Loading...
HomeMy WebLinkAbout00-81 Resolution No. 00-81 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH KEITH FOSTER GOLF COURSE DESIGN FOR GOLF COURSE DESIGN SERVICES WHEREAS, the City of Elgin has heretofore entered into a contract with Keith Foster Golf Course Design for golf course design services; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: March 22 , 2000 Adopted: March 22, 2000 Omnibus Vote : Yeas 7 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk CHANGE ORDER NO. 1 ORIGINAL CONTRACT: Phase II contract with Keith Foster Golf Course Design dated March 5, 1998 for golf course design services . SCOPE : This Change Order No. 1 will compensate Keith Foster Golf Course Design for services related to three additional golf course routing designs and expenses related thereto. REASONS FOR CHANGE : The original Phase II agreement provided for one conceptual plan which included a layout of golf holes, clubhouse, maintenance area, practice area, parking areas and driveways . Subsequent to the receipt of the original routing plans several unanticipated events occurred relating to the subject site thereby complicating the golf course design. As a result thereof, Keith Foster Golf Course Design was required to generate three additional golf course routing designs . The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the original contract was signed, the change is germane to the original contract as signed and the change order is in the best interests of the City and authorized by law. SUMMARY OF CHANGES AND CONTRACT AMOUNT: The Phase II contract will be revised as follows : Original Phase II Contract Amount Including Expenses : $26, 200 Change Order No. 1 Increase : $ 6 , 550 New Total Phase II Contract Amount Including Expenses : $32 , 750 OTHER CONTRACT PROVISIONS : All other contract provisions shall remain the same . AGREED TO THIS / 7 DAY OF MARCH, 2000 . KEITH FOSTER GOLF COUR E DESIGN CITY OF ELGIN By / C� /�--^ By Y .t K f; 17/ th Foster, resident Ci y7M nager Attest : r��k_ ti_ City Clerk 0.0 (I , City of Elgin Agenda Item No. NFjL. � March 2, 2000 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Amendment No. 1 to Golf Course Architect Contract - Phase II with Keith Foster Golf Course Design PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider Amendment No. 1 to an agreement with Keith Foster Golf Course Design for additional design services for the Sports Complex Golf Course Project . BACKGROUND The original agreement with Keith Foster Golf Course Design was rm. authorized by City Council on October 28, 1998 for Phase II work and consisted of hydrology study consultation, conceptual routing plan revision and preliminary grading plan. Under the original agreement one conceptual plan was to be provided which included a layout of golf holes, clubhouse, maintenance area, practice area, parking areas and driveways. Subsequent to the receipt of the original routing plan, several unanticipated events occurred. The City contracted with SDI Consultants, Inc. to assist in determining whether the abandoned limestone pit could function as a lake. Foster was used in concert with SDI to ensure results of the hydro geology study could be incorporated into a feasible golf course lake configuration. Furthermore, two additional water sludge lagoons were added to the site complicating the 18-hole golf course design. As a result, Keith Foster Golf Course Design was required to generate three additional golf course routing designs . Mr. Foster has requested an additional $6, 550. 00 to compensate for the additional work required because of the unforseen circumstances as stated above. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Sports Complex Golf Leadership Team. te- Golf Course Architect Contract March 2, 2000 Page 2 (y$kFINANCIAL IMPACT Sufficient funds are available in account number 275-0000-795 . 92- 32 - Land Improvements, project number 509537 -Sports Complex Golf Course, to pay the $6, 550 Amendment No. 1 fee. LEGAL IMPACT fffI None. ALTERNATIVES None. RECOMMENDATION It is recommended that City Council approve Amendment No. 1 in the amount of $6, 550 with Keith Foster Golf Course Design for additional Phase II work and authorize staff to execute the amendment . Respectfully submitted, Joyce A. Parker City Manager re- _ - _ .4, /,„.„. F DS /Ip COURSE Nose February 9,2000 In the Grand Tradition of the Game Mr.Jim Nowicki City of Elgin 150 Dexter Court Elgin, IL 60120-5555 Dear Jim, We are very excited to be working with you and the City on the golf course project. When completed it will be a wonderful addition to the City of Elgin. I did want to follow up on our phone conversation as it relates to our proposal. Our proposal consists of 2 phases. The first has to do with the routing phase while the second pertains to the conceptual grading phase. I do not anticipate the 2nd phase of our proposal adjusting and believe everything can remain as planned. The first phase however will require more time than intended and wanted to speak with you about the additional time requirement. To date,we have spend$4,000 of the$5,000 cap for fees. The remaining $1,000 will be applied to the additional time requirements. I anticipate: • 3 days of my time (1 design, February 15th meeting, March 8th meeting) • 2 days of Art's time (2 design) • 4 days of staffs time The total time requirement to complete the revised plan totals $7,550 in anticipated fees minus the $1,000 left equals an additional $6,550. The expenses costs will only be increased slightly due to the additional airfare for the 2 upcoming trips. I do apologize for having to quickly ask for an increase in the cap. But as you know, the original intent was to confirm the previous routing. Instead the routing was redrawn to fit the site issues more carefully. I do sincerely appreciate your understanding. With regards, eith F stet KF:krt 5615 Old Poag Road • Edwardsville, IL 62025 • Office 618-659-8551 • Fax 618-659-0408 Member:Tire Ammon Society of Golf Course Arcbitecte •