Loading...
HomeMy WebLinkAbout02-226 Resolution No. 02-226 RESOLUTION APPROVING CHANGE ORDER NO. 12 IN THE CONTRACT WITH M. I .C. , INC. FOR THE RIVERFRONT/CENTER CITY PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with M. I .C. , Inc . for construction management services in connection with the construction of Phase I of the Riverfront/Center City Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 12 , attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5 . 02 . 0208 (9) the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interests of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Change Order No. 12 , a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: June 12, 2002 Adopted: June 12, 2002 Omnibus Vote: Yeas: 5 Nays : 0 Attest : SI Dolonna Mecum Dolonna Mecum, City Clerk CHANGE ORDER NO. 12 CONTRACT : A contract between the City of Elgin and M. I .C . , Inc. for construction management services in connection with the construction of Phase I of the Riverfront/Center City Project . PROJECT: Phase I of the Riverfront/Center City Project SCOPE: This 12th change order will authorize M. I .C. , Inc . to enter into change orders with the contractors referenced herein to provide for the construction of a stairway from the riverwalk to the Hemmens Cultural Center. CONTRACTS AND AMOUNT OF CHANGES : M. I .C. , Inc . is hereby directed to make the following changes in the following contracts related to the construction of a stairway from the riverwalk to the Hemmens Cultural Center: 1 . Tri City Contract : BALANCE EARTHWORK $ 15, 455 . 00 UNDERDRAIN PERFORATED 375 . 00 15, 830 . 00 2 . LPS Contract : UNIT PAVING 'a' $ 3 , 900 . 00 3 , 900 . 00 3 . Elliot Contract : BARRIER CURB $ 1, 058 . 96 CONCRETE PAVING 5" 4 , 151 . 45 CHEEK WALL 4 , 600 . 00 RETAINING WALL (VENEER) $ 21, 450 . 00 CONCRETE STAIRS 17, 000 . 00 $ 48, 260 . 41 4 . Sebert Contract : LANDSCAPE $ 5, 034 . 23 MULCH 144 . 00 $ 5, 178 . 23 • 5 . Complete Fence Contract : HANDRAIL $ 3 , 952 . 00 $ 3 , 952 . 00 6 . Bob' s Painting Contract : GRAFFITI RESISTANT COATING $ 2, 150 . 00 $ 2, 150 . 00 7 . Parr Electric Contract : LINE ITEMS FROM PATRICK $ 13 , 350 . 00 $ 13, 350 . 00 8 . M. I .C. , Inc. (to be performed by subcontracts with others) : BENCHES $ 4, 928 . 00 RETAINING WALL STONE VENEER 14, 382 . 92 CHEEK WALL COPING 8, 239 . 18 RETAINING WALL COPING 8, 044 . 92 SIGN PANEL 2 , 492 . 05 $ 38, 087 . 07 9. M. I . C. , Inc. General Conditions and Construction Management Services : TEMPORARY FENCING & GATES $ 2, 050 . 00 SURVEY 3, 000 . 00 TREE 465 . 00 DUMPSTER/PORTO LET 630 . 86 OVERHEAD & PROFIT 13 , 812 . 00 $ 19, 957 . 86 TOTAL AMOUNT OF CHANGE ORDER NO. 12 $150, 665 . 57 SUMMARY OF CHANGES AND CONTRACT AMOUNTS : Original Total Contract Amount $5, 775, 673 . 00 2% Owner Contingency Included in Contract Amount 104, 735 . 00 Less Previously Approved Change Orders : #1 Storm Sewer @ Kimball Ave. 30, 350 . 00 #2 Revised Layout @ Post Office 33 , 763 . 00 #3 Tree Protection @ Walton Island 1, 630 . 00 #4 Added Trees @ Walton Island 5, 626 . 00 • • #5 Added Benches @ Walton Island 2 , 460 . 00 #6 Additional Column @ Boat Ramp 5 , 244 . 