Loading...
HomeMy WebLinkAbout97-169 Resolution No. 97-169 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH FULTON CONTRACTING FOR THE OUTER RING STREET LIGHT PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Fulton Contracting for the Outer Ring Street Light project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Robert O. Malm, Interim City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: June 25, 1997 Adopted: June 25, 1997 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT # 339549 CHANGE ORDER NO.1 SCOPE: This Change Order No. 1 will provide for the addition of five additional street lights to the 1996 Outer Ring Street Light Project. REASONS FOR CHANGE: This Change Order No. 1 will add quantities to the existing contract for Outer Ring Street Lights. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: LOCATION VALUE 1) One new street light pole and 250 watt Metal Halide light fixture to be installed at the Douglas Avenue and North Street municipal parking lot. $3,375.00 2) One new street light pole and 250 watt Metal Halide light fixture to be installed in the center island located in Mulberry Court. There is no existing light at this location. $3,150.00 3) Replace nine existing street light fixtures with new 250 watt Metal Halide light fixtures on the existing street light poles, three on Waverly Drive from Waverly Court to Joslyn Drive and six on Poplar Creek Drive from Bode Road to East Chicago Street at a cost of$325.00 each. $2,925.00 TOTAL = $9,450.00 The original contract with Fulton Contracting is $17,050.00. By reason of Change Order No. 1 , the contract for the 1996 Outer Ring Street Light Project will be increased in the amount of nine thousand four hundred fifty and 001100 dollars ($9,450.00). The new contract amount, inclusive of Change Order No. 1 is twenty six thousand five hundred and 001100 dollars ($26,500.00). CHANGE ORDER NO.1 June 7, 1997 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this1_day of ,1997. Recommended: TRAFFIC-DIVISION OF PUBLIC WORKS 'La tires. /�e%U/ By: Q� Date:(;'1�l l Accepted: FULTON CONTRACTING Party of the Second Part (Contractor) By: D�` /�? ` Title: /�- Date: ‘—/6''" 77 Approved: CITY OF ELGIN P. e . o the irst Part (Owner) • / By: Title: _t.I7-1-.r-i•rt a y Date: (`/ .7/q OI�I I�' of I ff Y L Summit St--t t--Rt. 58 1 I 0 WATER ST 8 1 r m T C/ Y > O o p NORTH ST C.7 >. 1 Appellate to y New Site of Carl ��� o r court 4. Police Facility ¢ GAve. n �o, ys� �ood--Dr-- Police Police Opening 7/96 % Apr a N CcNMcanIer Deft. Z Shiloh. Plaza r DEXTER AVE C _ L I i c9Y+ood-- CitY Hal r.-1 .1 ' YO`t 9y F `1 0 Mulford Shiloh % e,, �py�c _tinter—Cc G p ` ] 8 .ioN sr Ct � Hecker-Dr s L,,,:!...,6 7 �i ,\.\ , <-- HIGHLAND �0C' � Z(3orde\,G° Joslyn (� V ` A N•Dr.- •wage—el / CDr.6, PROJECT LOCATIONS 2 d• P6.1�g_ Dr�q_. \EF_D• ^ .huYUDr. o ctigbuti 3 BodeI i Rd. c ., • dp Q 4 2 CARR ST. q 0 ERIE ST, O W >, ERIE ST. b j C GGR�GN o Iii...., Q �� o W s t o ,,- MEYER ST. MEYER ST. MULBERRY IN. cc► L/C L IAN ST. [111-4 r5 '90 IN. eO SOUTH sr weep PD #3/ N PROJECT LOCATIONS L OC' o\ J ›, vc`� r o 0.1 `�`°'rb > \ o 3 Bode Rd. off\ f ij:��o�`°o I` /8-). 16 C. 4:4 octo: n"--Dr.---1Ash• Dr. , v a ' � •ckber .� Brrc 1.Dr r ' m a, Rosewood AL° —Ct.--1 \ 0., pruce• Ln. ,� o 1,9/ Nemloc}� G�F-.CjJ\ Ch/�o9 o p Hernbck Ln, OQ�PFI o . 