HomeMy WebLinkAbout01-210 Resolution No. 01-210
RESOLUTION
AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT
WITH JOE DEMERCURIO
(40 DuPage Court)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum,
City Clerk, be and are hereby authorized and directed to execute
a facade improvement program agreement on behalf of the City of
Elgin with Joe DeMercurio for the property commonly known as
40 DuPage Court, a copy of which is attached hereto and made a
part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: July 25, 2001
Adopted: July 25, 2001
Omnibus Vote : Yeas : 7 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
r
CITY OF ELGIN
FACADE IMPROVEMENT PROGRAM AGREEMENT
THIS AGREEMENT is made and entered into this 207H day of
U W , 2001, by and between the City of Elgin, Illinois, a
munici al corporation (hereinafter referred to as "City" ) , and Joe
DeMercurio, the authorized agent of the property owner, Lora Seigle
(hereinafter referred to as "Owner" ) .
WHEREAS, City has established a facade improvement program
(hereinafter referred to as "Program" ) for application within
certain areas of the corporate limits of City designated by City as
appropriate for such application (hereinafter referred to as
"Rehabilitation Areas" ) ; and
WHEREAS, Program is administered and funded solely by City for
purposes of the control and prevention of blight, dilapidation and
deterioration of Rehabilitation Areas; and
WHEREAS, pursuant to Program, City has undertaken to share the
cost of facade improvements to certain structures within
Rehabilitation Area, pursuant to the criteria set forth herein; and
WHEREAS, City has or shall retain the services of an
architectural consultant (hereinafter referred to as "Consultant")
to provide participants in Program with certain conceptual design
work regarding proposed improvements, including, but not
necessarily limited to, a color rendering of draft improvement
designs and an outline of work specifications at no cost to Program
participants; and
WHEREAS, Owner owns at least 50% of subject commercial
building (s) , or is the tenant of commercial building (s) located
within Rehabilitation Area, with owner having provided the owner' s
consent and authority to participate in Program pursuant to the
terms and provisions of this Agreement .
NOW, THEREFORE, in consideration of the mutual promises and
covenants contained herein, the sufficiency of which is hereby
acknowledged, the parties hereto hereby agree as follows :
Section 1 . The total approved project costs for facade
improvements for the structure referred to at Section 16 herein
shall be $107, 308 . 00, as set forth in Attachment A attached hereto
(such total approved project costs for facade improvements are
hereinafter referred to as "Eligible Costs" and such structure is
hereinafter referred to as the "Structure" ) . The City shall pay the
Owner a sum not to exceed $37, 557 . 80 of the Eligible Costs, being
35% of the total Eligible Costs, for facade improvements for the
structure approved pursuant to the provisions of this Agreement The
project shall be confined to approved improvements made to that
1
a
part of the Structure visible from any public right-of-way. All
parties hereto agree that all payments from the City provided for
herein shall be made to Joe DeMercurio, who shall provide the City
with a full release upon receipt .
Section 2 . Eligible costs shall include labor, material and
equipment costs, and such other costs as may be reasonably
necessary for the execution and completion of the facade
improvement hereby provided for (hereinafter referred to as the
"Work" ) , as designated from the design drawings and specifications
approved by the Project Review Team pursuant to the provisions of
Section 3 herein and prepared by Consultant (hereinafter referred
to as "Plans" ) .
Section 3 . No Work shall be undertaken or shall be considered
to constitute the basis for an Eligible Cost until the design for
such Work has been submitted to and approved in writing by the
Project Review Team, consisting of the City' s Urban Design and
Preservation Specialist and City' s Principal Planner, and any other
member designated on the Project Review Team. Such design shall
include, but not be limited to, a date certain by which the Work
shall be completed. In no event shall such Work be completed more
than one hundred eighty (180) days from the date of this Agreement,
without the written consent of the Project Review Team.
Section 4 . The Project Review Team shall be permitted access
to Structure to periodically review the progress of the Work. Such
review shall not be in lieu of any other inspections which may
otherwise be required by law or by City. Any and all portions of
the Work which do not, in the sole discretion of the Project Review
Team, conform to the Plans or other applicable terms of this
Agreement, shall be made to conform to the Plans and other
applicable Terms of this Agreement upon written notice of the
existence of such non-conforming portions .
Section 5 . Upon completion of the Work, and upon final
inspection and written approval by the Project Review Team and such
other final inspections and approvals as may be required by law,
Owner shall submit to City: (1) an executed, notarized itemized
contractor statement reflecting the total cost of the Work and each
portion thereof, including, but not limited to, the cost of labor
(whether provided by any contractor or subcontractor) , materials
and equipment; (2) copies of all bids, contracts and invoices
submitted, executed or incurred pursuant to the Work; and (3)
reasonable proof of payment of all costs incurred pursuant to the
Work.
