HomeMy WebLinkAbout98-84 Resolution No. 98-84
RESOLUTION
ADOPTING THE CITY OF ELGIN PUBLIC WORKS NEEDS ASSESSMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that it hereby adopts the City of Elgin Public Works
Needs Assessment prepared by Rust Environment & Infrastructure
and dated March 20, 1998, a copy of which is attached hereto.
s/ Kevin Kelly
Kevin Kelly, Mayor
Presented: April 8, 1998
Adopted: April 8, 1998
Omnibus Vote: Yeas 7 Nays 0
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
i
CITY OF ELGIN PUBLIC WORKS NEEDS
ASSESSMENT
PRESENTATION SUMMA1 Y
MAYOR and MEMBERS of CITY COUNCIL
Kevin Kelly, Mayor
Terry L. Gavin
Robert Gilliam
' John McKevitt, Jr.
Ed Schock
John Walters
Marie Yearman
' Joyce A. Parker, City Manager'
Robert O. Malm, Assistant Manager
t
March 20, 1998
' Rust Environment& Infrastructure
1
I
AGENDA
• PURPOSE OF STUDY
• REVIEW EXISTING FACILITIES
1 • REVIEW PROPOSED USE OF SEIGLE PROPERTY
• POPULATION PROJECTIONS
• COMMUNITY ISSUE
• SPACE NEEDS PROJECTION
• DESIGN CRITERIA
• SCHEMES
• RECOMMENDATIONS
1 • EXECUTIVE SUMMARY
(Attachment from Report)
i
1
1
1
1
1
1
1
r
r
PURPOSE OF STUDY
r • Impact of the potential sale of existing public works property,
south of Ann Street, for library expansion space.
• Impact of the potential use of the Seigle Property located
north of Elgin Salvage, for additional site area.
• Population Growth
Projected staff level
Operational adjacencies
• Program space recommendations for the Public Works
Department for the next 15 to 20 years.
• Comparisons of various Master Plan recommendations to a
new facility, including a new garage, at a new location.
• Increase utilization of staff productivity and efficiency.
• Compatibility of the Public Works facilities to neighborhoods.
• Provide an orderly phasing plan and construction sequence for
the implementation of the Master Plan recommendations that
minimizes the disruption of operations.
C
C
r
r
C
C
f
f
EXISTING FACILITIES
r
• 35 Ann Street
Site
Main Garage
Engineering Building
Covered Metal Storage Building
Yard Structures
Salt Dome
Gravel Storage
a. Material Bins
• Municipal Garage
p
Site
Building
• Findings
35 Ann Street
Majority of structures in poor condition
Building systems at the end of service life
Space inadequate causing congestion and operational
inefficiencies
Updating required to meet current code
Municipal Garage
Structure requires repair
Building systems at the end of service life
Updating required to meet current code
Inefficient layout
Poor site location
I
I
r \-►-rte= .,
- __
• R .' �Cl�T
61
zr
L.r r # 4p ....., .
j _ ; �"
..
I \ ...0, 1016‘ '
fy
I/ 1
1 _ *_
'11-11111 — 11e
viagf
� _
s
1 ----�
11114‘- '4---
"" 'r ,
ii
- 4 r - A
• 4`" :\1* )-t -
lir . i it
Main Garage Heated Vehicle Storage-Looking Southwest From Mezzanine
I
I
I
NO
OM
Ma
MB
r
*: -1
—0 6—1`e 0____ 0_ ___ 4- 0, ,I , 4, ....„.„,., ,r
E , . ...,, , _ .....: ;:::—.77.7.; 1
Engineering Building and Main Garage-Looking East
I
, ,
r;E
E .., ..........
.„. ,
1
r , 1 , .,„ .,_______
.... . .. , _ _ _\`._I__ .....7"...... ...._______.I . _
EMain Garage Shop Area and Heated Vehicle Storage-Looking Southwest
r
I
I
A / . , - .",.., .
� �J _
1.Q •f•0 r
E -
.....,.___ • , - - T :`� j
-I :'
1 .. .
-,-,... „.„,...„.. _ __ ,. ___. .i..,.61.„ .,.:.:,v
•- :::: ,,_:
i. I. . -'• A b,'__,;",. 7 '' it ''T i.1 , ..:1 J'
E . ....,. ... . . . __ _ ... _ • .....
.......... ..,.._ .... , „
..i. .‘,....._.•
. .... . ....--__ ,
.... ,_ . .
