement . The City has deter-
mined those costs for Owner and such costs amount to two thou-
sand five hundred dollars ($2500 . 00) . A cashier' s check made
payable to "City of Elgin, Illinois" shall be tendered to the
City at the time Owner/Operator furnishes a signed Agreement to
the City for its signature . That check will be deposited when
all necessary parties sign this Agreement .
8 . This Agreement shall be binding upon all successors in inter-
est to the Owner/ Operator or highway Right-of-Way. A successor
in interest of the City would include a highway authority to
which the City would transfer jurisdiction of the highway.
9 . Violation of the terms of this Agreement by Owner/Operator,
or their successors in interest, may be grounds for voidance of
this Agreement as a Highway Authority Agreement . Violation of
the terms of this Agreement by the City will not void this
Agreement, unless the IEPA has determined that the violation is
grounds for voiding this Agreement as a Highway Authority Agree-
ment and the City has not cured the violation within such time
as IEPA has granted to cure the violation.
6
10 . This Agreement shall continue in effect from the date of
this Agreement until the Right-of-Way is demonstrated to be
suitable for unrestricted use and there is no longer a need for
this Agreement as a Highway Authority Agreement, and the IEPA
has, upon written request to the IEPA by the Owner/Operator and
notice to the City, amended the notice in the chain of title of
the Site to reflect unencumbered future use of that highway
Right-of-Way.
11 . This Agreement is in settlement of claims the City may have
arising from the release of Contaminants into the Right-of-Way
associated with incident number 903209 .
12 . This Agreement does not limit the City' s ability to con-
struct, reconstruct, improve, repair, maintain and operate a
highway upon its property or to allow others to use the highway
Right-of-Way by permit . To that extent, the City reserves the
right and the right of those using its property under permit to
remove contaminated soil or groundwater above Tier 1 residential
remediation objectives from its Right-of-Way and to dispose of
them as they deem appropriate not inconsistent with applicable
environmental regulations so as to avoid causing a further re-
lease of the Contaminants and to protect human health and the
environment .
Prior to taking any such action, the City will first give
Owner/Operator written notice, unless there is an immediate
threat to the health or safety to any individual or to the pub-
lic, that it intends to perform a site investigation in the
Right-of-Way and remove or dispose of contaminated soil or
groundwater to the extent necessary for its work. Failure to
give notice shall not constitute a violation of this Agreement .
The removal or disposal shall be based upon the site investiga-
tion (which may be modified by field conditions during excava-
tion) , which Owner/Operator may review or may perform, if re-
quested to do so by the City. If practicable, as determined by
the City, the City may request Owner/Operator to remove and dis-
pose of the contaminated soil and/or groundwater necessary for
the City' s work in advance of that work. The Owner/Operator
shall reimburse the reasonable costs incurred by the City to
perform the site investigation and to dispose of any contami-
nated soil or groundwater, provided, however, that if notice to
Owner/Operator has not been given and there was no immediate
threat to health or safety, reimbursement for those costs shall
be limited to twenty thousand dollars ($20 , 000 . 00) . There is a
rebuttable presumption that the Contaminants found in the high-
7
way Right-of-Way arose from the release of Contaminants from the
Site . Should Owner/Operator not reimburse the reasonable costs
under the conditions set forth herein, this Agreement shall be
null and void, at the City' s option, upon written notice to
Owner/Operator by the City that those costs have not been reim-
bursed. Owner/Operator may cure that problem within twenty work-
ing days by making payment, or may seek to enjoin that result .
13 . Written notice required by this Agreement shall be mailed to
the following:
To Owner/Operator:
BP Products North America, Inc .
c/o David Piotrowski
28100 Torch Parkway, Suite 300
Warrenville, Ilinois 60555
To City:
Mr. John Loete
Public Works Director
150 Dexter Court
Elgin, IL 60120-5555
14 . The City' s sole responsibility under this Agreement with re-
spect to others using the highway Right-of-Way under permit from
the City is to include the following, or similar language, in
the future standard permit provisions and to make an effort to
notify its current permit holders of the following :
As a condition of this permit, the permittee shall re-
quest the City' s Public Works Department to identify
sites in the Right-of-Way where access to contaminated
soil or groundwater is governed by Tiered Approach to
Corrective-Action Objectives ( "TACO" ) Agreements . The
permittee shall take measures before, during and after
any access to these sites to protect worker safety and
human health and the environment . Excavated, contami-
nated soil should be managed off-site in accordance
with all environmental laws .
