HomeMy WebLinkAbout01-252 •
, • •
Resolution No. 01-252
RESOLUTION
AUTHORIZING EXECUTION OF A FIRST AMENDMENT AGREEMENT WITH
M. I .C. INC. FOR THE ELGIN RIVERFRONT PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum,
City Clerk, be and are hereby authorized and directed to execute
a First Amendment Agreement on behalf of the City of Elgin with
M. I .C. Inc . for the Elgin Riverfront Project, a copy of which is
attached hereto and made a part hereof by reference .
s; Ed Schock
Ed Schock, Mayor
Presented: September 12 , 2001
Adopted: September 12 , 2001
Vote : Yeas : 6 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
FIRST AMENDMENT AGREEMENT
THIS FIRST AMENDMENT AGREEMENT made and entered into this 7th day of
September 2001, by and between the CITY OF ELGIN, Illinois, an Illinois municipal
corporation(hereinafter referred to as the"City"), and M.I.C. Inc., a Illinois corporation,
(hereinafter referred to as "Construction Manager".)
WHEREAS, the City and Construction Manager hav4 previously entered into an
agreement dated April 18, 2001, relating to the Construction Manager providing certain
professional services for the City's Phase I Riverfront/Centeir City Project(hereinafter
referred to as the"Project"); and
WHEREAS,the Agreement further provides that upon receipt of all subcontract and
supplier bids for the Project,the Construction Manager shall propose a Guaranteed Maximum
Price which shall be the sum of the estimated Cost of Work for the Project and which shall
also include the Construction Manager's Contingency, the Construction Manager's Fee and
the Owner's Allowance, if any; and
WHEREAS, The Agreement further provides that upon acceptance by the City the
Guaranteed Maximum proposal for the Project and its basis $hall be set forth in amendments
to the Agreement: and
WHEREAS, The Construction Manager has received all subcontract and supplier bids
for the Project and has proposed to the City a Guaranteed Maximum Price for the Project.
NOW, THEREFORE, for and in consideration of the mutual undertaking contained
herein, and the mutual undertakings as contained in the Agreement between the City and the
Construction Manager of April 18, 2001, and other good and valuable consideration, the
receipt and sufficiency of which is hereby acknowledged, they parties hereto agree as follows:
1. That the Agreement between the City and the Construction Manager dated April
18, 2001 is amended as follows:
A. The Guaranteed Maximum Price for thO Project is $5, 775,673.00 which
includes all of the cost of the Work, Tho Construction Manager's
Contingency, the Owner's Allowance add the Construction Manager's
Construction Phase Fee for the Project. A cost summary providing for a
Guaranteed Maximum Price for the attached hereto and made a part
hereof as EXHIBIT A.
B. The Guaranteed Maximum Price of $5, 775,673.00 for the Project is for
the performance and completion of the project in accordance with the
documents listed and attached to this First Amendment Agreement as
Exhibits A through D as Follows:
(1) Exhibit A—Cost Summary providing for cost items of the
Guaranteed Maximum Price'
(2) Exhibit B—Drawings, Specific tions, addenda and
General, Supplemental and Oth r Conditions of the Contract
upon which the Guaranteed Ma imum Price for the Project
(3) Exhibit C —Assumptions andClarifications made in preparing
the Guaranteed Maximum Price.
(4) Exhibit D—Completion Schedule.
2. That the reasons for the changes to the Agreement as provided for in this First
Amendment Agreement are germane to the original contract as signed
3. That except as amended herein the terms and provisions of the Agreement
between the City and the Construction Manager dated April 18, 2001 shall remain
in full force and effect.
4. That in the event of any conflict between the prov sions of this First Amendment
Agreement and The Agreement dated April 18, 2 01 the terms of this First
Amendment Agreement shall control.
IN WITNESS WHEREOF, the parties have Caused this First Amendment
Agreement to be executed on the date and year first written above.
CITY OF ELGIN, a municipal M.I.C. Inc.
Corporation A Illinois Company
B ,i ,
'ity `l.nager P dent
Attest:
By BY ��� e / as
City Clerk ecretary
EXHIBIT A
August 15, 2001
Recommended & Agreed Contract Awards 2001 2002
B.P.#1 Tree Removal Herbo Tree Services
Contract for 2001 Awarded $ 8,975.00
Contract for 2002 $ 0.00
B.P. #2 Excavation Tri City Exca ation
Contract for 2001 Awarded $486,103.00
Contract for 2002 $27,777.00
B.P. #3 Asphalt H.B. Blacktop
Contract for 2001 Recommended 0.00
Contract for 2002 $ 7,946.00
B.P. #4/5 Cofferdam/Dewater M.I.C., Inc.