_ .......... .._ _ .............
__
Material Bins-Looking South
I
..
_____,_1_,.........
_„...._
,...__�� _
4
la
At
Gravel Storage and Reinert Building -Looking West
C
I
I
, .
I
[ ,f.../ -._ Alibi. • 1
/ :` ,-T..'"."; :7:__••,71.177....:1:1
: -.::
:-- , „ I
....-,
- --------' .. V.1
.. ..... ,
-,‘".. '.,,,.:.....W.ht ,..-, 1/4‘.! \?..)'-.--' . 0--- (5 IV 0-..... 0 '
--
IE _,....,..,.........k.......i.l.....N
•,:,.. .._.•:.f_ „.,... 'ir: _-____-_- :`-----
__. ,____ ____ _
\ -
,--__
!47-r• : ;...e-V•. *.....,
''''' '. 4-',"414,41,,k,.- -• ,m,..;v -
[
Employee Parking - Looking North
C
It
E
.... .i.
•„
104.
_
_
.
...._
__ - , .
., _. ,.:-., : .,•
--- _ . .
...4. . , ... , .
,,...z,,..,..1_, ...;. _,,.1... . _.. _
„._.... -;, . ....._. _ .., ,:_,. . _ _:_. „ „•,•_., __ _ . ____. ,..: . ...__ ___ ______-. _ . ...._,
, . i it
.„, __:,— .1.....-d,.., i.p.
-i !Li e---..,•_ __ _
C
[ Exterior Storage and Salt Dome-Looking West
[
C
[
NW
OW
-
OW
OW I: 1 1',..',,':'1 S•,•f.:..2.''..•..,':.
�; 1 . ��9y 'r 7 -
as -
- r .Y' w ; �y�-l_,....�'1 \ vy iv
r
OW
. ..
1
.„,. -i',.;4, .,
-. . ..
•. . , . ,
_� � 4 tea, st
r ;t1a+rsE" �7 . .iss.Ti8rr7F:a:, li-3.;_ k - l. :;cg..,art & S.yr --F111'...,61, wS" V,�a K`.,,':'.1.
Salt Dome and Yard Storage-Looking North
C
C
C , .., ,._ .,.
�-.
,..,., ,,,.....
.,..tw.„. ,
c ,.
, . ,
. _ ._
, _ . 4•• ,
a' ,-.4.1;,.%:'.'.dCs /i 4 ?, --
`/ .' "dam. -�3 t .°; e�'= a �y �1 --I 1`r Win,- ` :.fr _ Au.: _
,1 ` - � a W
IA
Exterior Storage and Fuel Island- Looking Northeast
I
IC
s
4
— - . 1 - . ' 4 ,
... „ . • _ , _,A
:1 40.
. I 119,,,i,.
•'���� ' il1
'
s � vi hr.„, ....„ ... __ __,::� ImbI o.I I LI, ", :;•,;u `- -
. is''
— —,. i t
1 r
IIMunicipal Garage-Looking West
I
I
IC
II
C
I
I
C
I
11
C
r
SEIGLE PROPERTY
•
• Location
• Area and Shape
East of Railroad Tracks 2.39 Acres
West of Railroad Tracks 3.91 Acres •
s
Total Acres 6.30 Acres
• Previous Environmental Reports
1996 Environmental Subsurface Exploration, TSC,
December 19, 1995
1996 Environmental Subsurface Exploration, ATEC,
May 10, 1996
011 Work Done Underground tanks removed
Monitoring points established
Future work $80,000 - $100,000 clean up costs
•
• • Existing Conditions
Site Regrading in northwest corner
required
Building No. 1 Usable
Building No. 2 Unusable
Building No. 3 Unusable
Building No. 4 Unusable
• Proposed Bike Path
{
•
•
I
CITY OF ELGIN
I PUBLIC WORKS
NEEDS ASSESSMENT
ISEIGLE PROPERTY
I
I
I
GROVE ST. D 0
IE '
or—i CDn CT w
I
1 1 w O I 1 i
I I a EnD 1•
C�] i '
I U 11 L _ i a
e 05, joie,
.....
.....
II
.....
...
.... .
.... .
.... i
1
....
Ii t....... ,. ...." '
1 ,
. ...... ,„.0 .......,
I
Npo i
---
r' i
i B3 i 0
003
I w.4,1 -
— B2 ❑ i
t! M .
t
w.