Owner/Operator hereby releases the City from liability for
breach of this Agreement by others under permit and indemnifies
the City against claims that may arise from others under permit
causing a breach of this Agreement . Owner/ Operator agrees that
its personnel , if any, at the Site who are aware of this Agree-
8
ment will notify anyone they know is excavating in the Right-of-
Way about this Agreement .
15 . Should the City breach Paragraph 5 of this Agreement,
Owner/Operator' s sole remedy is for an action for damages in the
Circuit Count for the Sixteenth Judicial Circuit, Kane County,
Illinois . Any and all claims for damages against the City, its
agents, contractors, officers, employees or its successors in
interest arising at any time for a breach of paragraph 5 of this
Agreement are limited to an aggregate maximum of two thousand
five hundred dollars ($2500 . 00) . No breach by the City, its
agents, contractors, officers, employees and its successors in
interest of a provision of this Agreement other than Paragraph 5
is actionable in either law or equity by Owner/Operator against
the City or its agents, contractors, officers, employees and its
successors in interest and Owner/Operator hereby releases the
City, its agents, contractors, officers, employees and its suc-
cessors in interest for any cause of action it may have against
them, other than as allowed in this paragraph, arising under
this Agreement or environmental laws, regulations or common law
governing the contaminated soil or groundwater in the highway
Right-of-Way. Should the City convey, vacate or transfer juris-
diction of that highway Right of-Way, Owner/Operator may pursue
an action under this Agreement against the successors in inter-
est, other than a State agency, in a court of law.
16 . This Agreement is entered into by the City in recognition of
laws passed by the General Assembly and regulations adopted by
the Pollution Control Board that encourage a tiered-approach to
remediating environmental contamination. This Agreement is en-
tered into by the City in the spirit of those laws and under its
right and obligations as a municipality. Should any provisions
of this Agreement be struck down as beyond the authority of the
City, however, this Agreement shall be null and void.
9
IN WITNESS WHEREOF, Owner/Operator has caused this Agreement to
be signed by its duly authorized representative .
BP PRODUCTS NORTH AMERICA, INC.
BY: L-.4. 0.th.(3-01- DATE : 2?- 20-6-4,_
--C:i'Z
David Piotrowski
Environmental Business
Manager
IN WITNESS WHEREOF, the City has caused this Agreement to be
signed by its Mayor.
CITY OF ELGIN
BY: DATE : I7�,,Z.,,,S/b 2--
Ed Schock, Mayor
ATTEST:
94a
Dolonna Mecum, City Clerk
F:\Legal Dept\Agreement\Hwy Authority Agr-BP Products (Amoco-520 Big Timber) .doc
10
Table 1
Soil BTEX Analytical Results
Amoco Service Station No.15966
1520 Big Timber Road
Elgin,lllinois