00 #7 Credit from LPS-Rotary Plaza (5, 245 . 00) #8 Added Guardrail & Posts 7, 515 . 00 #9 Added Recycles Blanket not accepted #10 Revised Electric Plans 4 , 270 . 00 #11 Added Engraved Pavers 2 , 702 . 00 Remaining Balance of Owner Contingency $ 16, 420 . 00 Amount of Change Order #12 (without 5% contingency) $ 150 , 665 . 57 Net Increase in Original Contract Amount $ 134 , 245 . 57 New Total Contract Amount $5, 909, 918.50 REASON FOR CHANGE : The change order is germane to the original contract as signed. The change order is in the best interests of the city and authorized by law. OTHER CONTRACT PROVISIONS : All other contract provisions remained unchanged. CITY OF ELGIN M. I .C. , INC. , an Illinois corporation AIL -, BY _ cL Ci y Man:ger By Presi ent - — Attest : By 1?1•1//h Secretary fitzdte.s.-- City Clerk F:\Legal Dept\Agreement\ChangeOrderMIC-RiverfrontMasterPlanProject-WAC.wpd • y OF E(C/ a� City Agenda Item No. City of Elgin E >>JM. L -r; June 7, 2002 G .« 4 TO: Mayor and Members of the City Council RIVER ASA RESOURCE FROM: Olufemi Folarin, Interim City Manager SUBJECT: Change Order No. 12 with M. I .C. , Inc. for Phase I Riverfront/Center City Project . PURPOSE The purpose of the memorandum is to provide the Mayor and members of City Council with information to consider Change Order No. 12 with M. I .C. , Inc . for Phase I of the Riverfront/Center City Project . BACKGROUND On September 12 , 2001, the City Council awarded a guaranteed maximum construction management contract to M. I . C. , Inc . for the construction of Phase I of the Riverfront/Center City Project in the amount of $5, 775, 673 . 00 . The project is 98% complete. Change Order No. 12 involves the construction of a stairway from the riverwalk to the Hemmens Cultural Center. This item was bid as an alternate when the original bids were taken. The item was not included in the original award for budgeting purposes. As construction on Phase I of the Riverfront nears completion, additional funding has become available and the Construction Manager was able to secure quotes from the sub-contractors in order to determine if this element of the project could proceed. The contractors, scope of work and pricing are as follows : TRI CITY BALANCE EARTHWORK $ 15, 455 . 00 UNDERDRAIN PERFORATED 375 . 00 15, 830 . 00 LPS UNIT PAVING 'a' $ 3 , 900 . 00 3 , 900 . 00 M. I . C. Change Order No. 12 June 7, 2002 Page 2 ELLIOT BARRIER CURB $ 1, 058 . 96 CONCRETE PAVING 5" 4 , 151 . 45 CHEEK WALL 4 , 600 . 00 RETAINING WALL (VENEER) $ 21, 450 . 00 CONCRETE STAIRS 17 , 000 . 00 $ 48 , 260 .41 SEBERT LANDSCAPE $ 5, 034 . 23 MULCH 144 . 00 $ 5, 178 .23 COMPLETE FENCE HANDRAIL $ 3 , 952 . 00 $ 3 , 952 . 00 BOB'S PAINTING GRAFFITI RESISTANT COATING $ 2 , 150 . 00 $ 2 , 150 . 00 PARR ELECTRIC LINE ITEMS FROM PATRICK $ 13 , 350 . 00 $ 13 , 350 . 00 M.I .C. , INC. (to be performed by subcontracts with others) BENCHES $ 4 , 928 . 00 RETAINING WALL STONE VENEER 14 , 382 . 92 CHEEK WALL COPING 8 , 239 . 18 RETAINING WALL COPING 8, 044 . 92 SIGN PANEL 2 , 492 . 05 $ 38 , 087 . 07 M.I.C. , INC. General Conditions and Construction Management Services TEMPORARY FENCING & GATES $ 2 , 050 . 