Loading...
HomeMy WebLinkAbout99-133 Resolution No. 99-133 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH MARTAM CONSTRUCTION, INC. FOR REPAIRS AT THE HEMMENS AUDITORIUM WHEREAS, the City of Elgin has heretofore entered into a contract with Martam Construction, Inc. for exterior repairs at the Hemmens Auditorium; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Ed Schock Ed Schock, Mayor Presented: April 28, 1999 Adopted: April 28, 1999 Omnibus Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk e w CHANGE ORDER This Change Order made and entered into this 7i/c-day of f , 1999, by and between C the City of Elgin, an Illinois municipal corporation, and Martam Construction, Inc., an Illinois corporation, as follows: CONTRACT PROJECT: PAVING RETROFIT--HEMMENS AUDITORIUM PROJECT NO. 349501 CHANGE ORDER NO. 1 The circumstances said to necessitate the change of performance were not reasonably foreseeable at the time the contract was signed, the changes remain to the original contract as signed, and the change order as herein provided is in the best interests of the city and authorized by law. SCOPE: Add additional area to the North of the Hemmens Building REASONS FOR CHANGE: Design changes and value engineering has reduced the total cost for the project from the original Bid Price for the base and the alternate area by more than $30,000 making the project more feasible. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: ITEM DEDUCT ADD Delete Waterproof Membrane ($6,700) Leave Existing drain in Place ($1,200) Set Pavers on Tabs instead of Pedestal ($4,500) Add Under Slab Drainage $2,900 Jack Stairs&Reset Pavers $8,500 Alternate Area(North Side) Base Price(As Bid) $126,834 (Deducts from Alternate Area) Delete waterproof Membrane ($6,800) Delete Border Curbing ($6,400) Delete Concrete Bollards ($3,800) Leave Existing Concrete Base ($2,400) Set Pavers on Tabs in lieu of Pedestal ($4,390) Eliminate Mulch&Planting ($5,800) (Total Alternate Area with all items $97,244) TOTAL AMOUNT OF CHANGE ORDER# 1 $96,244 Original Contract Price $136,212 New Contract Amount $232,456 CHANGE ORDER NO.1 '. . April 19, 1999 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of ,1990. Recommended: BUILDING MAINTENANCE DEPARTMENT y-. By: 67A--7( Date: 1///9/7" Accepted: Party of the Second Part (Contractor) 014 e „ Title: if'o yec /4.-74,,se/- Date: `1(� Approved: CITY OF ELGIN Party • the First Part Owner) B 1 , f Title: 4y /p-9 Date: 1/7/ 7