SAMPLE 1D DATE DEPTH BENZENE TOLUENE ETIiYIr . TOTAL
(F1) - BENZENE... XYLENES
MW-1 10/01/90 8-10 0.3201 0.970 0.420 3.600
MW-2 10/01/90 8-10 0.5301 11.000 9.100 43.000
B-1 10/01/90 10-12 <0.005 <0.005 <0.005 <0.005
B-2 10/01/90 8-10 0.2901 0.660 6.900 20.000
B-3 10/02/90 3-5 <0.005 0.0100 <0.005 0.045
MW-3 11/27/90 3-5 0.2501 <0.025 <0.025 0.008E
MW-4 11/28/90 8-10 0.026E 0.210E 0.290E 0.960
MW-5 11/28/90 2.5-4.5 0.045 0.048 0.540 0.630
MW-6 11/28/90 7.5-9.5 <0.005 <0.005 <0.005 <0.005
MW-7 03/06/91 7.5-9.5 0.5701 3.300 0.970 12.000
MW-8 07/15/91 - 0.510E1 6.700 8.100 3.600
MW-9 07/30/91 - 15.0001'5'6'5 93.0001'8 17.0001 93.000
MW-10 07/30/91 - 34.0001,5,6,5 160.0001'8 21.0001 120.000
RW-1 07/15/91 - 27.0001,5,6,5 230.0001'8 44.0001 240.0001
RW-2 07/29/91 - 4.500E1,5'6,8 27.0001 6.600 39.000
RW-3 07/29/91 - 9.3001,5,6,5 100.0001'8 38.0001 190.0001
Gasoline UST Excavation
East Wall 07/16/91 - <0.005 <0.005 <0.005 <0.005
North Wall 07/16/91 - 0.004E 0.002E <0.005 <0.005
South Wall 07/16/91 - 2.900E1'5'6'8 69.0001'8 38.0001 340.0001
West Wall 07/16/91 - <0.005 0.002E <0.005 <0.005
Base 07/16/91 - <0.005 0.003E <0.005 <0.005
Used Oil UST Excavation
East Wall 07/22/91 - <0.005 <0.005 <0.005 <0.005
South Wall 07/22/91 - <0.005 <0.005 <0.005 <0.005
North Wall 07/22/91 - <0.005 <0.005 <0.005 <0.005
Base 07/22/91 - <0.005 <0.005 <0.005 <0.005
SP-1 05/07/92 8.5-9.5 0.1411 0.088 0.144 0.547
05/07/92 12.5-14.5 0.010 <0.002 <0.002 <0.002
SP-2 05/07/92 8.5-9.5 1.3461'5 4.189 3.334 12.569
05/07/92 22-23 <0.002 <0.002 <0.002 <0.005
SP-3 05/07/92 8.5-9.5 0.8991'5 2.571 1.454 5.492
SP-4 05/07/92 8.5-9.5 0.2271 0.858 0.618 2.476
05/07/92 17.5-18.5 <0.002 <0.002 <0.002 <0.005
` SOIL C0111PONE1'1:TO.. :: . CLASS T* 0.03
GROUNDWATER INGESTION_ .'_ CI:i3SS:II 0.17
12 13 t 150
;29, 19 : ..150:. ::.
.
• : INGESTION REMEDIATION_. RESIDENTIAL >:::: .• 12 16.000...: . .7.800 • ; :160,000.
.. OBJECTIVES:;> COMMERCIAL . ... 4 >:1,000,�
100 -: r 10 000 :. 20Q 000 .
INIIALATI111REMEDIATION:- : RESIDENTIAL z 08. 650 .400- 320 ::. -.•
OBJECTIVES
COMMERCIAL f:� '454. 400. 320..
CONSTRUCTION WORKER -INGESTION
4300
EtEMEDIATION()BJECITV1< .: INHALATION :. 2.2 42 58 4iU,000 20�UU A10.UOQ..
2
8 - `:-320 ;. .<
1-Class I Soil Component to Groundwater Remediation Objective exceeded' 6-Commercial Inhalation Remediation Objective Exceeded r
2-Class II Soil Component to Groundwater Remediation Objective exceeded 7-Construction Worker Ingestion Remediation Objective exceeded Ft-`q ••a r
s ft ?
3-Reaidental Ingestion Remediation Objective exceeded 8-Construction Worker Inhalation Remediation Objective exceeded
4-Commercial Ingestion Remediation Objective exceeded
Results in milligrams per kilogram(mg/kg)
5-Residential Inhalation Remediation Objective exceeded Analyzed using USEPA Method 8020 :.�- _=
•This,ite has been evaluated based on Class 1 soil component to groundwater - .
Table 1
Soil BTEX Analytical Results
