HomeMy WebLinkAbout98-298 Resolution No. 98-298 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH DRIESSEN CONSTRUCTION FOR FACILITY IMPROVEMENTS AT THE YWCA WHEREAS, the City of Elgin has heretofore entered into a contract with Driessen Construction Company for the YWCA facility improvement project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: December 16 , 1998 Adopted: December 16, 1998 Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk YWCA Building Rehabilitation Elgin, Illinois Bid Number 98-080 Change Order #2 Purchase Order Number 081203 SCOPE: This change order provides for the removal and disposal of all existing 2 , 3 , and 4 cast iron piping associated with the pool drains . Replace with schedule 40 PVC DWV fittings . Reuse as many hangers as possible, add hangers as necessary. This improvement is associated with building rehabilitation improvements at the YWCA of Elgin located at 220 E. Chicago Street . BASIS FOR CHANGE: Replacement of the supply and return circulating lines for the pool was included in the contract . However, during construction it was discovered that the drain piping for the pool also was deteriorated and requires replacement . FINDINGS: The pool renovations commenced on November 16, 1998 . The pool was closed, drained and work began on the pool systems within the pool tunnel . After construction began, the deteriorated drain piping was discovered. The severe deterioration and replacement of the drain piping was not reasonably foreseeable at the time the contract was signed. The change order is germane to the original contract signed and is in the best interest of the City and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : Replacement of deteriorated drain piping. $11, 367 . 00 The original contract with Driessen Construction Company was for $159, 860 . Previous Change Order #1 added $208 . With the addition of Change Order #2 , the contract amount will be increased by $11, 367 . 00 for a total of $171, 435 . CHANGE IN CONTRACT TIME: No further adjustments to the Contract Times shall be given for work completed under this and previous change orders . ACCEPTANCE: The changes and conditions set forth in this Change Order No. 2 are hereby accepted. All other provisions of the Contract remain unchanged. DRIESSEN CONSTRUCTION COMPANY CITY OF ELGIN (Contr tor) (OwAiik (21;14/1/4, Da e : //17./ /S,' Date : /. //(P/J f `�,�OFESC'_ `, �`" Agenda Item No. , , City of Elgin g rk -4,,,Loo' December 4, 1998 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Proposed Change Order No. 2 for Driessen Construction-YWCA of Elgin CDBG Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider Change Order No. 2 for Driessen Construction on the YWCA facility improvement project . BACKGROUND On September 23 , 1998, the City Council awarded Driessen Construction Company a contract in the amount of $159, 860 to rb' complete the building improvements to the YWCA facility. A major portion of the project involves repair and replacement of deteriorated pool tunnel piping, decking, and conduit systems . Work was initiated on November 16, 1998 . Replacement of the supply and return circulating lines for the pool was included in the project bid. However, during con- struction it was discovered that the drain piping for the pool also has deteriorated and requires replacement (reference attached letter from Sutter Architects) . COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Michael Sutter, Sutter Architects Carol Elias, YWCA Director Driessen Construction Company INANCIAL IMPACT Funding for this proposed change order is available from the YWCA Facility Improvement Project Contingency in account number 230-0000-791 . 93-36 , project number 154406 . The budget for the 1998 YWCA CDBG project (with previous transfers) is $181, 200 . r Change Order No. 2-Driessen Construction December 4 , 1998 Page 2 If the proposed change order is approved, the total amended contract amount with Driessen Construction will be as follows : Original Contract : $159 , 860 . 00 Change Order #1 : 208 . 00 * Change Order #2 : 11, 367 . 00 Total $171, 435 . 00 * Removal of rusted door frame and closure of opening with concrete masonry. Imply LEGAL IMPACT The City Council may authorize change orders to a contract as appropriate to complete project work. ALTERNATIVES None . RECOMMENDATION It is recommended that the City Council authorize execution of Change Order No. 2 in the amount of $11, 367 . 00 and request staff to execute the required change order document . R ectfully submitted, (/ L Jo e A. Parker City Manager VRB/vb SUTTER ARCHITECTS 847 362 3580 P. 02 SUTTER ARCHITECTS 101 EAST PARK AVENUE - SUITE A L.IBERTYVIU,E1 IL 60046 047.388.3600 FAX: 847.358.3580 F,MICHAEL SUTTER. PRESIDENT December 3, 1998 Ms. Veronica Bell Associate Planner City of Elgin 150 Dexter Court Elgin, IL 80120-5555 Re: YWCA of Elgin Dear Ms. Bell: Within the scope of the Grant for this Project was the replacement of the supply and return circulating lines for the pool. As you know, this work is almost finished. Mr. Skelton, of the YWCA, has discovered that the drain piping for the pool also has deteriorated and needs replacement. The contractor, Driessen Construction, has supplied a proposal for the removal and replacement of the drain pipes in the amount of$11,387.00. We would recommend that a change order be issued for the above amount. This will then bring all the pool piping up to current standards. Sincerely, 4,6e, / F. Michael Sutter President FMS/css cc: Mr. Don Skelton, Facility Manager YWCA of Elgin e d-•tects • comer's • snoriccra