00 SURVEY 3 , 000 . 00 TREE 465 . 00 DUMPSTER/PORTO LET 630 . 86 OVERHEAD & PROFIT 13 , 812 . 00 $ 19 , 957 . 86 TOTAL $ 150, 665.57 M. I . C. Change Order No. 12 June 7, 2002 Page 3 The pricing submitted by the sub-contractors is consistent with their original bids for the specified stairway work. There is an overall increase of approximately $19, 000, due to additional costs for the Construction Manager. Prior Change Orders are listed below. It should be noted that Change Orders No. 1 and No. 2 were formally authorized and approved by the Mayor and City Council . Change Orders No. 3 through No. 11 were approved administratively because they were under the $10, 000 approval threshold authorized in the Construction Management Contract between the City and M. I .C. , Inc. The totals for Change Orders No. 1 through No. 11 were within the Owner' s Contingency Allowance of $104 , 735 . 00, which was included within the $5, 775, 673 . 00 Guaranteed Maximum Price for the contract with M. I .C. It is only with the inclusion of Change Order No. 12 that the Guaranteed Maximum Price is exceeded by $134 , 245 . 57 . SUMMARY OF CHANGES AND CONTRACT AMOUNTS : Original Total Contract Amount $5, 775, 673 . 00 2% Owner Contingency Included in Contract Amount 104 , 735 . 00 Less Previously Approved Change Orders : #1 Storm Sewer @ Kimball Ave . 30, 350 . 00 #2 Revised Layout @ Post Office 33 , 763 . 00 #3 Tree Protection @ Walton Island 1 , 630 . 00 #4 Added Trees @ Walton Island 5, 626 . 00 #5 Added Benches @ Walton Island 2 , 460 . 00 #6 Additional Column @ Boat Ramp 5 , 244 . 00 #7 Credit from LPS-Rotary Plaza (5, 245 . 00) #8 Added Guardrail & Posts 7, 515 . 00 #9 Added Recycles Blanket not accepted #10 Revised Electric Plans 4 , 270 . 00 #11 Added Engraved Pavers 2 , 702 . 00 Remaining Balance of Owner Contingency $ 16 ,420 . 00 Amount of Change Order #12 (without 5% contingency) $ 150 , 665 . 57 Net Increase in Original Contract Amount $ 134 , 245 . 57 New Total Contract Amount $5, 909, 918.50 • . . . M. I .C. Change Order No. 12 June 7, 2002 . Page 4 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED The Design Review Committee for the Riverfront Master Plan had previously approved the design and inclusion of the Hemmens Stairway in the bid documents . 0 FINANCIAL IMPACT The budget for this project is $6, 560, 000 . Grants and donations received and/or anticipated for this year total $1, 222 , 800 . The total funding available is $7, 782, 800 . To date, $7 , 875, 337 has been spent or encumbered, leaving a deficit of $92 , 537 . This deficit plus the change orders would require additional funding of $226, 783 . The Festival Park project has a remaining budget of $1 . 7 million. It is recommended that the necessary funds be transferred from Festival Park (project number 039520) to the Riverfront/Center City (project 039518) within the Riverboat Fund, account number 275- 0000-791 . 92-35 . These monies for Festival Park can be re-budgeted in 2003 , per City Council direction. LEGAL IMPACT \100/ The proposed change order requires an exception to the procurement ordinance. ALTERNATIVES 1 . Choose not to proceed with the project . 