Amoco Service Station No. 15966
1520 Big Timber Road
Elgin,Illinois
•
DEPTH E
SAMPLE ID DATE BENZENE TOLUENE: :. B � TOTAL
(ET) ENZENE $YLENES
SP-5 05/07/92 8.5-9.5 0.030 <0.002 0.002 <0.005
05/07/92 15-17 <0.002 <0.002 <0.002 <0.005
SP-8 05/07/92 9.5-10.5 0.1801 0.011 0.147 0.240
SP-9 05/07/92 9.5-10.5 <0.002 <0.002 <0.002 <0.005
BH-1 02/19/97 6-10 <0.001 <0.002 <0.002 <0.002
BH-3 02/19/97 2-6 0.001 <0.002 <0.002 <0.002
BH-4 02/19/97 0-4 0.002 <0.002 <0.002 <0.002
BH-5 02/19/97 9-10 <0.001 <0.002 <0.002 <0.002
BH-6 02/19/97 6-8 <0.001 <0.002 <0.002 <0.002
BH-7 02/19/97 6-10 <0.001 <0.002 <0.002 <0.002
BH-8 02/19/97 6-8 <0.001 <0.002 <0.002 <0.002
BH-9 02/19/97 6-10 <0.001 <0.002 <0.002 <0.002
BH-10 02/19/97 6-10 <0.001 <0.002 <0.002 <0.002
BH-11 02/19/97 6-10 <0.001 <0.002 <0.002 <0.002
S-1 09/25/98 6-10 <0.002 <0.002 <0.002 <0.002
S-2 09/25/98 6-10 <0.002 <0.002 0.0024 0.007
MW-11 11/05/98 4-6 <0.002 <0.002 <0.002 <0.002
:.,-- . it,:COMPONENT ti-:: ::: CLASS.?*.. :... :: 0.03 : 13 : ..: :>:::13 .:.> 150
GRQDNDWATEK INGESTION :...:. CLASS II:: > :;0.1T. :'< .;: :. : 29 1.9 ;.'>:::: . : : 150:;':•
..,, TNGESTION:REMEDIATION;: RESIDENTIAL::: :..,. ::..::.12: IS,000.: ::..; >;: °7c800 :;.: .;:::160,000
OBJECTIVES : - : COMMERCIAL : . 100 : 410,000 200,000<;: 1,000,000
INhtALATION RBMEDIATION RESIDENTIAL.::.: : : ::.iii :- ,:.. - 650::z: -. .....::.. 400. ..:.-•.. 320.:`. ::,
OBJECTIVES. COMMERCIAL, 14 650 40p •-:-.320
CONSTRUCTION WORKER. ' :.: : INGESTION 4,300 ; ' ' ..<410.000 '>': 20.000 410.000
REMEDIATION OB,IECI'I ::. ,.. INHALATION 2.2 42 >5$:: 320
1-Class I Soil Component to Groundwater Remediation Objective exceeded• 6-Commercial Inhalation Remediation Objective Exceeded
2-Class II Soil Component to Groundwater Remediation Objective exceeded 7-Construction Worker
Ingestion Remediation Objective exceeded
3-Residental Ingestion Remediation Objective exceeded 8-Construction Worker Inhalation Remediation Objective exceeded
4-Commercial Ingestion Remediation Objective exceeded Results in milligrams per kilogram(rag/kg)
5-Residential Inhalation Remediation Objective exceeded Analyzed using USEPA Method 8020
•This site has been evaluated based on Class I soil component to groundwater
Table 2
Groundwater BTEX Analytical Results
Amoco Service Station No.15966
1520 Big Timber Road
Elgin,Illinois
SAMPLE ID DATE BENZENE TOLUENE ETHYL- TOTAL
BENZENE XYLENES
MW-1 12/01/93 4.500 17.000 1.400 7.600
03/01/94 0.960 4.800 0.940 5.400
06/01/94 0.690 6.600 1.100 5.500
09/01/94 0.320 0.660 0.200 1.000
12/01/94 0.700 2.400 0.570 2.800
03/01/95 0.550 0.890 0.660 3.300
06/01/95 0.540E 0.890 0.780 3.400
12/01/95 0.310 1.300 0.510 2.900
06/27/96 0.097 2.600E 0.560E 2.600E
09/11/96 0.001 0.057 0.050 0.250
12/06/96 <0.001 0.024 0.052 0.204
11/05/98 NS NS NS NS
12/06/99 NS NS NS NS
02/07/00 NS NS NS NS
05/24/00 0.019 0.074 0.68 1.8
08/22/00 0.035 0.13 1.000 3.600
12/12/00 0.011 0.430 <0.050 1.200