1 -
1 B4 dt_
'
kr' ' .} yIi .4,w `
1 Z ` .^ y 'fi
I ky.- q gid, ,,,,,a',-%•,.. ' e
F+" 4 i
n 40'ta �,,E,? 9n"`` a < p i *, gs '`§ <# .r,�N ..:,4-,:,,,,,, ,,„:„. `'^A ,..r'„x
-„,-,%-04t.T144,0, 4` # x 3.0 ' t�i�47 rT , <i ,tii ' t ^ *Y.4-y-p
ic{ fA,: . '� .,:,- ...p= ��i- wrut7itiv- ''SG' ',_1,441,p?,,,--,..1;,?..-,7-
_1,41, h ` . ,..9,,07.--t:?,-
if `�� r h
I
a 'r`ses
* 4
'� 41kt -L£ I` ' -,4 y ' h,, t +,tt 1't b y xnv a
I , . a b.. 9 < srM g *,1.,x, „•,._., .raT xf , fit',, ..c ,;(.4.;.;44,Z,..:..,,.,..^.4.4,..
rte.' 4 0 .. �.Sat 3 �'tw ,; �"y. '`< `T k t ),. ..`
� °fir ..3 - f a4 ."rM' F. a ' .1,44‘44,
�a 444.�'ros ":".' —r ,� rti i
�u 4� �,� '��1 ���'��,g�£,t.�y w ��!'., w .n � k dr tit �. x'c��
v ..
ED .
K.
N
Ia', eY 7"4 -_�
yy�� a
I ` ,
I
I
I 1
. :
S
, i
ir
ISeigle Property Y- Building 1 (North Section) Looking Southwest
I
I
I
I
I
I
I
I
I
I
OM
all•l•
/ L. ' - -----------"----------------------
I . 1-----
i
/
i 1
4 ' ---------------.
ao [i M m•• a
7 1; • . lir—lb ' i iiiiirri. hok..aii!.1k-AtoiLiem ,.
. Ai kv-.I • -
1 . - • 1 , i
,----'- -- - ii,
r . .
4 .......... . _ _ . .
Seigle Property- Building 2-Looking South
r
C
C
I
I
tp,• 'J it, • ,:i•• • i, ' , :—
- "4,••,• N7';•• 7 ' 4 ' 1 IP • q I. v ,. ,i ,,
•, '-'',v.',..: .1.', . ' ' '' .N '' " ' ' - r ,
I •:,-,,,, ,r 0 _, •• - •/A - "•4 ,tbit'
, . — ••- ,,, •
. -, , -/.."-=,-, ,,I. -. g•
. _ --,---1 E.,: •
., ,,.„..,
I . .
'747.--7•77- ---77.‘.:•,; •:-,••••••."--..,-7^'- '"•'--;,::::--`,...le --...",_,,,el,...___::::"- '- --- '
atN:,'"-•-- E..4 + '-,„::'.: -.."'-
I
1 .
Seigle Property Building 4-Looking North
I
I
I
POPULATION PROJECTIONS - YEAR 2020
• Elgin Planning Department 142,691
• NIPC 142,648
(Northeastern Illinois Planning Commission)
• Rust E&I 132,280
NI
• 1996 to 2020 67%
IA
MB
MN
OM
I
I
I
I City of Elgin Population Projection
Year 1980 to Year 2020 in 5 Year Increments
1 150000 -
-
1 140000 _
1 130000 -
• 0
O
_ O
O
O
120000 - 0
_• O
E = • O
O
• 110000 - 0
o - 0
C 2 -
a • O
0
o - 0
a- 100000 - 0
CO_ 0
• 0
0
90000 - O O
C - 0
- •aO
0
1 80000 _ 0.p 0
_
70000 -
_ o
0.0
Coo
60000 : 1111 I I I I 1111 IIII 1111 I I I I 1111 1111
80 85 90 95 00 05 10 15 20
1
•Actual •Planning Dept o Exp.Curve Fit
C
C
I
•
•
COMMUNITY ISSUE
•
• ELGIN CENTER CITY MASTER PLAN
Sasaki & Associates 1991
North Fox District
"One of the Center City's front doors, destine to
play an important role in the evolution of the new
Center City."
• The Master Plan recommends that the
predominant disharmonious industrial uses be
relocated.
