Loading...
HomeMy WebLinkAbout96-170 Resolution No. 96-170 RESOLUTION APPROVING CHANGE ORDER NO 1 IN THE CONTRACT WITH MICHELS PIPELINE CONSTRUCTION, INC. FOR THE SANITARY SEWER SYSTEM IMPROVEMENTS FOR THE NORTHWEST INTERCEPTOR SEWER WHEREAS, the City of Elgin has heretofore entered into a contract with Michels Pipeline Construction, Inc. for the sanitary sewer systems improvements for the Northwest Interceptor Sewer; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Kevin Kelly, Mayor, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: June 12 , 1996 Adopted: June 12, 1996 Omnibus Vote: Yeas 6 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk CHANGE ORDER NO. 1 REVISED 3/7/96 PROJECT: Sanitary Sewer System Improvements DATE OF ISSUANCE: 2/08/96 Northwest Interceptor Sewer OWNER: City of Elgin ENGINEER: Baxter & Woodman, Inc. CONTRACTOR: Michels Pipeline ENGINEER' s Project No. 930471/ Construction, Inc. 930248 You are directed to make the following changes in the Contract Documents : DESCRIPTION: The Contractor shall delete manhole Nos. 4, 6, and 11 from the project. The sanitary sewer in these areas will be constructed in tunnels constructed from manhole Nos . 3 to 5, 5 to 7, and 10 to 12 . As a result of these changes the Contractor will be allowed an adjustment in their unit prices for 48-inch PCPP tunnel excavation and pipe installation and grouting (Item No. 1 ) to compensate them for the increased costs for the longer runs between manhole shafts . All parties have mutually agreed to the following provisions as part of this change order: 1. The soil investigation completed by Michels Pipeline Construction, Inc. between Manhole Nos . 5 to 7 provides additional information of the soil and groundwater conditions along the revised route. The soil investigation results shall be submitted to the Owner and • Engineer and made part of the Contract Documents. 2 . The testing requirements for the sanitary sewer outlined in the specifications will be adhered to. 3 . The quantities for work completed will be measured in accordance with the specifications for this project. 4. Additional soil borings will be made by Michels Pipeline Construction, Inc. along the sewer route between Manhole Nos . 10-12 . The soil boring results shall be submitted to the Owner and Engineer and made part of the Contract Documents . 5 . Michels Pipeline Construction, Inc. agrees the change of the sewer route does not constitute a differing site condition. • PURPOSE OF CHANGE ORDER: Change in Contract Price. ATTACHMENTS: Baxter & Woodman, Inc. job memorandum dated January 23, 1996, with enclosures including Michels Pipeline worksheet received September 20, 1995 . CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price: $ 4, 089, 359. 50 Original Contract Time: Substantial Completion: 7/1/96 Completion: 8/28/96 Previous Change Orders No. - to No. - $ 0 . 00 Change from previous Change Orders : None Current Contract Price: $ 4, 089, 359 . 50 Current Contract Time: Substantial Completion: 7/1/96 Completion: 8/28/96 CHANGE ORDER NO. 1 2 . Net decrease of this Change Order: $ 225, 069. 00 Net increase/decrease of this Change Order: None Contract Price with this Change Order: $ 3 , 864 ,290.50 Contract Time with this Change Order: Substantial Completion: 7/1/96 Completion: 8/28/96 Pursuant to Public Act 85-1295, the circumstances which necessitate this Change Order were not reasonably foreseeable at the time the Contract was signed, were not within the contemplation of the Contract as signed, and are in the best interest of the City. RECOMMENDED: RECOMMENDED: ACCEPTED: ENGINEERING DIVISION BAXTER & WOODMAN, INC. CITY OF ELGIN MICHELS PIPELINE / CONSTRUCTION, INC. Bc)-11) �,4,/ ij B 131724/4- /�� D. R. Gavle David Lawry, P. . William R. Weltin Client Manager Vice President APPROVED: CITY OF ELGIN By Kevin Kelly, M.—or 930471\changeor\co#1.wbs U YS i L. ` 1 --t:I"4 j 1 1 —1. (+ ;1r1S a"s -) -Sq 81 1 y as‘ra� ("Fa'IS rA5 ")S) , SLG t cso'c 0 ,Ald C ,• . f � � r amu- (1 (.)110r _.(s,pr2.‘.) clo .