0 4��` ;� Ple.ln. Q ' Peo 1 3 yew.1 Tree hLn. Ct.. \Peach Ct. Tree 3 Sa' MEMORIAL FIELD cc<QS`'I �Rt. 19) • C°pC Z-91/ Of E6Ci °G ~� City of Elgin Agenda Item No. ISI-` (j F If[U[cQ'• June 5 , 1997 TO: Mayor and Members of the City Council FROM: Robert O. Malm, Interim City Manager SUBJECT: Change Order No. 1 for Fulton Contracting 1996 Outer Ring Street Light Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider Change Order No. 1 for the subject project . BACKGROUND The City Council , at its February 12 , 1997 meeting, awarded to Fulton Contracting the contract for the 1996 Outer Ring Street Light Project. The contract provides for the installa- tion of five new street light poles and fourteen street light fixtures on new and existing street light poles for areas that cannot be served through our agreements with Common- wealth Edison. The proposed Change Order No. 1 will expand the scope of the project to include the installation of eleven additional street lights to the original contract. After execution of the subject contract, these eleven locations for additional street lights were identified. The locations are as shown on the attached location maps and within the attached change order document. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT Funding for this project is available in the Major Re- pairs/Public Ways Fund, Account Number 275-0000-791 . 93-70, project number 339549 . The cost to do this work is $9 , 450 . The amended contract amount with Fulton Contracting for the Outer Ring Street Light Project will be in the amount of $26 ,500 as follows : Original Contract $17 , 050 Change Order No. 1 9 ,450 Total $26 , 500 Change Order No. 1/1996 Outer Ring Street Light Project June 5, 1997 Page 2 , The 1997 Outer Ring Street Light Program is currently under development. Locations have been identified. Easements will be required to complete the installations . Our schedule will be dependant on obtaining the required easements . LEGAL IMPACT 4 None. ALTERNATIVES None. RECOMMENDATION It is recommended that the City Council authorize execution of Change Order No. 1 in the amount of $9 , 450 and direct staff to execute the required change order document . Respectfully submitted, • David L. Lawry, . Director of Public Works i b/ Ro •ert O. Malm Interim City Manager CGP:mg Attachment W 16- t Summit St--I I---Rt. 58 --I 1— t� gI gO WATER ST , LI x O NORTH ST (1 >. r Appellate New site of i C0� �`� y ood . r,._ Court Police Facility Q CAve. n fid' S o� Police Opening 7/96 /5. `Or , o, _ I Det.) i Shiloh�c' 1p '� Qcgwood— 0210 O Plaza Como DEXTER AVE �.t CT.. / Ckylial _ w O 7.7;7;1 Mulford S h `P� os/1 ,enter=6c ` 1- Shiloh 1— Gr -;j IN •ION ST... .,?, 0> Ct.� Hecker-Dc�/. ? • e— HIGHuwDA Qc' '\./'B°rde\,GI 2 ° ....... ....., -2r (...._.. \. l.J Joslyn 8 .0 •PROJECT LOCATIONS 2JiLj1ji' P 6,.�9• Dr. orbury-- Dt - rZ� V U V c �J h bury—Dc. ( Bode II Rd. c ` . d0 Q 0 z / /__.] CARR ST. o 0 ERIE ST, 4, Z O ERIE ST. W �, v • 2 4_ _ • z `I 60RD°" o' - CT " W -A-- 0 . MEYER ST. MEYER ST. • MULBERRY IN. r — cr LILLIAN ST. v Q v ------------ -------&...........„ 11-#396, 9iN by. .Pr 2p SDUTN ST 4✓ SPD, X31 • A PROJECT LOCATIONS 8 c Q N J Off. t. lti y� ` c E / 3 °I n _1( N 1 LB0 >\Rd. ' *JL i t :41 I4 et: �Dr—I Ash•Dr. , �c� Brro7.pr. Gt. (Sic / Zi , \ 7. pruce• Ln. ,L o to Hemlock G' -�E ` Chic U iHembck CU QIP• °90 . S v 4`� .„„i, P/e-Ln, QO 1, o° 47 Peoch J Yew' 4 .Tree•Ln. Ct. Pt d, Tree 3 Sc, MEMORIAL FIELD Fzi % Rt. 19) Gopt. 2 961