HomeMy WebLinkAbout99-252 Resolution No. 99-252
RESOLUTION
AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT
PROGRAM AGREEMENT
(7 South State Street)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Joyce A. Parker, City Manager, and Dolonna
Mecum, City Clerk, be and are hereby authorized and directed
to execute a facade improvement program agreement on behalf of
the City of Elgin with William Vincent for the property
commonly known as 7 S . State Street, a copy of which is
attached hereto and made a part hereof by reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: September 22 , 1999
Adopted: September 22 , 1999
Omnibus Vote : Yeas 6 Nays , 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
CITY OF ELGIN
FACADE IMPROVEMENT PROGRAM AGREEMENT
STATE STREET FACADE PROGRAM
THIS AGREEMENT is made and entered into this 22nd day of
September, 1999, by and between the City of Elgin, Illinois, a
municipal corporation (hereinafter referred to as "City") , and
William Vincent, (hereinafter referred to as "Owner") .
WHEREAS, City has established a facade improvement program
(hereinafter referred to as "Program") for application within
certain areas of the corporate limits of City designated by City as
appropriate for such application (hereinafter referred to as
"Rehabilitation Areas") ; and
WHEREAS, Program is administered and funded solely by City for
purposes of the control and prevention of blight, dilapidation and
deterioration of Rehabilitation Areas; and
WHEREAS, pursuant to Program, City has undertaken to share the
cost of facade improvements to certain structures within
Rehabilitation Area, pursuant to the criteria set forth herein; and
WHEREAS, Owner owns at least 500 of a commercial building (s) ,
or is the tenant of a commercial building (s) located within a
Rehabilitation Area, and owner desires to participate in Program
pursuant to the terms and provisions of this Agreement .
NOW, THEREFORE, in consideration of the mutual promises and
covenants contained herein, the sufficiency of which is hereby
acknowledged, the parties hereto hereby agree as follows :
Section 1 . City shall pay to Owner a sum not to exceed
$24 , 550 for facade improvements approved pursuant to the provisions
of this Agreement (hereinafter referred to as "Eligible Costs") for
the Structure referred to at Section 17 herein (hereinafter
referred to as "Structure") . The project shall be confined to
approved improvements made to that part of the Structure,.€fig
All parties hereto agree that all payments from
the City provided for herein shall be made to William Vincent, who
shall provide the City with a full release upon receipt .
Section 2 . Eligible costs shall include labor, material and
equipment costs, and such other costs as may be reasonably
necessary for the execution and completion of the facade
improvement hereby provided for (hereinafter referred to as the
"Work") , as designated from the design drawings and specifications
approved by the Project Review Team pursuant to the provisions of
Section 3 .
Section 3 . No Work shall be undertaken or shall be considered
to constitute the basis for an Eligible Cost until the design for
such Work has been submitted to and approved in writing by the
Project Review Team, consisting of the City' s Director of Business
Services and Properties, City' s Historic Preservation Specialist,
and City' s Rehabilitation Specialist . Such design shall include,
but not be limited to, a date certain by which the Work shall be
completed. In no event shall such work be completed more than one
hundred eighty (180) days from the date of this Agreement, without
the written consent of the Application Review Team.
Section 4 . Notwithstanding anything to the contrary provided
in this agreement, it is understood by the parties that the project
activities include those items outlined in Exhibit A.
Section 5 . The Project Review Team shall be permitted access
to Structure to periodically review the progress of the Work. Such
review shall not be in lieu of any other inspections which may
otherwise by required by law or by City. Any and all portions of
the work which do not, in the sole discretion of the Project Review
Team, conform to the Plans or other applicable terms of this
Agreement, shall be made to conform to the Plans and other
applicable Terms of this Agreement upon written notice of the
existence of such non-conforming portions .
Section 6 . Upon completion of the Work, and upon final
inspection and written approval by the Project Review Team and such
other final inspections and approvals as may be required by law,
Owner shall submit to City: (1) an executed, notarized itemized
contractor statement reflecting the total cost of the Work and each
portion thereof, including, but not limited to, the cost of labor
(whether provided by any contractor or subcontractor) , materials
and equipment; (2) copies of all bids, contracts and invoices
submitted, executed or incurred pursuant to the Work; and (3)
reasonable proof of payment of all costs incurred pursuant to the
Work.