•
✓
•
•
r
•
•
•
•
•
r
SPACE NEEDS PROJECTION
• Current Needs - 35 Ann Street
i
Site
Existing Area 5.1 Acres
•
Recommended Area 10 Acres
Increase 96%
Vehicle Storage
Indoor Storage Capacity 22,110 GSF
Recommended Area 56,540 GSF
Increase 156%
Covered and Yard Storage
Existing 66,400 GSF
Recommended 177,800 GSF
Increase 168%
• Municipal Garage
or
Existing Building Area 10,870 GSF
Recommended 13,300 GSF
Increase 22%
• Year 2020 Space Needs
•
Population Increase 67%
Far West Area Plan
Low Level Land Consumption
4,696 New Acres
High Level Land Consumption
6,799 New Acres
Minimum Program Increase 100%
r
• Year 2020 + Space Needs
a Revisit Elgin Center City Master Plan
rib 100% to 200% Increase of Year 2000 Space
Recommendations
r
►
t
►
MASTER PLAN DESIGN CRITERIA
• Maximize Use of Existing Facilities
so
• Increase Utilization of Staff Productivity and Efficiency
•
• City Planning Issues
t
Bike Path
rPublic Access to River's Edge
Neighborhood Comparability
r Elgin Center City Master Plan
a
• Site Development
r•
io Improve site security
• Provide Separation of Yard Vehicles from Employee
ow Parking
Building Development
•
Maximize Heated Storage for Diesel Fuel Vehicles
Centralize Shop Facilities
IPromote Shared Space
I • Minimize Development Costs
I • Minimize Impact to Operations During Development
• Flexibility - Prevent Over Building
IMultipurpose Space
Modular Concept
I
I
I
I
I
SCHEMES
✓
• East Side Development
Scheme 1
Scheme 2
Scheme 3
Scheme 6 (Scheme 2 +1)
• West Side Development
.� Scheme 4 (Relocation of Municipal Garage)
Scheme 5a
a
a
a
a
a
a
a
a
a
r
RECOMMENDATIONS
• Current (Year 2000)
Scheme 6 $5,658,000
Advantages
- The year 2000 program requirements are achieved
with little additional cost above scheme 2.
- Maximum advantage of existing facilities
- Seigle Property is reserved for future expansion
- Public access to river
Disadvantages
Vehicle storage is decentralized
- Employee parking is decentralized
- Shared facilities are divided between two buildings
requiring exterior circulation
• Year 2020
Land Cost Included
A) Scheme 6 + Scheme 4 $23,239,000
B) Scheme 6 + Scheme 5A $21,557,730
B) is less by $1,681,270
Exclude Land Cost
A) Scheme 6 + Scheme 4 $22,339,280
B) Scheme 6 + Scheme 5A $20,027,730
B) is less by $2,311,550
Vehicle maintenance upgrade excluded
• Year 2020 +
Revisit Elgin Center City Master Plan
East and West Side Development
Scheme 6 + Scheme 4 + Scheme 5a
West Side Development Only
Scheme 4 + Scheme 5A and 5B
011
How Much of Scheme 6 for $4,470,000?
(1998-2002 Financial Plan, October 24, 1997)
t�*
Scheme 2A Construction Cost 2,327,000
New Heated Storage
New Shops
t Engineering Building Expansion
50% (+/)- of Site Development (2B) $1,210,000
Upgrade Main Garage Allowance $133,000
Project Costs inc. Fee, Furnishings $718,000
Fixed Equipment
Total $4,388,000
Not Included
lw Fuel Island
Emergency Generator
Material Bins
Partial Pavement Replacement
Employee Parking Improvements
C
!e
EXECUTIVE SUMMARY Page i
CExisting Facilities
Elgin Public Works Facilities are located at 35 Ann Street and the Municipal Garage on North Crystal Avenue.
C Both facilities are in poor condition and require upgrading to meet current code requirements. The Municipal
Garage is inefficient in arrangement;contains fuel tanks which are scheduled for removal in 1998 and the ceiling
panels may contain asbestos material.
In
ki On a short term basis,the continued use of the Main Garage and the Municipal Garage is recommended until their
functions are replaced with new facilities. Any upgrading should be focused on complying with current code
requirements.
rBoth facilities have inadequate space for current operations. The following expresses the space deficiency in terms
of current vs. Year 2000 space recommendations.