2 . Proceed with the change order and fund the project with proceeds from the sale of land and Riverfront Action Committee Revenue . 3 . Proceed with the change order and fund the project with greater than anticipated Riverboat Revenue . M. I .C. Change Order No. 12 June 7, 2002 Page 5 RECOMMENDATION The recommendation is to approve Change Order No. 12 with M. I .C. , Inc . for the Phase I Riverfront/Center City Project in the amount of $150, 665 . 57 and that the net increase in the contract in the amount of $134 , 245 . 57 be funded through a transfer from the Festival Park project . .+ pectf submitted, Tea Olufemi F in Inte 'm C ' y Manager RHM/sp Attachments ' may'violet-nemmenselev.tif ,t•.•. . _. . .._�,._ rvPage X 2"?..- .74pArct ;ifs vi,,,,, I ';j,-• CLA--". 6,1/4 r. e iili q../.4..../t.1 ri 4 '',-• :.4 ' . ..- Z.4.6./:4(-)11 ' . ..—..,....,4‘.4 „,,,,,, . ). , c.„„ .,,,,, . „,... .... e.,,, b , . ,,,, Jii it ' ►:•, .' /lam' /�.e%�%/��/�1.0�//��/ff•/ r',!I ,�•► ,_,.t 1 n • • '{/ > �i i•nti1 1•`;:• `dt .e.1 HemmensCultural Center ", ti ....�. .., , j� .. • ..f CCC �wao�a,• 1''+sr 1! l 4 �aye ..•u :i��; �� � .af if, I • �ii •.••.a...fu.11i•.•/ �I �/ / . \ .� affff� 1 t'en- 1� ! aOt�• 1 r.�'.a/s..r. 1111•. //ice ,��j `�' �►e...a a�wa�� �. l + A'a �a.� ItA tJ1�tte-�•a. .�.�.r�a.�u.a. {e,. '/� "� -����: ' ". • . • f//�..' / '/,'.'age• 1�t1!ai=�f����:w�•PINI lL�ans i I, ,1 .a�� e.----- ' ��• ,.: Stairway Elevation 1„ = 5' MAY.17.2002 10:40AM HITCHCOCK DESIGN GRP NO.324 P.1/1 Filt ( ..t4-4. -, 0, ..._...- - sep ''''I 1% ° PC ' '''*' ‘*'. = .S°° ' 'Am•••?ozoik,41. iF e, / :0).: ;'itt:'1:tkir W NINP" Net4 'N*`.440 •° °lir - * eA-t-t r'-'--44-11t. 11 0 1 \ir.sli 44 01 kfl M P-4.4"i 0. ,44 9 4, ;1,, "0„,, 0,.....:1-kow - 4 . , , ...i. ..,..,,,,.. 0,.,..:„......6,17... ....... , 41, -....., hi vil Ait ef:41* • : \II. 0 01.410", ..47,Z' I 04*, it 110 •• ttio,i�1 SIM K/Q71: A, . .a.,,,,,,,„ `' ►•4ir _,fit. ,%4 ., N - , 7 4 L AA) MItilltihrt/ d . ' Oitting (#14VC>i,r).. 0 40. . 1 '''' ' , ;1 17 , ,.. : . , f ,. „ ... a '•:/_-=-' ' ' :. . ,/ j�_ • ' Alfe„._ At1L`ftl . qui '''' Ar .;%.,..,-,-- ,-----..,--„,.,".4P4174 rOs::14'1% ' , , , 40,0,_,I maw, vio 0.1.,:_(,'5.."1•,104, re Silk lF i. r I Iijj 'jjj �� it (tlii ? AN0 C/! Resolution No. 02-226 RESOLUTION APPROVING CHANGE ORDER NO. 12 IN THE CONTRACT WITH M. I .C. , INC. FOR THE RIVERFRONT/CENTER CITY PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with M. I .C. , Inc . for construction management services in connection with the construction of Phase I of the Riverfront/Center City Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 12 , attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5 . 02 . 