Section 7 . City shall pay to Owner the sum provided for at
Section 1 herein within thirty (30) days of owner' s compliance with
the provisions of Section 6 herein. In no event shall the amount
paid to Owner exceed the amount specified in this Agreement or in
the contractor statement .
Section 8 . In the event Owner fails to complete the Work in
accordance with the terms of this Agreement, or otherwise breaches
the terms of this Agreement, City may terminate this Agreement upon
written notice of breach and termination to Owner, and any and all
financial or other obligations on the part of City shall cease and
become null and void.
2
Section 9 . Upon completion of the Work, and for a period of
five (5) years thereafter, Owner shall properly maintain the Work
in its finished form, without alteration or change thereto, and
shall not enter into any agreement, or take any other steps to
alter, change or remove such Work, or to create or undertake any
other work which may constitute a deviation from the Plans, without
prior written approval from the Project Review Team in its sole
discretion.
Section 10 . Nothing herein is intended to limit, restrict or
prohibit the Owner from undertaking any other work in or about the
subject premises which is unrelated to the facade improvement
provided for in this Agreement .
Section 11 . This Agreement shall be binding upon City and its
successors, and upon Owner, Owner ' s successors and assigns for a
period of five (5) years from and after the date of completion and
approval of the work. Owner shall provide subsequent Owner (s) of
Structure with a copy of this Agreement . This Agreement shall run
with the land underlying Structure .
Section 12 . If Owner does not own the underlying property for
which work is being done, Owner warrants and represents to City
that Owner has a lease at the location for which the work is
proposed for a term of at least six (6) years . Owner further
warrants and represents that he has received authorization from all
owners of the property for which work is to be done to accept funds
under this program and to undertake the work. Further, such
owner (s) of the property for which work is to be done hereby
acknowledges that he is aware of this Agreement and authorized the
work which is to be made to the Structure . Said owner (s) of the
property for which improvements are to be made further acknowledge
that, as owner of the property, he is a party to this Agreement and
is bound by the provisions of this Agreement specifically, but not
limited to, the provisions of Section 6 of this Agreement . Each
"Owner" signature hereto hereby warrants and represents that there
are no other entities having an ownership interest in the
Structure, which have not executed this Agreement .
Section 13 . Owner hereby holds harmless and indemnifies City
from and against any and all causes of action, suits, claims for
damages, and any and all other liability, which may arise out of or
in connection with Owner ' s or Owner ' s agents, employees and
assigns ' negligent performance of any of the terms of this
Agreement .
Section 14 . This Agreement shall not be construed to create
a partnership, joint venture or employment relationship between the
parties hereto.
3
Section 15 . This Agreement shall be subject to and governed
by the laws of the State of Illinois . The parties hereto hereby
agree that venue for any and all actions which may be brought by
each and either of them to enforce the provisions of this Agreement
shall be in the Circuit Court of Kane County, Illinois .
Section 16 . The terms of this Agreement shall be severable .
In the event that any of the terms or provisions of this Agreement
are deemed to be void or otherwise unenforceable for any reason,
the remainder of this Agreement shall remain in full force and
effect .
Section 17 . Owner' s Name : William Vincent
Address : P.O. Box 971
City: Elgin State : IL Zip Code : 60121
Telephone Number: (312) 888-4464
Property Location: 7 South State Street
Ownership Interest : Owner
Contact Person: William Vincent
Owner ' s Name :
Address :
City: State : IL Zip Code :
Telephone Number:
Property Location
Ownership Interest : Owner:
Owner' s Name :
Address :
City: State : IL Zip Code :
Telephone Number:
Property Location
Ownership Interest : Tenant :
Owner ' s Name :
Address :
City: State : IL Zip Code :
Telephone Number:
Property Location
Ownership Interest :
4
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement on the date first appearing above .
OWNE CITY ELGIN
By. �.
Joyc arker, City Manager
OWNER ATTEST:
Do�nna Mecum City Clerk
OWNER
OWNER
OWNER
5
City of Elgin Agenda Item No.
�
August 6 , 1999
TO: Mayor and Members of the City Council
FROM: Joyce A. Parker, City Manager
SUBJECT: Facade Project for 7 South State Street
PURPOSE
The purpose of this memorandum is to provide the Mayor and members
of the City Council with information to consider a Facade
Improvement Program project for 7 South State Street .