35 Ann Street Actual Recommended Difference
r Square Feet-Indoor Area 34,950 83,810 (48,860)
Indoor Vehicle Storage Capacity 22,110 56,540 (34,340)
Covered and Yard Storage 66,400 177,800 (1 10,700)
Site Acreage 5.1 10 (4.9)
Municipal Garage
Square Feet -Indoor Area 10,870 13,300 (2,430)
Seigle Property
Use of the recently acquired Seigle Property,274,250 square feet or 6.3 acres,has been proposed as an addition
to the 35 Ann Street Facility. The acreage is as follows:
Total Acreage Usable Acreage(1) Recommended
East of Tracks 2.39 1.92 0
West of Tracks 3.91 1.97 1.97(2)
Total Area 6.30 3.89 1.97(2)
(1) Usable acreage is net acreage resulting from deducting zoning setback area.
(2) Hazardous waste conditions may exist requiring additional environmental mitigation.
The use of the property east of the tracks is not recommended due to its impingement on the surrounding residential
environment and the need to access the property by crossing the proposed bike path to be located in the abandoned
railroad right of way. The west portion of the properties usable area is determined by the zoning setback
• requirements and the 140-foot set back from the Fox River for flood control. In addition,there may be unresolved
environmental issues associated with the property that will have cost considerations not fully identified as of this
date. The buildings are in poor condition. Demolition of all structures is recommended except for the south
C structure. The south structure is adjacent to Elgin Salvage and subsurface migration of contaminates under the
structure may be an issue for future construction in this area.
City of Elgin Public Works Needs Assessment March 20, 1998
r
r
EXECUTIVE SUMMARY Page ii
Population Projection
op
Both the Elgin Planning Department and the Northeastern Planning Commission project a 71%increase by the year
2020,resulting in a total population of 142,500. The majority of growth is predicted to be west of the Fox River
in an area defined by the Far West Area Plan,prepared by the Elgin Planning Department,August 14. 1996.
l>.
Community Issue
The issue before the Elgin Community,with regards to updating and expanding the Public Works Department,is
the use of the land adjacent to the river's east edge. The Elgin Center City Master Plan, prepared by Sasaki
Associates in 1991 and adopted as an ordinance, recommends a preferred land use for this area which is not
supported by the current location of the Public Works Department or the proposed use of the Seigle Property. The
report identifies this area falling in the"North Fox District"as one of the Center City's front doors,destine to play
an important role in the evolution of the new Center City and suggests that the predominant disharmonious
industrial uses be relocated.
The issue of where to invest additional resources for improvement and expansion of the
Public Works Department,in the light of the Center City Plan recommendations,must
first be resolved by the community before a Master Plan frame work for future
development can be established.
Space Needs Projection
The space needs of the Public Works Department are driven by the number of vehicles required to serve the
community. Personnel are required to operate vehicles,which in turn requires support facilities. The approach
to programming is to store the majority of service vehicles in indoor heated space. Inside heated storage reduces
dispatch time,maintenance and operational costs and extends the life of the vehicles. Indoor heated space,+1-55
degree's F.,is critical for cold weather operation of diesel fueled equipment. Currently, approximately 55%of
diesel powered equipment is stored in indoor heated space. The minimum goal is to increase diesel vehicle indoor
storage to 100%. Indoor storage for gasoline powered equipment, less critical than storage of diesel power
equipment, is also recommended.
A program, Year 2000 Space Needs Recommendations, describing recommended square footage for current
operations,has been prepared. This program square footage is multiplied by a factor from 2 to 3 to correspond
to the estimated future needs of the Elgin community.
1101
City of Elgin Public Works Needs Assessment March 20, 1998
I
EXECUTIVE SUMMARY Page iii
Schemes
Six schemes have been developed, some with an initial phase followed by expansion phase. The number of
schemes represents the various scenarios of which side of the river to build on, and reflects various population
densities. The goal of scheme development is three fold:
Maximize the use of current resources where possible to reduce costs.
Prevent overbuilding.
Provide flexibility to accommodate "change as we go adjustments" while maintaining
uninterrupted operations.
Schemes 1, 2 and 3, develop east side property and schemes 4, and 5 develop west side property. Scheme 6
reflects the defeat of the library referendum. Future program requirements are not met by one scheme,but rather
a combination of schemes,each supporting one another. Flexibility and incremental expansions are emphasized.
Through the various combination of schemes,different scenarios are developed representing both sides of the issue
of which side of the river should be used for future development and to the amount of expansion space that will
be provided.