02/26/02 0.2801 0.160 0.450 1.300
MW-2 12/01/93 0.710 1.500 0.810 4.600
03/01/94 0.240 1.600 0.880 7.900
06/01/94 0.540 0.310 0.800 4.600
09/01/94 0.069 0.150 0.280 1.900
12/01/94 0.260 0.270 0.580 2.700
03/01/95 0.300 <0.002 0.440 3.400
06/01/95 0.380 0.330 1.200 5.000
12/01/95 0.210 <0.002 0.510 2.200
06/27/96 0.056 <0.020 0.180 0.620
09/11/96 0.004 0.009 0.120 0.370
12/06/96 0.099 0.018 0.380 0.918
11/05/98 NS NS NS NS
12/06/99 0.021 0.012 0.047 0.310
02/07/00 0.024 0.016 0.041 0.170
05/24/00 0.0023 0.017 0.061 0.190
08/22/00 0.020 0.0068 0.043 0.170
12/12/00 0.0027 0.01 <0.005 0.019
02/26/02 0.00711 0.0078 0.025 0.066
MW-3 12/01/93 <0.0005 <0.0005 <0.0005 <0.0005
03/01/94 <0.0005 0.00051 <0.0005 0.002
06/01/94 <0.0005 <0.0005 <0.0005 <0.0005
09/01/94 <0.0005 <0.0005 <0.0005 <0.0005
12/01/94 <0.001 <0.002 <0.002 <0.002
03/01/95 <0.001 <0.002 <0.002 <0.002 '
06/01/95 NS NS NS NS
12/01/95 NS NS NS NS
06/27/96 NS NS NS NS
09/11/96 <0.001 <0.002 <0.002 <0.002
12/06/96 <0.001 <0.001 <0.001 <0.001
11/05/98 <0.001 <0.001 0.0019 0.0087
GROUNDWATER REMEDIATION CLASS P 0.005. 1.0 0.7 10
ODUCTIVES CLASS II . 0:025 2:5 10 10
1=Class I Remediation Objectives exceeded NS=Not Sampled
2=Class II Remediation Objectives exceeded Results in milligrams per liter(mg/I)
•This site has been evaluated based on Class I Remediation Objectives Analytical Method:EPA 8020
Table 2
Groundwater BTEX Analytical Results
Amoco Service Station No.15966
1520 Big Timber Road
Elgin,Illinois
ETHYL- V'I'AL
SAMPLE ID DATE BENZENE TOLUENE BENZENE XYLENES
12/06/99 NS NS NS NS
02/07/00 <0.001 <0.001 <0.001 <0.003
05/24/00 <0.001 <0.001 <0.001 <0.003
08/22/00 <0.001 <0.001 <0.001 <0.003
12/12/00 <0.001 <0.005 <0.005 <0.010
02/26/02 <0.001 <0.001 <0.001 <0.003
MW-4 12/01/93 0.072 0.0062 0.013 0.059
03/01/94 0.046 0.0024 0.008 0.041
06/01/94 0.170 0.0075 0.020 0.089
09/01/94 0.049 0.0011 0.0049 0.023
12/01/94 0.029 0.008 0.004 0.026
03/01/95 0.034 <0.002 0.003 <0.002
06/01/95 0.048 <0.002 0.008 0.014
12/01/95 0.048 <0.002 0.006 <0.002
06/27/96 0.002 <0.001 <0.001 <0.001
09/11/96 0.001 <0.002 <0.002 <0.002
12/06/96 0.014 <0.001 0.0013 <0.001
11/05/98 0.019 0.0011 <0.001 <0.002
12/06/99 0.0093 <0.001 <0.001 <0.003
02/07/00 0.0022 <0.001 <0.001 <0.003
05/24/00 0.0043 <0.001 <0.001 <0.003
08/22/00 0.0021 <0.001 <0.001 <0.003
12/12/00 0.005 <0.005 <0.005 <0.005
02/26/02 <0.001 <0.001 <0.001 <0.003
MW-5 12/01/93 0.00056 <0.0005 <0.0005 <0.0005
03/01/94 <0.0005 <0.0005 <0.0005 <0.0005
06/01/94 <0.0005 <0.0005 <0.0005 <0.0005
09/01/94 <0.0005 <0.0005 <0.0005 <0.0005
12/01/94 <0.001 <0.002 <0.002 <0.002
03/01/95 <0.001 0.003 <0.002 <0.002
06/01/95 NS NS NS NS
12/01/95 NS NS NS NS
06/27/96 NS NS NS NS
09/11/96 <0.001 <0.002 <0.002 <0.002
12/06/96 NS NS NS NS
11/05/98 NS NS NS NS
12/06/99 NS NS NS NS
02/07/00 NS NS NS NS
05/24/00 <0.001 <0.001 <0.001 <0.003
08/22/00 <0.001 <0.001 <0.001 <0.003