BACKGROUND
The owner of the property, Bill Vincent of VTS Inc . Investigators,
wishes to participate further in the State Street Facade
Improvement Program. Mr. Vincent received $3, 000 through the State
Street Facade Program for the same property in 1998, the proposal
for which was reviewed and approved by the City Council .
The work at 7 South State Street on the west facade involves
removing the stone face on the lower half of the building and
replacing with brick to match original, repairing and replacing
windows, installation of decorative details to window trim,
replacing entry doors, adding exterior lighting, and brick cleaning
and tuck pointing. A new concrete stoop is to be installed as
well . The brick will also be painted and a new awning with signage
attached to the west side.
The following improvements will be made to the rear facade of the
property: removal and replacement of 2-story deck structure, brick
cleaning and tuck pointing, installation of rubber roofing, and
repair and replacement of windows. The rear facade will also be
painted and new lights added. The rear facade is highly visible
from the Chicago Street Metra Station and improvements on that
portion of the building will also serve a public benefit .
Two quotes were solicited for the proposed repairs . The estimated
project cost on the low bid for this project is $49, 100 . Under the
provisions of the Facade Improvement Program, the participants
would be entitled to a rebate of 50 percent of the construction
cost . The rebate, as calculated, would be approximately $24 , 550 .
eolk
Facade Improvement/7 South State Street
August 6 , 1999
Page 2
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
Elgin Heritage Commission.
ft FI ANCIAL IMPACT
Approval of the comprehensive facade project for 7 South State
Street at the 50 percent level would equal $24, 550 . All expenses
would be charged to account number account number 275-0000-791 . 78-
99, project number 07951A.
LEGAL IMPACT
%"v
None .
ALTERNATIVES
1 . Approve the request by Bill Vincent for participation in the
State Street Facade Improvement Program.
2 . Reject the request to proceed with the project .
RECOMMENDATION
It is recommended that the request to proceed with the facade
improvement project for 7 South State Street be approved.
Respectfully submitted,
PA- . Ess
l
Joyce A. AParker
City Manager
Attachment
Executive Renovations
PO Box 5503
Elgin, M 60121
847-695-0414
July 23, 1999
Mr. Bill Vincent
VTS Inc.
7 South State
Elgin, IL 60123
Proposal
We Propose to furnish the materials and supply the labor for exterior renovations to
7 South State as per the following summary and as per print dated 7/6/99 by S.
Vincent.
East Side
Remove existing tad story porch and stairs.
Fabricate box frames for each of the 3 window openings
Install 3 new"Survivor"thermopane double hung windows with white trim and grills. _
Install limestone sills under each window.
Replace brick above South window.
Tuckpoint all rear brick.
Install wood lh round trim above windows.
Install 2 new exterior doors, flush outswing, commercial grade with locks.
Install 8 6x6 treated lumber post to support landings. Post set on concrete pier 42" deep.
Frame new 2d story landing and stairs constructed of wolmanized lumber for structure
and cedar decking. (as per print)
Frame 19'x8' overhang porch over back door on tad floor. Sheet roof deck with 3/4
plywood.
Install rubber roofing on roof. Counterflash into wall.
Frame I"floor landing as per print, constructed of wolmanized lumber for structure with
cedar decking.
Painting:
Paint wall window trim stained white.
"` Prep brick, prime with Thoroseal primer, finish paint with Thoroseal.
Electrical:
Install 3 recessed lights above,9"-—goor door:- -
Install 2 lights near 1' floor door.
Install security light mounted to East wall brick.
West Side
Remove existing stone face on lower half of building.
Install brick in place of stone, match to existing as close as possible.
Frame window frames with 2x material trimmed.
Install glass window panes on North window and false bronzed metal panes on South
window.
Trim exterior of windows with cedar.
Install.wood decorative panels below windows.
Repair and tooth in brick around 2 2°d floor window openings. Soldier course brick above
windows.
Install 2 limestone sills.
Tuckpoint existing face brick-
Chemically clean and water wash brick to remove old paint.
Install 2 "Survivor"thermopane double hung windows with white trim and grills.
Insulate area around windows.
Remove/Fill in north entrance door.
Install new exterior door, flush outswing with 3 lights, commercial grade with locks.
s
Trim exterior of door with 1x6 cedar.