Contract for 2001 Awarded $1,122.043.00
Contract for 2002 $ 0.00
B.P #6 Storm Sewer Tri City Excavation
Contract for 2001 Awarded $ 46,587.00
Contract for 2002 $ 0.00
B.P. #7 Unit Paving LPS Paving
Contract for 2001 Recommended $ 107,960.00
Contract for 2002 $122,000.00
B.P. #8 Concrete Elliot Constriliction
Contract for 2001 Awarded $1,187,717.00
Contract for 2002 $303,920.00
B.P.#9 Masonry M.I.C., Inc.
Contract for 2001 Recommended $ 177,790.00
Contract for 2002 $230,653.00
B.P. #10 Steel Complete Fnce
Contract for 2001 Recommended $ 50,000.00
Contract for 2002 $ 42,050.00
Additional Steel for Alternates R&R Ironwoi-ks
Contract for 2001 Recommended $ 42,165.00
Contract for 2002 0.00
B.P. #11 Irrigation Illinois Irrigation
Contract for 2001 Recommended $ 99,450.00
Contract for 2002 $ 28,050.00
B.P. #12 Landscape Sebert Lancscape
Contract for 2001 Recommended $247,657.00
Contract for 2002 $ 98,800.00
•
. .
B.P. #13 Graffiti Resistant/Painting Bob's Painting
Contract for 2001 Recommended $ 29,000.00
Contract for 2002 $ 29,803.00
B.P#14 Electrical Parr Electric
Contract for 2001 Recommended $187,000.00
Contract for 2002 $217,120.00
Work performed by M.I.C., Inc.