12/12/00 NS NS NS NS
MW-6 12/01/93 <0.0005 <0.0005 <0.0005 0.00055
03/01/94 0.010 0.015 0.016 0.025
06/01/94 <0.0005 <0.0005 <0.0005 <0.0005
09/01/94 <0.0005 <0.0005 <0.0005 <0.0005
12/01/94 <0.001 <0.002 <0.002 <0.002
GROUNDWATER REMEDIATION CLASS I* 0.005'. 1.0 0.7 10
OBJECTIVES:: .. CLASS II 0.025' 2.5. 1.0 10
1=Class I Remediation Objectives exceeded NS=Not Sampled
2=Class II Remediation Objectives exceeded Results in milligrams per liter(mg/I)
•This site has been evaluated based on Class I Remediation Objectives Analytical Method:EPA 8020
' Table 2
Groundwater BTEX Analytical Results
Amoco Service Station No.15966
1520 Big Timber Road
Elgin,Illinois
ETHYL TOTAL
SAMPLE ID DATE BENZENE TOLUENE BENZENE XYLENES
MW-6 03/01/95 <0.001 <0.002 <0.002 <0.002
06/01/95 NS NS NS NS
12/01/95 NS NS NS NS
06/27/96 NS NS NS NS
09/11/96 <0.001 <0.002 <0.002 <0.002
12/06/96 <0.001 <0.001 <0.001 <0.001
11/05/98 <0.001 <0.001 <0.001 <0.002
12/06/99 NS NS NS NS
02/07/00 <0.001 <0.001 <0.001 <0.003
05/24/00 <0.001 <0.001 <0.001 <0.003
08/22/00 <0.001 <0.001 <0.001 <0.003
12/12/00 <0.001 <0.005 <0.005 <0.010
02/26/02 <0.001 <0.001 <0.0015 <0.0041
MW-7 12/01/93 0.170 0.280 0.140 1.100
03/01/94 0.280 0.550 0.350 1.800
06/01/94 0.100 0.270 0.180 1.400
09/01/94 0.019 0.018 0.024 0.220
12/01/94 0.002 0.015 0.060 0.360
03/01/95 0.480 0.360 0.270 0.710
06/01/95 0.260 0.093 0.250 0.870
12/01/95 0.057 0.011 0.065 0.290
06/27/96 0.073 0.007 0.033 0.140
09/11/96 0.042 0.006 0.013 0.062
12/06/96 0.120 0.011 0.074 0.324
11/05/98 NS NS NS NS
12/06/99 0.033 0.036 0.071 0.240
02/07/00 0.049 0.047 0.11 0.360
05/24/00 0.0058 0.029 0.031 0.093
08/22/00 0.059 0.019 0.096 0.330
12/12/00 0.027 0.16 <0.100 0.510
02/26/02 0.0771 0.054 0.260 0.780
MW-8 12/01/93 0.630 0.110 0.980 5.200
03/01/94 0.270 0.051 0.260 1.500
06/01/94 0.160 0.018 0.170 0.660
09/01/94 0.015 0.002 0.011 0.074
12/01/94 0.110 0.006 0.098 0.490
03/01/95 0.052 0.004 0.040 0.120
06/01/95 0.160E 0.014 0.490E 1.200
12/01/95 0.017 0.013 0.043 0.100
06/27/96 0.140E 0.008 0.160E 0.540E
09/11/96 NS NS NS NS
12/06/96 0.084 0.0039 0.048 0.257
11/05/98 0.130 0.013 0.084 0.320
12/06/99 NS NS NS NS
02/07/00 0.042 0.0032 0.0096 0.022
05/24/00 0.160' 0.0056 0.110 0.180
GROUNDWATER CLASS I":: 0.005.. 1.0; 0.7 • 10
OBJECTIVES> CLASS II`` 0.025 2.5 1.0 :.: 10
1=Class I Remediation Objectives exceeded NS=Not Sampled
2=Class II Remediation Objectives exceeded Results in milligrams per liter(mg/1)
*This site has been evaluated based on Class I Remediation Objectives Analytical Method:EPA 8020
• Table 2
Groundwater BTEX Analytical Results
Amoco Service Station No.15966
1520 Big Timber Road
Elgin,Illinois
SAMPLE ID DATE BENZENE TOLUENE. ETHYL- TOTAL
BENZENE XYLENES
~MW-8 08/22/00 0.370 0.014 0.230 0.340
12/12/00 0.200 0.089 <0.005 0.055
02/26/02 0.0861 0.014 0.130 0.094
MW-9 12/01/93 5.900 16.000 1.800 12.000
03/01/94 4.500 15.000 2.500 15.000
06/01/94 2.400 9.100 1.200 10.000