Install glass transom above door. -
Install metal wall cap with drip edge to overlap brick wall.
Concrete:
Install new front stoop —3'6 x 7' x 6" thick
Painting:
Prime brick with Thoroseal primer, finish paint with Thoroseal.
Paint window trim.
Electrical:
Install 5 wall mounted down lights controlled by photocen.
Install 3 wall wash exterior lights at top of wall to light face of building.
Awning:
Install new vinyl/fabric fixed awning in black roloz.
Signa '
Corporate logo and business name mounted to front of building. (allowance$1000.)
Price: s49,100. (Forty-Nine Thousand One Hundred)
Terms: S 5,000. Upon acceptance of proposal
15,000. Upon start of brick work
20,000. Upon start of carpentry work
Balance Upon completion
All material is guaranteed to be as specified, and all work shall be completed in a
professional workmanlike manner. All agreements contingent upon accidents, strikes or
delays beyond our control. Owner to carry fire and other necessary insurance. Our
workers are covered by Workman's Compensation and Liability Insurance.
Respectfully submitted,
ACCEPTANCE:
The above conditions and terms are hereby accepted:
SIGNATURE
PROARC CONSTR UCTION SER P7CES
1229 East Algonquin Road
Unit B
Arlington Heights. IL
6000
TO: William Vincent July 26,1999
VTS Inc.
PO Box 971
Elgin.IL
PROJECT: Building Facade Renovation
7ch South State Street
Elgin,IL
Proarc Construction Services proposes to furnish all necessary equipment and perform all labor
necessary to complete the following work:
WORK DESCRIPTION
As per plans titled VTS inc. Office Building Remodel,two pages,dated 7/6/99.
1. Windows and Doors as per plan.
2. Brick work as per plan.
3. Awning as per plan.
4. Electrical as per plan.
5. Concrete as per plan.
6. East Elevation,deck and stairs as per plan.
All the above work to be completed in a substantial and workmanlike manner for the sum of:
FIFTY-FIVE THOUSAND NINE HUNDRED AND 00/100. $55,900.00
Any alteration or deviation from the plans and specifications will be executed only upon written orders for same and will be
added to or deducted&orn the sum quoted in this contract.au additional agreements must be in writing.
PAYMENT TERMS
510,000.00 due upon acceptance of this proposal.Monthly payments base on work performed accompanied by proper
documentation as described in writing by the owner or the owner's representative.
Respectfully submitted,
Dominic Rossi
ACCEPTANCE
You are hereby authorized to furnished all equipment and labor required to complete the work described in the above
proposal,for the undersigned agrees to pay the amount stated in the said proposal and according to the terns thereof.
date signature
C
Vfs.
"NVESTIGATORS
R O.Box 971 • Elgin,Illinois 60121 • (847)888-4464 • Fax: (847)888-8588
Chicago(312)553-4464•Wheaton(630)682-8000
Sycamore(815)895-7070
Outside Illinois,call(800)538-4464
E-mail vtsinc @ix.netcom.com
Mr. Ray Moller 7/26/99
Building Services Manager
City of Elgin
Elgin,Ill
Mr. Moller,
As per your instructions, enclosed please find two copies of building plans and -
contractors proposals for the facade renovation of the property known as 7. South
State Street,Elgin, ]L. If you have any questions or comments please contact me
• (847) 888-4464.Thank you for all your assistance during the design of this project
Sincerely;
William E. Vincent
New Brick Soldier Lours-
New Window
New Limestone Sill
Tuck Point & Paint Existing Face Brick
New Window
I
iNew Fiberglass Awil-Ing
i •
I
I
i
New Steel Door w/Glass Lite
�1/T Remove Stone on l..ower Half of Building
and-Replace with Brick to Match the Upj
Half of Building
New Concrete Stel)
t
i
I
�'O n -
FIRST
ELOE]R 5TA[R & LANDING PLAN 5ECOND FL OOR STAIR & LANDING PLAN _
Existing Brick Arch
— ---- — New Window 513UTH 51
I New Steel our
Tuck Poiul
New Umcstooe Sill
Existing Itr,
Existing Brick Arch
New Wind
New Steel Dour
i
EAST ELEVATION WITH 5TAIR5 EAST ELEVATION WITHOUT STAIRS