Loading...
HomeMy WebLinkAbout98-106 Resolution No. 98-106 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH ILLINOIS HYDRAULIC CONSTRUCTION GROUP FOR THE WALTON ISLAND PATHWAY SYSTEM WHEREAS, the City of Elgin has heretofore entered into a contract with Illinois Hydraulic Construction Group for the Walton Island Pathway System; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be and is hereby authorized and directed to execute Change Order No. 1 , a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: April 22, 1998 Adopted: April 22, 1998 Omnibus Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT No. 507400 CHANGE ORDER No. 1 SCOPE: This Change Order No. 1 will provide for asphalt pathways on the island which were originally planned for inclusion in Walton Island Improvements to be constructed this season. The general contractor for this project is IHC Group, Inc. of Elgin, Illinois. REASON FOR CHANGE: Please see Attachment A for a description and explanation of items contained within this change order. SUMMARY OR CHANGES IN CONTRACT AMOUNT: The amount of this contract will be increased by $35,000.00 from $723,025.00 to $758.025.00. SEE ATTACHMENT A D\WLS IW D CHANGE ORDER No. 1 March 27, 1998 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this ; day of r , 1998. Recommended: ENGINEERING DIVISION By: Title: w 6�? Date: X98 Accepted: IHC GROUP Party of the Second Part (Contractor) By: _ Title: S� + o✓t�cT' /�C-,�Z Date: 4��Jr�90 CITY OF ELGIN Party o First Part (Owner By: 4,�=t J-- Title: A m Date: DNWLTMC01 W➢ GROUP..//JIHC �AcsrlvrrL, N1 EMO T0: City of Elgin ATTN.- Dennis Valentine 847-931-5965 DATE., 02111198 3:0I PIV( SUBJECT. Additional asphalt paving work for Walton Island. project. From Russ Ginn Sr PmiedManager 847 742-1533 ex4 334 az 847-742-6670 We hereby propose to complete the additional 8".granular subbase with 1.5" asphalt binder and 1.5" asphalt surface courses per your request for the unit price of 530.00 per square yard. This pricing is based on being paid for the actual quantity placed in the field, which is estimated at 900 sy. Please contact our office if you have any questions regarding this matter. We look forward to your formal change order. Sincerely, Mc Group, Inc. Russell Ginn, Sr. Project Manager «:r1C ATTACHMENT A Agenda Item No. City of Elgin April 1, 1998 TO: Mayor and Members of the City Council FROM: Joyce A. Parker, City Manager SUBJECT: Change Order No. 1 for Walton Island Pathway System PURPOSE The purpose of the memorandum is to provide the Mayor and members of the City Council with information to consider Change Order No. 1 for the Walton Island Improvement Project. BACKGROUND On August 13, 1997, the City Council awarded to Illinois Hydraulic Construction ( IHC) Group, the Walton Island Improve- ment contract. The project generally consists of shoreline stabilization and installation of prefabricated bridges . Certain construction items were deleted from the original plans including pathways between the bridges, because of budgeting constraints . With the construction extending into the current season and with the full access to the islands for heavy construction equipment in place, it seems reasonable to have IHC complete the pathway construction and eliminate the need for another contractor to mobilize a temporary access to the islands . The new bridges cannot be used to haul asphalt material due to weight limits . IHC submitted a unit cost for the pathway paving equal to $30 . 00 per square yard for additional paving beyond those amounts originally included in the contract. The pathway construction consists of earth excavation, base course and asphalt. The contract unit cost with IHC for paving is $50. 00 per square yard for ramps to the bridges . Comparison with unit costs associated with this year' s general resurfacing programs for similar pavements indicate a unit cost of approximately $26 . 50 per square yard. The difference between $30 . 00 and $26 . 50 can be justified due to the additional handwork required. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED € None. C.O. No. 1, Walton Island April 1, 1998 Page 2 LN FINANCIAL IMPACT Ivy Funds are budgeted for this project in the amount of $108, 000 for landscaping and accessibility (pathways) in the Riverboat Fund Capital Account No. 275-0000-791 . 92-32 , Project No. 507400 . Of the $108, 000 budgeted, $40, 000 has been earmarked for the pathway system, with $68, 000 planned for the landscap- ing improvements . It is estimated that the pathway construction would require approximately 1, 167 square yards of asphalt for a total additional cost of $35, 010 . JEGAL IMPACT one . ALTERNATIVES Do not accept Change Order No. 1 and bid the work. Additional mobilization will be required and the cost will probably exceed $30/S .Y. Accept Change Order No. 1, reduce mobilization costs and allow the work to be completed this spring. RECOMMENDATION It is recommended that City Council authorize Change Order No. 1 in the total amount of $35, 010 and direct staff to execute the necessary documents . . -Respectfully subm' tted, )oyc A. Parker City Manager DV/do Attachments