09/01/94 0.650 7.500 0.710 6.700
12/01/94 0.610 3.000 0.650 3.100
03/01/95 0.920 9.600 1.700 11.000
06/01/95 0.710E 6.500 1.700 9.900E
12/01/95 0.540 2.600 2.000 14.000
06/27/96 0.120 0.290 1.200 10.00E
09/11/96 0.240 0.450 1.700 10.000
12/06/96 0.220 0.490 2.800 18.700
11/05/98 0.100 0.100 1.900 0.860
12/06/99 0.220 0.098 2.000 14.000
02/07/00 0.210 0.110 1.500 11.000
05/24/00 0.033 0.021 0.340 7.500
8/22/00 0.099 0.048 0.950 12.000
12/12/00 0.130 0.730 <0.100 8.900
02/26/02 0.2601 0.070 1.6001 13.0001
MW-10 12/01/93 2.500 13.000 1.500 10.000
03/01/94 1.100 3.500 1.300 6.000
06/01/94 1.600 7.500 1.600 7.200
09/01/94 0.520 11.000 0.820 6.600
12/01/94 0.310 2.200 0.780 3.100
03/01/95 0.220 1.900 0.630 3.000
06/01/95 0.230E 1.200 0.820 2.600
12/01/95 0.160E 1.100E 0.520E 2.100E
06/27/96 0.110 1.900 0.790 4.600
09/11/96 0.200 1.700 0.840 6.100
12/06/96 0.064 1.300E 0.910E 4.400E
11/05/98 0.058 0.180 0.640 3.100
12/06/99 0.088 0.067 1.100 4.800
02/07/00 0.064 0.073 0.930 4.100
05/24/00 0.023 0.032 1.100 6.100
08/22/00 0.0099 0.014 0.860 4.100
12/12/00 <0.001 <0.005 <0.005 <0.010
02/26/02 0.0351 0.024 0.490 2.600
MW-11 11/05/98 <0.020 <0.020 <0.020 <0.040
02/12/99 <0.001 <0.001 <0.001 <0.002
12/06/99 <0.001 <0.001 <0.001 <0.003
03/09/00 <0.001 <0.001 <0.001 <0.003
05/24/00 <0.001 <0.001 <0.001 <0.003
08/22/00 <0.001 <0.001 0.0011 <0.003
12/12/00 <0.001 <0.005 <0.005 <0.010
02/26/02 <0.001 <0.001 0.0021 0.016
GROUNDWATER RADIATION CLASS 0.005 10 0.7 14
•BJECTIVES.: CLASS U 0.025 25 1:0 10
1=Class I Remediation Objectives exceeded NS=Not Sampled
2=Class II Remediation Objectives exceeded Results in milligrams per liter(mg/1)
*This site has been evaluated based on Class I Remediation Objectives Analytical Method:EPA 8020
2/19/97
2-6
B- 0.001
T-<0.002
E-<0.002
X-<0.002
GRASS 2/19/97_... _
r •
8-10'
X
B.<0.001
BH-3 SP-g T-<0.002 rte.,
ASPHALT E.<0.002 0
BH 2
X.<0.002
MW-6
FORMER m ASPHALT LEGEND:
aK GAL. FORMER •B-1 BH 1
M 1 \ usal\ _j ---- PROPERTY BOUNDARY
L7' e-3 \ _ 121(GAL.UST J SP-B • SOIL BORING
•�
IL j-if ii-- m MONITORING WELL
96/25<08 0 MW-3 ; in-1 1 L 0 RECOVERY WELL
B-<0.002 J I'I I I I I I X SOIL PROBE
T-<0.002 m I BUILDING
E-<0.002 CONCRETE ,I
DATE SAMPLE DATE
X.<0.002 _ Hi I H 2719/97 DEPTH 6.0: SAMPLE DEPTH/REMEDIATION OBJECTIVE
e/x/98 W L j I L J' 6-10' B.<0.001 0.03 BENZENE
1 FORMER B-<0.001
J
10K GAL CONCRETE T-<0.002 T-<0.002 12 TOLUENE
T-<0.002 O UST°• E.<0.002 E-<0.002 13 EFHYLBENZENE
E-0.0024 B-2 1 COPY i ( X.<0.002 X=<0.002 150 TOTAL. XYLENES
X- 0.007 ~•S-1 1 1 ASPHALT
I
2/19/97
( 1- --•S-2 8H-1O < BELOW LABORATORY DETECTION LIMITS
6-8' I ASPHALT
B-<0.001 BH-6 M X11 O MW-9 M m B E ESTIMATED VALUE
T-<0.002 • 1 CONCRETE m
E-<0.002 1 BH-11 ALL CONCENTRATIONS EXPRESSED IN
X-<0.002 1 MW-1 • BH-9 2/19/97 MIWGRAMS PER KILOGRAM (mg/kg).
MW-5 ( , m •---I 6-10'
m BH-4 MW-2
m O i
12/12/00
B=<0.001
T=<0.005
E=<0.005
X=<0.010
GRASS
1--- ASPHALT I t.