Section 6 . City shall pay to Owner the sum provided for at
Section 1 herein within thirty (30) days of owner' s compliance with
the provisions of Section 5 herein. In no event shall the amount
paid to Owner exceed the amount specified in this Agreement or in
the contractor statement .
2
y
Section 7 . In the event Owner fails to complete the Work in
accordance with the terms of this Agreement, or otherwise breaches
the terms of this Agreement, City may terminate this Agreement upon
written notice of breach and termination to Owner, and any and all
financial or other obligations on the part of City shall cease and
become null and void.
Section 8 . Upon completion of the Work, and for a period of
five (5) years thereafter, Owner shall properly maintain the Work
in its finished form, without alteration or change thereto, and
shall not enter into any agreement, or take any other steps to
alter, change or remove such Work, or to create or undertake any
other Work which may constitute a deviation from the Plans, without
prior written approval from the Project Review Team in its sole
discretion.
Section 9 . Nothing herein is intended to limit, restrict or
prohibit the Owner from undertaking any other Work in or about the
subject premises which is unrelated to the facade improvement
provided for in this Agreement .
Section 10 . This Agreement shall be binding upon City and its
successors, and upon Owner, Owner' s successors and assigns for a
period of five (5) years from and after the date of completion and
approval of the Work. Owner shall provide subsequent Owner(s) of
Structure with a copy of this Agreement . This Agreement shall run
with the land underlying Structure.
Section 11 . If Owner does not own the underlying property for
which Work is being done, Owner warrants and represents to City
that Owner has a lease at the location for which the Work is
proposed for a term of at least six (6) years. Owner further
warrants and represents that he has received authorization from all
owners of the property for which Work is to be done to accept funds
under this program and to undertake the Work. Further, such
owner (s) of the property for which Work is to be done hereby
acknowledges that he is aware of this Agreement and authorized the
Work which is to be made to the Structure. Said owner (s) of the
property for which improvements are to be made further acknowledge
that, as owner of the property, he is a party to this Agreement and
is bound by the provisions of this Agreement specifically, but not
limited to, the provisions of Section 6 of this Agreement . Each
"Owner" signature hereto hereby warrants and represents that there
are no other entities having an ownership interest in the
Structure, which have not executed this Agreement .
Section 12 . Owner hereby holds harmless and indemnifies City
from and against any and all causes of action, suits, claims for
damages, and any and all other liability, which may arise out of or
in connection with Owner' s or Owner' s agents, employees and
assigns' negligent performance of any of the terms of this
Agreement .
3
i
Section 13 . This Agreement shall not be construed to create
a partnership, joint venture or employment relationship between the
parties hereto.
Section 14 . This Agreement shall be subject to and governed
by the laws of the State of Illinois. The parties hereto hereby
agree that venue for any and all actions which may be brought by
each and either of them to enforce the provisions of this Agreement
shall be in the Circuit Court of Kane County, Illinois.
Section 15 . The terms of this Agreement shall be severable.
In the event that any of the terms or provisions of this Agreement
are deemed to be void or otherwise unenforceable for any reason,
the remainder of this Agreement shall remain in full force and
effect .
Section 16 .
Owner' s Name : Lora Seigle
Agent of Owner: Joe DeMercurio
Address: JDM Associates
40 DuPage Court, #209
City: Elgin, IL 60120
Telephone Number: (847) 695-4408
Property Location: 40 DuPage Court
Ownership Interest : Agent of Owner
Contact Person: Joe DeMercurio
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the date first appearing above.
As to CITY OF ELGIN As to O
By: 1
ercurio
e7-1W1, el* Agen of Owner
ATTEST: /GJ 412
Dolonna Mecum, Clty Clerk
4
Work Item Contractor#1 Contractor#2
New Signs Schroeder Sign Co. $8,600.00
Paint Removal Singles Roofing Co. $29,155.00 Seylers,Inc. $34,395.00
Masonry Sealing Singles Roofing Co. $8,450.00 Seylers, Inc. $14,900.00
Exterior Painting All-tech Decorating $43,200.00 Agrarian Way $56,480.00
New Awnings Hunzinger Canvas $8,563.00
Co.
New Aluminum Mark Industries $9,340.00 Fox Valley $11,149.00
Doors at Entrance Glazing
totals $107,308.00 $116,924.00
City of Elgin Agenda Item No.