The following chart summarizes the schemes by east and west development with gross square feet,land coverage,
vehicle spaces accommodated and an order of magnitude cost comparison. A 15%contingency is included in the
construction cost estimate. Project costs are estimated by including,in addition to construction costs,other cost
anticipated for total project development. All costs are expressed in the year 2000 dollars. Development beyond
this date must include an appropriate amount for cost escalation.
C
C
City of Elgin Public Works Needs Assessment March 20, 1998
r
EXECUTIVE SUMMARY Page iv
SCHEME SUMMARY
EAST SIDE DEVELOPMENT
scheme Description Gross Acres Heated Total Construction
Sq. Ft. Spaces Spaces Cost
Initial development for 5 year plan. Relocation of Material
1 Storage for Library Expansion and development of new Fuel
Island area.
1A Phase 1 Relocate Material Storage. 57,900 5.11 37 70 $203,000
1 B Phase 2 Develop Fuel Island,improve utilities $981,000
rTotal Area and Est.Construction Cost 57,900 5.11 37 701 $1,184,000
Project Costs inc.Fee, Furnishings and Equipment $177,600
Land Costs $0
Estimated Project Costs $1,361,600
Construction of a new vehicle storage structure attached to
2 Engineering Building. Existing Main Garage area relocated
by library expansion
F
2A Phase 1 Construction of Vehicle Storage 57,900 $2,372,200
r 2B Phase 2 Site development 3.60 40 54 $2,415,000
Total Area and Est.Construction Cost 57,900 3.60 40 54 $4,787,200
Project Costs inc. Fee, Furnishings and Equipment $718,080
Land Costs $0
Estimated Project Costs $5,505,280
Maximum use of 35 Ann Street Site and development of
3 Seigle Property to achieve year 2000 space needs including
relocation of Salt Dome.
r 35 Ann Street
Seigle Property 81,440 3.60 82 72 $8,715,900
8,400 1.97 0 18 inc above '
Total Area and Est.Construction Cost 81,440 5.57 82 90 $8,715,900
Project Costs inc. Fee,Furnishings and Equipment $1,307,385
Land Costs(Environmental Mitigation Excluded) $0
Estimated Project Costs $10,023,285
r
Continued use of Main Garage with a new Vehicle Storage
6 structure (Scheme 2A and site development(Scheme 2B)
No upgrade for Main Garage.
1
Scheme 2A+2B 51,145 3.60 40 64 $4,787,200
Existing Main Garage Upgrade 27,925 0.33 22 221 $133,000
Total Area and Est.Construction Cost 51,145' 3.93 62 861 $4,920,200
Project Costs inc.Fee, Furnishings and Equipment $738,030
Land Costs $0
Estimated Project Costs $5,658,230
C
City of Elgin Public Works Needs Assessment March 20,1998
r
EXECUTIVE SUMMARY Page v
SCHEME SUMMARY
WEST SIDE DEVELOPMENT
rScheme Description Gross Acres Heated Total Construction
r
Sq.Ft. Spaces Spaces Cost
Construction of a new facility incorporating the Municipal
4 Garage with centralized administration.Year 2020 program
at 2 times current space needs.
4A Phase 1 -Initial development 144,680 10.00 76 76 $13,898,0001
4B Phase 2-Vehicle Maintenance internal expansion 1 no change no change no change no change $609,0001
r
Total Area and Est.Construction Cost 144,680 10.00 76 761 $14,507,000!
Project Costs inc. Fee, Furnishings and Equipment $2,176,0501
Land Costs $900,000;
Estimated Project Costs $17,583,0501
r
Construction of a new facility in addition to Scheme 4. Year
1 '
5 2020 program at 3 times current space needs. Indoor
! parking for smaller vehicles.
1 �I
5A Phase 1 -Initial development 125,000 17.00 96 96 $11,871,5001
r 58 Phase 2-Expansion 98,070 no change 83 83 $9,697,1001
Total Area and Est.Construction Cost 125,000 17.00 96 96 $21,568,600
Project Costs inc.Fee,Furnishings and Equipment $3,235,290
Land Costs $1,530,000
Estimated Project Costs $26,333,890
Notes Regarding Order of Magnitude Conceptual Cost Estimate
1 Estimated construction cost for order of magnitude for scheme comparison.
r 2 1997 west side land costs estimated at$90,000 per acre.
