Loading...
HomeMy WebLinkAbout01-127 Resolution No. 01-127 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH DHL DEVELOPMENT, LLC FOR THE LORDS PARK FAMILY AQUATIC CENTER WHEREAS, the City of Elgin has heretofore entered into a contract with DHL Development, LLC for construction of the Lords Park Family Aquatic Center; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No . 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: May 9, 2001 Adopted: May 9, 2001 Omnibus Vote : Yeas 6 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk BURBACH AQUATICS, LLC 5974 HIGHWAY 80 SOUTH* P.O. BOX 721* PLATTEVILLE,WI 53818 608-348-3262 FAX:608-348-4970 5505 NORTH BERKELEY BLVD*WHITEFISH BAY,WI 53217 414-967-7005 FAX:414-967-7006 CHANGE ORDER Project Lords Park Family Aquatic Center Date March 19, 2001 Owner City of Elgin Change Order Number 01 Contractor DHL Development, LLC Changes Ordered: Relocate water and sewer to accomadate backwash tank and surge tanks new footprint add $3,712.00. Provide additional pool area lighting fixture and exterior PA speakers and telephone conduit from utility pole to bathhouse mechancial room add $6,287.20. Enlarge door openings at # 21 and the passage between the consession room and the storage room, add $933.91. Reason for Change Order: The proposed location of the surge tanks and backwash tank were moved to avoid impacting trees and the existing soil grades south of the proposed mechancial building. The Owner requested revisions to the PA and pool area lighting and a conduit for the facility telephone service cable. The Owner has requested that door opening at #21 and the passage between the consession room and storage been increased from 3'-0" to 3%6". CONTRACT PRICE: CONTRACT TIME: Not Changed _ Not Changed xx Increased by $10,933.11 _ Increased by Days Decreased by $ _ Decreased by Days ORIGINAL CONTRACT AMOUNT: $ 1,639,743.00 PREVIOUS CHANGES: $ -0- THIS CHANGE ORDER: $ 10,933.11 CONTRACT TOTAL: $ 1,650,676.11 The foregoing change, work affected thereby, is subject to all contract stipulations and covenants. ENGINEER Approval Recommended: ;L ` & Date: March 19, 2001 CONTRAC Accepted by. ��� ��-f-� Date: 4ALb Title: OWNER � ��7� Approved by: Date: r° </ Title: (9-e- "a 41 OF E�Ci „,.0 „ Agenda Item No. City of Elgin (Plk 4'441)1 E L April 2 , 2001G TO: Mayor and Members of City Council N FROM: Joyce A. Parker, City Manager RECREATIONAL LEISURE AND CULTURAL OPPORTUNITIES FOR ALL CITIZENS Subject : Change Order No. 1 with DHL Development, LLC For the Lords Park Family Aquatic Center PURPOSE The purpose of this memorandum is to provide the Mayor and members of City Council with information to consider Change Order No. 1 to the DHL Development, LLC contract for Lords Park Family Aquatic Center. BACKGROUND In November of 2000, the City Council awarded a contract to DHL Development, LLC for the construction of the Lords Park Family Aquatic Center in the amount of $1, 639, 743 . Change Order No. 1 involves the work associated with relocating the surge tanks to protect trees, revising the proposed outdoor sound and lighting system, trenching for the telephone service cable, and widening the concession access doors . Please refer to the attached memo dated January 3 , 2001 concerning the above. The cost breakdown is as follows : Relocating the surge tanks : $3 , 712 . 00 Outdoor lighting, sound modifications, telephone service trenching $6, 287 . 20 Enlarge door openings $933 . 91 Total change order request $10, 933 .11 COMMUNITY GROUPS/ INTERESTED PERSONS CONTACTED None . Change Order No . 1/ Lords Park April 2 , 2001 Page 2 FINANCIAL IMPACT The original contract with DHL Development is for $1, 639, 743 . The funding for the change order in the amount of $10, 933 . 11 is available in account number 275-0000-791 . 92-36, project number 509564 , and will bring the contract total to $1, 650, 676 . 11 . LEGAL IMPACT None . ALTERNATIVES None . RECOMMENDATION The recommendation is to approve Change Order No. 1 to DHL Development, LLC contract for the Lords Park Family Aquatic Center in the amount of $10, 933 . 11 . Re .ectfully submitted, ..00;" a. 721,........., Joe A. Parker City Manager r OF EtCi L � City of Elgin Memorandum ATCO January 3, 2001 To: Joyce Parker, City Manager From: Jim Bell, Superintendent of Parks Via: Monica Meyers, Director of Parks and Recreation Re: Lords Park Pool Change Order At the pool construction meeting on 1/02/01, there was discussion to move the surge tanks from the South side of the mechanical building to the North side of the building. The other issue discussed was the weather and the effect on the mason's work. Both of these issues may generate change orders for the project. The change of location of the surge tanks is for two reasons; 1. Protect the trees on the South side of the building from the excavation of the root zones. 2. The final grade of the placement of the tanks would allow only 4" of topsoil to be placed over the tanks creating an area where no grass or vegetation would grow. Placing the surge tanks to the North allows for placement of a concrete deck over the tanks and protects the tree root zones to the South. Price for the relocation of underground utilities to accommodate the tanks is $3,712. The cold temperatures may make it necessary to tent and heat the new bath house during the construction process. This is necessary for the mason to install the C.M.U. block and mortar at the appropriate temperature. Block installation is not scheduled to proceed until the week of January 15. If the temperatures warm up this change order may not be necessary. Estimated cost for the heating and tenting is not to exceed$10,000. To keep this project on schedule, this work has been approved with a change order to be processed when the actual work is determined. cc: Dave Lawry, General Services Manager r