July 6, 2001
ALIVE DOWNTOWN
TO: Mayor and Members of the City Council
FROM: Joyce A. Parker, City Manager
SUBJECT: Facade Project for 40 DuPage Court
PURPOSE
The purpose of this memorandum is to provide the Mayor and members
of the City Council with information to consider a facade
improvement project for 40 DuPage Court .
BACKGROUND
The owner of the property, Lora Seigle, wishes to participate in
the Facade Improvement Program.
This turn-of-the-century building, commonly referred to as the
Elgin Commerce Building, is a unique example of Elgin' s downtown
commercial buildings . It was commissioned in 1892 by Gen. A. B.
Spurling, a Civil War hero, and founder of what is now CR
Industries .
Designed by the well-known architect, W. W. Abell, the building
originally had three-story high bay windows which were removed when
the building was modernized.
The applicant for the project is Joe DiMercurio, of JDM Associates,
an architectural firm, representing the property owner for the
project . Mr. Mercurio has put together the proposal and has
submitted all the required documentation to complete the project .
Under normal procedures of the Facade Improvement Program, the City
invites local area architects to bid on providing architectural
services for projects . The City directly enters into a contract
with the architect and reimburses fees independent of any
allocation for the project . However, in this case, with applicant
being the architect, the City has saved the additional cost of
architectural fees .
Facade Project at 40 DuPage Court
July 6, 2001
Page 2
The work to the facade involves paint removal from all the brick on
the building to return it back to its original condition, cleaning
and repainting the metal panels on the facade and the aluminum
storefronts to a darker green color that will compliment the
exposed brick work, installing new awnings above all storefront
windows and the entrances, cleaning and tuckpointing the common
brick on the north elevation which is visible from Spring Street,
and installing new signage on the building. The applicant does not
intend to reconstruct the bay windows on the facade due to the high
cost .
The estimated project cost is $107, 308, not including architectural
services . Under the provisions of the Facade Improvement Program,
the participants would be entitled to a rebate of 35 percent of the
construction cost . The rebate, as calculated, would be
approximately $37, 557 . 80 .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
Elgin Heritage Commission.
F NANCIAL IMPACT
Approval of the comprehensive facade project for 40 DuPage Court at
the 35 percent level would equal approximately $37, 557 . 80, which
would amount to the total City participation since no architectural
fees are involved. The total amount budgeted for the Facade
Improvement Program in 2001 is $82 , 056 . 00 (account number 350-0000-
795 . 78-99, Downtown Development Fund, Facade Improvement Program) .
To date, $70, 082 . 30 has been spent or encumbered, leaving a balance
of $11, 973 . 70 . The amount is not sufficient to fund the project .
However, funds previously allocated to the State Street Facade
Improvement Program have not been utilized (account number 270-
0000-791 . 78-99, project number 079505) . A balance of $49, 000 is
available to ' fund the $25, 585 needed to proceed with this project .
There are no pending or anticipated projects for the State Street
program at this time . A budget adjustment will be required.
GAL IMPACT
An agreement between the City of Elgin and the property owner at 40
DuPage Court will be required.
Facade Project at 40 DuPage Court
July 6, 2001
Page 3
ALTERNATIVES
1 . Approve the request by Joe DiMercurio for participation in the
Facade Improvement Program.
2 . Reject the request to proceed with the project .
RECOMMENDATION
It is recommended that the request to proceed with the facade
improvement project for 40 DuPage Court be approved.
Respectfully submitted,
n 9
Joyce A. Parker
City Manager
JAP/sbs
Attachments
Work Item Contractor#1 Contractor#2
New Signs Schroeder Sign Co. $8,600.00
Paint Removal Singles Roofing Co. $29,155.00 Seylers, Inc. $34,395.00
Masonry Sealing Singles Roofing Co. $8,450.00 Seylers, Inc. $14,900.00
Exterior Painting All-tech Decorating $43,200.00 Agrarian Way $56,480.00
New Awnings Hunzinger Canvas $8,563.00
Co.
New Aluminum Mark Industries $9,340.00 Fox Valley $11,149.00
Doors at Entrance Glazing
totals $107,308.00 $116,924.00
CHEMICALLY REMOVE MINT -
TO NATURAL MICR 9 MT 1LU[FAMELE
.. ..WITH EPDXY MUTT
I DARK GREY GREEN APFRUNI
._ .. ._._:_. .. ... .. .....J. T.ALUY MIDIDOIE.._.
PRA. s►DKY.lM T
SOUTH ELEVATION- _....._..EAST_ELEVATION-__ .. _ ELGINLCOMMERCE_.BUILDING
40 DuPAGB Cr.-.-.-
TEL,,"T) W5-4"8' L