Contract for 2001 Recommended $126,201.00
Contract for 2002 $ 60,000.00
General Condition Allowance
Contract for 2001 Recommended $ 50,000.00
Contract for 2002 $ 50,000.00
Survey Allowance
Contract for 2001 Recommended $ 35,000.00
Contract for 2002 $ 15,000.00
Sub total for 2001 $4,003,648.00
Sub total for 2002 $1,233,119.00
3% Construction Contingency
For 2001 $ 120,109.00
For 2002 $36,993.00
2% Owner Contingency
For 2001 $ 80,073.00
For 2002 $24,662.00
M.I.C., Inc. Construction & post construction services Awarded
For 2001 $211,819.00
For 2002 $65,250.00
Total for 2001 $4,415,649.00
Total for 2002 $1,360,024.00
Guaranteed Maximum Price $5,775,673.00
Table of Contents
DIVISION 0-BIDDING REQUIREMENTS
00003 Table of Contents
00004 List of Drawings
PRE-BID INFORMATION
00010 Invitation to Bid
00030 Advertisement for Bids
INSTRUCTIONS TO BIDDERS
00100 Instructions to Bidders
00130 Pre-Bid Meeting
INFORMATION AVAILABLE TO BIDDERS
00210 Preliminary Construction Schedule
00220 Information Available to Bidders(geotech,etc.) •
BID FORMS
00300 Bid Form
SUPPLEMENTS TO BID FORMS
00410 Bid Security Form
00420 Bidder's Qualification Form
00430 Subcontractor List
00440 Substitution List
00450 Material Suppliers List
00480 Non-Collusion Affidavit
00415 Employee Utilization Form
00490 Sexual Harassment Policy Form
AGREEMENT FORMS
00500 Standard Forms
00510 Agreement between Owner and Contractor
BONDS AND CERTIFICATES
00610 Performance Bond Form
00620 Payment Bond Form
GENERAL CONDITIONS
00700 General Conditions
SUPPLEMENTARY CONDITIONS
00800 Supplementary Conditions
00821 Equal Employment Opportunity
00822 Prevailing Wages
00823 Insurance Requirements
• • • DIVISION I-GENERAL REQUIREMENTS
01030 Alternate Bids
01200 Project Meetings
01310 Construction Schedule
01340 Shop Drawings,Product Data and Samples
01370 Unit Price Schedule
01410 Testing Laboratory Services
01530 Barriers
01560 Temporary Environmental Controls
01570 Traffic Regulation .
01580 Project Identification&Signs
01591 Field Office
01700 Contract Closeout
01720 Project Record Documents
01730 Operation and Maintenance Data
DIVISION 2-SITE WORK
02100 Site Preparation
02110 Site Clearing
02200 Earthwork
02510 Asphalt Concrete Paving
02515 Unit Paving
02520 Concrete Curbs,Walks and Paving
02710 Subdrainage System
02720 Storm Sewerage
02815 Irrigation Sprinkler System
02870 Site and Street Furnishings
02930 Lawns and Grasses
02935 Prairie Establishment
02940 Wetland Establishment
02950 Trees,Shrubs,and Groundcovers
DIVISION 3—CONCRETE I
03100 Concrete Formwork
03200 Concrete Reinforcement
03300 Cast-in-place Concrete
03455 Precast Cantilever Panels
DIVISION 4-MASONRY
04200 Unit Masonry
04400 Stone Masonry
04450 Cut Stone Veneer
DIVISION 5-METALS
05500 Metal Fabrications
1
sMwl adolo1spocAtable of mahpu.doc
DIVISION 9-FINISHES
09860 Graffiti Resistant Coatings
DIVISION 16- ELECTRICAL
16010 Basic Electrical Requirements
16110 Raceways
16118 Boxes and Handholes
16120
16140 Wire and Cables
Wiring Devices
16161 Electrical Enclosures
16195
16450 Electrical Identification
Grounding
16463 Power Centers
16470 Panelboards
16475 Overcurrent Protection
16520 Pole Lighting
16550 Lighting and Power Controls
APPENDIX
Addenda issued
Permits
Addenda #1 March 19 , 2001 4 Pages
Addenda #2 March 20 , 2001 8 Pages
Addenda #3 March 23 , 2001 3 Pages
00004 - List of Drawings
EX1-EX4 Existing Conditions Plans
RI-R6 Removals& Site Preparation Plans
IMI-M10 Material Callout Plans
LGI-LGI I Layout&Grading Plans
Dl-D25 Details
AI-A3 Island Pavilion Details
11-15 Irrigation Plans&Details
P1-P11 Planting Plans&Details
ELO-EL8 Electrical Plans&Details
ER1-ER2 Erosion Control Plans
CSI Construction Scope Plan
tir
p r:
Cr
EXHIBIT C
ASSUMPTIONS AND CLARIFICATIONS TO THE GUARANTEED
MAXIMUM PRICE FOR TILE ELGIN RIVER FRONT
1. Amendment#1 for the Guaranteed Maximum Price for the Elgin River Front is
incorporated here by reference. All assumptions and clarifications include in
Amendment#1 remain in effect.
2. The Guaranteed Maximum Price for the Elgin River Front is
All work per Exhibit"A".
3. The Guaranteed Maximum Price includes M.LC. {nc. construction phase services
fee, Construction Manager's construction contingency, and owner's contingency
as shown in Exhibit A.
4. The Guaranteed Maximum Price does not include any costs shown below:
a. Building permit fees
b. City/County/State fees or costs
c. Sales Tax
d. Architectural and/or engineering fees and costs
e. Construction Testing services
f. Utility connection or consumption for water, sewer, steam, natural gas, or
electric fees.
g. Utility tap-in fees
h. Performance Bond for M.I.C. Inc.'s C.M. Services
i. Construction security services
5. The following allowances are included in Guaranteed Maximum Price under
Amendment#1
GENERAL CONDITION ALLOWANCE
Storage Rental $ 2,000.00
Material Allowance $ 10,000.00
Labor Allowance $20,000.00
Trailer/office Rental $ 5,000.00
Mobilization $ 10,000.00
Temporary Telephone $ 6,500.00
Temporary Fencing $ 4,000.00
Temporary Utilities $ 10,000.00
Portolet $ 1,500.00
Dumpsters $ 5,000.00
Testing $ 10,000.00
Construction Photos $ 5,000.00
Office Supplies $ 6,000.00
Survey $ 50,000.00
Job Safety $ 5,000.00
General Condition Allowance Total $150,000.00
6. The schedule is based on the following
a. Normal weather for Elgin, Illinois utilizing weather data for the period of
1990 to 2000
b. Review of shop drawings/submittals to lbe within 14 calendar days of
receipt by the Architect/Engineer.
.•
EXHIBIT D
COMPLETION SCHEDULE FOR THE ELGIN RIVER FRONT PROJECT
1. The date of Substantial Completion established by this Amendment for all Bid
Packages for the Elgin River Front Project is: lune 1, 2002.