Loading...
HomeMy WebLinkAbout97-293 Resolution No. 97-293 RESOLUTION ADOPTING A HYDRANT METER POLICY BE I T RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that it hereby adopts a Hydrant Meter Policy dated January 1998 as the City of Elgin' s policy for metering of water use from hydrants , a copy of which is attached. s/ Kevin Kelly Kevin Kelly, Mayor Presented: December 17 , 1997 Adopted: December 17 , 1997 Vote : Yeas 6 Nays 1 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk n CITY OF ELGIN HYDRANT METER POLICY Effective January 1998 Any water obtained from the City of Elgin fire hydrants shall be metered and provided subject to the following: Hydrant meters and accessories shall be obtained through the Meter Shop of the City of Elgin. A deposit shall be required in the form of a certified or cashier' s check; no cash shall be accepted. COSTS: 1 . Meter and accessory deposit: $250 for 1-inch meters, $700 for 3-inch meters, and $40 for hydrant wrenches . In the event the water meter is not returned or is returned damaged, deposits shall be forfeited. 2 . Usage deposit: $200 or one month' s anticipated water usage; whichever is higher. 3 . Water charges : Water usage shall be billed bimonthly on an estimated basis unless actual reads are provided. The water rate is as currently adopted by the Elgin City Council. No sewer fees shall be billed. In addition to usage, the following meter availability charges will be added to the bimonthly bill: 1" 32 . 65/month 3" 163 . 25/month Water bills will be issued until the meter is returned to the City. WATER BILLING/ACCOUNTABILITY: - Hydrant meters shall be returned to the Meter Shop November 1 of each year. The meter shall be read to determine total water usage. The sign out form for hydrant water usage will be completed in its entirety with all relevant information, including the start reading, by all contractors, whether associated with a City contract or not. The completed form and deposits shall be forwarded to the Finance Department. When the meter is returned, the end read shall be taken or estimated if damaged or lost and usage calculated. This information will be forwarded to the Finance Department for final billing. Page 2 If the water usage is associated with a City contract, the contractor shall be billed for the water usage unless the charge for water is waived in writing by the director of water operations . A hydrant meter deposit shall be required in all instances . 25021007 . 194 (policy2 )