3 Cost expressed in year 2000 dollars. Escalation beyond year 2000 not included.
4 Construction costs include a 15%contingency.
5 A competitive bid situation has been assumed with a minimum of five responsive bids being received.
Elgin Public Works Needs Assessment March 20, 1998
C
r
EXECUTIVE SUMMARY Page vi
Recommendation
The Gail Borden library expansion referendum was defeated by a vote of 4,553 to 3,767 on November 4, 1997.
The potential expansion of this facility on to existing Public Works property was one of the reasons for facilitating
this report. Relocation of the Main Garage and the Yard Storage Area at the southwestern portion of the site will
not be necessary at this time. Scheme 6 was developed in response to this action and recommends maintaining use
P' of the Main Garage in conjunction with the construction of additional facilities to meet current program space
needs.
Current to 2000 Scheme 6 $5.7 Million
Expand the current facility described in Scheme 2A and 2B in addition to using the
existing Main Garage. This scheme accommodates the current needs of the
department,provides public access to the river and reserves space to the south for
future library expansion. Maximum use is made of existing facilities while new
development enhances operation by providing enclosed heated space for diesel
vehicles and indoor circulation between departmental functions. Use of Seigle
Property should only be made after environmental issues are resolved. Short term
surface storage on the Seigle Property may be required to offset yard storage needs.
111
Future to 2020 East and West Side Development-Scheme 6+Scheme 4 $22.4 Million
(2 x Year 2000 Program)
Scheme 4 constructed on the west side should be developed to accommodate
expansion in addition to Scheme 6 for development on both sides of the river. The
• Municipal Garage functions should be relocated and are included in Scheme 4A and
are expanded in Scheme 4B. This scenario accommodates program space needs
projected to the year 2020.
West Side Development-Scheme 4+Scheme 5A $31.0 Million
(2 x Year 2000 Program)
Scheme 4 and Scheme 5A,represent development on the west side of the river. These
facilities are sufficient to meet Elgin's projected population growth to the year 2020,
if the east side facilities are abandoned. Scheme 5B is included in the study for growth
beyond the year 2020,or if the rate of growth exceeds projections.
Future 2020+ The recommendations contained in the Elgin Center City Plan should be revisited for
the North Fox Distract. If the community has grown to expectations and the riverfront
area importance is a vital ingredient of City development,relocation of the 35 Ann
Street facility should be considered by developing Scheme 5B in addition to Scheme
4 on the west side. The new structures on the 35 Ann Street site can be multi use in
design. Long span structures are adaptable to a variety of space needs compatible with
uses for preferred activities listed in the Center City Plan.
City of Elgin Public Works Needs Assessment March 20, 1998
`� .
�
— City of Elgin
Agenda Item No.
r, M
March 18, 1998
TO: Mayor and Members of the City Council
FROM: Joyce A. Parker, City Manager
SUBJECT: Public Works Facility Needs Assessment Presentation
PURPOSE
The purpose of this memorandum is to provide the Mayor and
members of the City Council with information on the needs
assessment for Public Works facilities prepared by Rust E & I .
BACKGROUND
The 1997 Budget included $70, 000 for a Public Works needs
study. The City Council approved an Engineering Services
Agreement with Rust Environmental & Infrastructures (E & I) on
June 25 , 1997 to perform the evaluation.
The study investigated the immediate needs of the Public Works
Department for the next five years and the long-range needs
for the next 15-20 years . The proposed expansion of the
Library provided an opportunity to incorporate the Library
plans into the study.
The Facility Needs Assessment has documented what is existing
in terms of personnel, equipment and storage space . More
importantly, the needs of Public Works during the next 15-20
years has been projected to determine what space will ulti-
mately be required to accommodate a modern, efficient Public
Works Operation, including necessary future staffing addi-
tions .
Rust has prepared their report which includes several differ-
ent scenarios and cost estimates . Rust will make a presenta-
tion which will provide an overview of the assessment .
Attached is a copy of the Final Report and the Presentation
Summary dated March 20 , 1998 .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
Staff involvement .
Public Works Needs Assessment 'Presentation
March 18, 1998
Page 2
FINANCIAL IMPACT
lk
The contract amount of $63, 485 has been paid from the 1997
Budget in account number 275-0000-791 . 45-99, project number
339560, Public Works Facility.
LEGAL IMPACT
p5None.
ALTERNATIVES
None.
RECOMMENDATION
It is recommended that the City Council con_ider the findings
of the Rust Needs Assessment Report .
Res•ectfu ly submitted,
Jo -- A.
dir ,
City Mana•er
GWM:mg
Attachment
rft.
1
i