HomeMy WebLinkAbout99-78 Resolution No. 99-78
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
KARL-STEFANS CONSTRUCTION, INC. FOR THE
HOLMES ROAD DETENTION PROJECT
WHEREAS, the City of Elgin has heretofore entered into a
contract with Karl-Stefans Construction, Inc. for the Holmes
Road Detention Project; and
WHEREAS, it is necessary and desirable to modify the terms
of the contract as is described in Change Order No. 1, attached
hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1 , a copy of which is attached hereto and made a part
hereof by reference.
s/ Kevin Kelly
Kevin Kelly, Mayor
Presented: March 10, 1999
Adopted: March 10, 1999
Omnibus Vote: Yeas 6 Nays 0
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
I -
ji
►v
ELGIN, ILLINOIS
HOLMES ROAD DETENTION PROJECT
PROJECT #429505
CHANGE ORDER NO. I
SCOPE: This Change Order No. 1 will provide additional items
necessary to complete the project.
The general contractor for this project is Karl-Stefans Con-
struction Inc . , of Batavia, Illinois .
REASON FOR CHANGE: This Change Order is required for the
addition or change in items necessary to adjust payment for
substandard work on the forming of the concrete swale.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The awarded contract
will be changed to include the additional items listed below:
ITEM COST
1 . ) Deduction for improperly $9,250.00
constructed concrete swale.
The original contract with Karl-Stefans Construction, Inc. is
for $30, 705 . 00 . The Contractor has submitted an extra work
claim of $6 , 045 . 00 for extra embankment required to bed the
swale bringing the total amount of billing to the City to
$36 ,750 . 00 . By reason of this Change Order No. 1, the con-
tract for the Holmes Detention Basin Project will be decreased
in the amount of nine thousand two hundred fifty and 00/100
dollars ( $9 ,250 . 00) . The final contract amount inclusive of
Change Order No. 1 is twenty-seven thousand five hundred and
00/100 dollars ( $27 ,500 . 00) .
CHANGE ORDER NO. 1
February 17, 1999
Page 2
The circumstances which necessitate this change order were not
reasonably foreseeable at the time the contract was signed.
OTHER CONTRACT PROVISIONS: All other contract provisions
shall remain the same.
Agreed to this day of , 1999 .
Recommended:
PUBLIC WORKS DEPARTMENT
T i e 44-i5
Date: z/25/91
Accepted:
KARL-STEFANS CONSTRUCTION, INC.
Party of e S- • /d e (Contractor)
By: 4.
Title:
Date:_ 2-2..S- t
Approved:
CITY OF ELGIN
Part •f the /Firs Part (Owner)
By: .p LL..
Title: _a..., /
Date: 3 -
KARLSTEF.CO/TEXT071/CHANGOR.99
OF Etc
crm,stt,
City of Elgin Agenda Item No.
February 18 , 1999
TO: Mayor and Members of the City Council
FROM: Joyce A. Parker, City Manager
SUBJECT: Authorization of Change Order No. 1, Final Payment
and Acceptance of Holmes Road Detention Project
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information to consider
acceptance of the Holmes Road Detention Project and the
authorization of Change Order No. 1 and final payment .
BACKGROUND
The City of Elgin awarded a contract to Karl-Stefans Construc-
tion, Inc. of Batavia, Illinois on August 26 , 1998 . The
�w contract in the amount of $30, 705 was for the installation of
400 lineal feet of concrete drain swale in the detention basin
on Holmes Road. The purpose of the project was to facilitate
the flow of stormwater through the basin.
The work has been performed, but the work was not consistent
with the construction documents . The swale was constructed of
concrete in the correct location, but it was not built in the
shape specified. The constructed concrete swale in a U-shape
will convey the stormwater, but the conveyance will be slight-
ly less efficient as the specified V-ditch.
Considerable negotiations between the City and the contractor
have occurred. These negotiations have resulted in a proposed
settlement contained in the attached letter dated January 21,
1999 from the contractor. The contractor submitted a Request
for Payment in the amount of $36, 750, an increase of $6 , 045
above the original contract amount . The increase requested
was due to extra embankment material supplied during construc-
tion. The proposed settlement amount of $27, 500 equals a
reduction of $9, 250 . This adjustment reflects a contractor
reduction of $6, 045 for the extra work disputed by the City
plus a deduction of $3 , 205 by the City for work performed but
not in conformance with the contract document, specifically
the concrete swale.
Authorization of Change Order No. 1
February 18 , 1999
Page 2
This negotiated settlement of $27, 500 to the contractor
represents full and complete payment by the City and is
documented in Change Order No. 1 (attached) . The contractor
will grant the City a Final Waiver of Lien upon payment of
this amount . The City will be responsible for the general
cleanup of the detention basin and removal of excess spoil .
This effort by City forces is estimated to take less than
three days to complete .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None .
okL FINANCIAL IMPACT
/�" Final cost on the project will be $27, 500 from the Sewer
Operating Fund, account number 430-4202-772 . 92-80, project
number 429505 . Funds were encumbered in 1998 for this
project .
101 ,/LEGAL IMPACT
10100/
None .
ALTERNATIVES
There are two alternatives that have been evaluated.
First, the City can authorize the payment of $27, 500 to
Karl-Stefans Construction, Inc. as full and complete for the
captioned project . This payment includes a credit of $9, 250
from the contractor. A copy of correspondence dated January
21, 1999 from Karl-Stefans Construction, Inc . outlining the
proposed contract completion accompanies this memorandum.
This alternative avoids litigation and additional significant
costs . The costs incurred will be appropriate for the func-
tional value of the improvement .
Second, the City could pursue complete performance of the
contract in accordance with the contract documents . This
alternative would almost certainly result in litigation. In
other words, the contractor would have to remove the current
concrete swale and replace it with one that fully meets the
specifications at no additional cost .
Authorization of Change Order No. 1
February 18, 1999
Page 3
r
RECOMMENDATION
It is recommended that the City Council authorize execution of
Change Order No. 1, accept the completed project and authorize
the final payment of $27, 500 to Karl-Stefans Construction,
Inc .
Respectfully submi ed,
Jo e Parker
City Manager
DV:cm
attachments
t
r