MW 6
FORMER
MMRR.E ASPHALT I LEGEND:
Y FORMER
12/12/00 g I U� usUSTl ,`j ---- PROPERTY BOUNDARY
B=<0.001 g r__2 GAL.UST
T=<0.005 N -t-�i--'--_J ®m„
E_<0.005 -m m MONITORING WELL
LZG-I 8= 0.130
X=<0.010 • MW-3 ri_T rn_i I 'I I T= 0.730 0 RECOVERY WELL
'1 I L E_<0.100
J 1.111 J I X= 8.900
CO CONCRETE t yl i l l y 1 BUILDING I®�L: GW ELEV GROUNDWATER ELEVATION (IN FEET)
Z L;;I I B= 0.200 DATE R.O. SAMPLE DATE/REMEDIATION OBJECTIVES
L J.±I__.A T= 0.089 B=<0.001 .005 BENZENE
tonR� CONCR� E_<0.005 T=<0.001 1.0 TOLUENE
RAM] UST, - X= 0.055 E=<0.001 0.7 ETHYLBENZENE
6=<0.005 I •.TNOP7 • i • • • ;P ®®•• X=<O.001 10 TOTAL XYLENES
E_<0.005 •.I' •I•.,' •' B= 0.011 < BELOW LABORITORY DETECTION LIMITS
X=<0.010 •• `• •• • T= 0.430 '•
V®.. I ASPHALT MN��O' '.•. •• r• MW •~ '•MV? X= 1.200
ALL CONCENTRATIONS EXPRESSED IN
B=<0.001 mi••'CONcRETTE'- I • .�- MILLIGRAMS PER LITER (mg/L).
T=<0.001 :•' •:'•.I I •'' �• 12/12/00•E_<0.001 IY•.-�• .... •• , W-1 B= 0.005 NOTE: AREA OF IMPACT BASED ON CLASS I
X=<0.003 MW-5 ••, 1d1� .• y 4)• .,.; - I T=<0.005 REMEDIATION OBJECTIVES.
®®� I4._s_- - •. ~•..-i d -1 •. -4 I X=<0.005
B=0.0027 e •
T= 0.01 L
E=<0.005 a ,
X= 0.019 -
SIDEIN
12/12/00 +•••CDNCRETE '• CONCRETE •• r ESTIMATED AREA OF GROUNDWATER IMPACT
B= 0.027 J,
T= 0.16
E=<0.100 .,
X= 0.510 •'`' •
••ERG TIME.ER, RQ•D
FIGURE 2
1 z®• ESTIMATED IMPACTED GROUNDWATER MAP
B=<0.001 AMOCO SERVICE STATION NO. 15988
T=<0.005 1520 BIG TIMBERS ROAD
. - ' E_<0.005 •t • '•~•*• ELGIN. IWNOIS
x-<0.010 •+~
• PROJECT NO. PREPARED HY DRAWN HY•.`,• Y• 0 30 30066 P JC JH Delta
~••i ` DATE REVIEWED HY FILE NAME
•• MW-11•• SCALE IN S 8/05/02 15968SM /�A Conisu■tar,ts°1,,,.
GRASS
- - -7
1--- ASPHALT I :°1
FORMER ASPHALT I LEGEND:
I 6 GAL FORMER
USED 01t,
I -u7-1 j ---- PROPERTY BOUNDARY\ E-
N I 1"GAL UST
Lr_JLJI1
9_1* r-1-111-n- I L I
I'iilln I 1
m CONCRETE Ij j I I I BUILDING .:♦:.; AREA OF HIGHWAY AUTHORITY AGREEMENT
I IIN^IIIIN I
Z L L i� LtJ WrI∎∎�.
FORMER
10K CONCRETE
U USTa N
:�--CANOPY ASPHALT
1' b
I ASPHALT
CONCRETE
K ) f
I J
L
-AIL liMINON
.♦♦♦♦♦♦•`� ����-.)♦♦♦♦♦. FIGURE 3
.♦♦♦♦♦♦♦..♦♦♦♦♦♦♦♦♦♦♦♦.♦. HIGHWAY AGREEMENT LOCATION MAP
'♦♦♦♦♦♦♦♦♦♦.♦' AMOCO SERVICE STATION N0. 15988
♦♦♦♦♦♦♦♦♦♦♦♦♦ 1520 BIG TIMBERS ROAD
ELGIN, ILLJNOIS
'♦♦♦♦♦♦♦♦♦♦♦♦'
PROJECT R0. PREPARED BY DRAWN BY
30............ 30068 P RE JL Delta
_ DATE RENEWED BY FILE NAME
• SCALE IN FEET g/05/02 15966SM �-Erg,tlt nts.1„,.