020B (9) the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interests of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Change Order No. 12 , a copy of which is attached hereto and made a part hereof by reference . Ed Schock, Mayor Presented: June 12 , 2002 Adopted: Vote : Yeas Nays : Recorded: Attest : Dolonna Mecum, City Clerk CHANGE ORDER NO. 12 CONTRACT: A contract between the City of Elgin and M. I . C. , Inc . for construction management services in connection with the construction of Phase I of the Riverfront/Center City Project . PROJECT: Phase I of the Riverfront/Center City Project SCOPE: This 12th change order will authorize M. I .C. , Inc . to enter into change orders with the contractors referenced herein to provide for the construction of a stairway from the riverwalk to the Hemmens Cultural Center. CONTRACTS AND AMOUNT OF CHANGES : M. I .C. , Inc. is hereby directed to make the following changes in the following contracts related to the construction of a stairway from the riverwalk to the Hemmens Cultural Center: 1 . Tri City Contract : BALANCE EARTHWORK $ 15, 455 . 00 UNDERDRAIN PERFORATED 375 . 00 15, 830 . 00 2 . LPS Contract : UNIT PAVING 'a' $ 3 , 900 . 00 3 , 900 . 00 3 . Elliot Contract : BARRIER CURB $ 1, 058 . 96 CONCRETE PAVING 5" 4, 151 .45 CHEEK WALL 4 , 600 . 00 RETAINING WALL (VENEER) $ 21, 450 . 00 CONCRETE STAIRS 17, 000 . 00 $ 48 , 260 . 41 4 . Sebert Contract : LANDSCAPE $ 5, 034 . 23 MULCH 144 . 00 $ 5, 178 . 23 5 . Complete Fence Contract : HANDRAIL $ 3 , 952 . 00 $ 3 , 952 . 00 6 . Bob' s Painting Contract : GRAFFITI RESISTANT COATING $ 2 , 150 . 00 $ 2 , 150 . 00 7 . Parr Electric Contract : LINE ITEMS FROM PATRICK $ 13 , 350 . 00 $ 13 , 350 . 00 8 . M. I . C. , Inc . (to be performed by subcontracts with others) : BENCHES $ 4 , 928 . 00 RETAINING WALL STONE VENEER 14, 382 . 92 CHEEK WALL COPING 8 , 239 . 18 RETAINING WALL COPING 8, 044 . 92 SIGN PANEL 2 , 492 . 05 $ 38, 087 . 07 9 . M. I .C. , Inc . General Conditions and Construction Management Services : TEMPORARY FENCING & GATES $ 2, 050 . 00 SURVEY 3 , 000 . 00 TREE 465 . 00 DUMPSTER/PORTO LET 630 . 86 OVERHEAD & PROFIT 13 , 812 . 00 $ 19, 957 . 86 TOTAL AMOUNT OF CHANGE ORDER NO. 12 $150, 665 . 57 SUMMARY OF CHANGES AND CONTRACT AMOUNTS : Original Total Contract Amount $5, 775, 673 . 00 2% Owner Contingency Included in Contract Amount 104 , 735 . 00 Less Previously Approved Change Orders : #1 Storm Sewer @ Kimball Ave . 30, 350 . 00 #2 Revised Layout @ Post Office 33 , 763 . 00 #3 Tree Protection @ Walton Island 1, 630 . 00 #4 Added Trees @ Walton Island 5, 626 . 00 • . • . - . #5 Added Benches @ Walton Island 2 , 460 . 00 #6 Additional Column @ Boat Ramp 5, 244 . 00 #7 Credit from LPS-Rotary Plaza (5 , 245 . 00) #8 Added Guardrail & Posts 7, 515 . 00 #9 Added Recycles Blanket not accepted #10 Revised Electric Plans 4 , 270 . 00 #11 Added Engraved Pavers 2 , 702 . 00 Remaining Balance of Owner Contingency $ 16, 420 . 00 Amount of Change Order #12 (without 5% contingency) $ 150 , 665 . 57 Net Increase in Original Contract Amount $ 134 , 245 . 57 New Total Contract Amount $5, 909, 918. 50 REASON FOR CHANGE: The change order is germane to the original contract as signed. The change order is in the best interests of the city and authorized by law. OTHER CONTRACT PROVISIONS : All other contract provisions remained unchanged. CITY OF ELGIN M. I . C . , INC. , an Illinois corporation By City Manager By President Attest : By Secretary City Clerk F:\Legal Dept\Agreement\ChangeOrderMIC-RiverfrontMasterTlanProject-WAC:wpd