� , 1-1,1-3 _( A , ,n r),..,0-1 \oi Ji° 1"1"1"0 5 as `4s 9 noS �L f x L,�„a, ° j� s trb a0 Lt��3 � �l / � ( ..,,cr _te,i.7N r,,,, i) 7 s7 ,2 e 'S S-k (/ , 0-A 7 `r3�� it = -*(T 4, )c °y',-, "`-a (7,,,,..f. ).° :in sc:fr p, s-,,/ ny,u 3tiv+ v„ 7 " ti -/..{' I -f'a C-,, .r-)vt 1 --a‘k. 10 -- -c--..,9D-;9 /0 .4 7 „ , , (,. ,6, 7,-,, --y----) V:014,-,1v-1-,7C-- 1•2•1`vtvq_ ,,,,i I 969 LO/ 0 rr-9 N- o.4.0 -)c-n _L--)?vis- 1 In_rn cv-p, 1.-J C.Ai s n ,.--7 -,---,” E} 1 -) -U-11 '1-/- C+ c e c c\(, ?.J Al ../c 0"1.n p-) I Li, C 10 0 7 `1\,6 L/?,,";:j 4 ) 1./Di. .,,.i.li eN 1-l 3 Imo,., PLII-N KEV15ED at-4,1,7 ov.:.4- pA,.., .-1-), Ii.dt 0.........w)-i 0,: kp,„ rN1,-1 . 48" g-c.PP (Tw.,...I' �.,c,... 0;\ 443s t-F 304.00 /,.358 210 11435 t-F 4 32_,S .00 l 4s4 Geo Cr rawh.; 44.35 UP 191. 00 84-7 O ' 4435 LF $153.00 eSS 9S ,oO >. T...e.,1 5I-C-4- -310 .1 p 2100 , 00 &57, ooJ - - -7. San;}7,iM (� I �!^n .aye, j 72-1 r.c,t, -) Le`i 01„1 Z 6t /0 600 .o0 2),200 4/0 6do.0) T a. 06 — 12- Ib �� � 2 F_A /2, 5�• 00- — 2s,000 3 /2,503.00 '237 soo 40 - 41- 1- dice 2- CA' 2s, 000 . of S0 000 4 4 ' I IA Svoo. `x 2s, v a. 0 i 14 0Ooo. JJ 2 27 7, t�JJ 0 � L7 00).0,1 4 O. C7i} 11 le, ,ea,wi Lir., cto.-1, 530 Le- 2D . 60 ' /D 000 — O 4 iv, 00 D , c�a 3. Cr–r4 ()&4 1,_., la I- C,c(..�Ja)10" 1500 0i 15 .bo 22_, 00 ' 0 '$/5,00 0. l)0 , G1-6-J-\ soJ To�� (v.LS 3), 2So -- o 6,2S a J a SU.6-16-1-A- 3 033 g7S D 2236 5"4-0 El, 2 919 3ss ' 1 .., • 0..5 (, 'A 4- , /074) i1 ci II I.),.„:„. 7/.1 ?‘ 00 c-:, a).i) ty 1 \ 1 C '56,C fi 1 AI ------- - -7-C-i--6 . 0 4 11 •• 1 • C, ' ri; ii2A 1Z ,...*)1• f it, '.7?•"‘,/ 4?. p', aVti v/I°67C°J5r P . 1 ....------ .....----7---- 1 \ 00175) .,6414:4""f..rireb ....... ........"....". 6..41".11it i1 1 i 0 I 2 P C ' \ •s7-01,j-11,,v 64 \ 31:1:!!!!tn 1170 1,71 -,- \ oo9/50Z :c•gif-r--/-lerr- 1, 0/- // t „.. .,..,. ,..., a 0 .....c.c .aer ._ ...4,„7.2.........) . , 1 .. \ 3 0" /Z X ,, /Cir 2 A \ ..... , \ COS4P6 _ ' cl.. . - • no/ ;‹ . r,--• 1 . ; __ — ________________ .1 ___ _-----, I( j /. 'L) 7 2/(' 7. ') \. , (2c) c• - \ .., . • • P C<.0Coco iii :,CSO r.cc /r. :gym t,. Cor) i r�✓ 7/ i' ' Q / i 78 "1.0 ) _�'r� �a • 1.• '�JJ�) �� (1 i r. 71GG fr /A7p0601 1 ... ........ ... .._._...________-- , 1 • 1 . 1 1 \.:,,0 s-ti nfi- -1--firr i'' • . ---------- . _ „.:-?3.y•-ce 2a/0 :791/ ',Aft . . A -_,52 0 Z 7r- 1)) ? -7.2rf y lic; •cy..,ii iii .., 7.5i-/ '2 -:;‘,2 Ai 27.}.v r-''-' i 7 7 . v/ 4., , . . . LA9f• -..-r=2-a•Z--4`1 $ 1 . 1 . 11 ) Ii _ ,_ __ _ , 0...--7 7 . a „ 1 ) i 1 : . (,0 6, -i• , V'•x.A7 -1-• , ,'' - .. Z Z — 7 6 / , '. / / ,, Z L — • . ,, ( 77.) 7 c)1, (v .. it ,..--,7 2,v 1, LC/ 73 ' iis # c.L7i$ .-- •— ... ...... . I/, ...•••PR l'i' il 1 ::-..-.,_•,, ,.„ . 1Iff.f:. ....‘-' '- ' Z l ^Z - l, I I I • , . .:. Z.14..5........7...7..... ..........1 - ,4 4. . ' .. 0 • i ?7,..... 4..:.-9.....,-.-•,- __ / ,-.-•.11"5' Z / 7i, - 0 , 17 1 — 2 # \ _ .,.../...-1, ' _ ,v-rs.z/ ‘,' , c7".. 7' , '7. - r # J ! , •!,—1 i lit!5 .7,-2.. ( 7 -- •, . . --1 . i -7/ r.–r' D) Y 7.2.1,/ '11•y 1 I, •=2 7 2 ,,f /. -.-I) ' i , • n r �z, Agenda Item No. May 16, 1996 TO: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Change Order No. 1 for the Northwest Interceptor Sewer (NWIS) Phase I Construction Contract PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider approving Change Order No. 1 deducting $225, 069 from the contract with Michels Pipeline Construction, Inc. eft. BACKGROUND On April 26, 1995 the City Council authorized the Mayor to enter into a contract with Michels Pipeline Construction, Inc. to construct the subject interceptor sewer. During pre-construction discussions with Michels Pipeline, they proposed the elimination of several deep manholes with longer sewer lines between manholes . Since the construction of the deep manhole shafts is costly, substantial savings to the project would be realized if the manholes were eliminated. As the initial design met Illinois Environmental Protection Agency ( IEPA) requirements, a revised plan was submitted to IEPA illustrating the proposed changes . IEPA accepted the change and issued a revised construction permit. Change Order No. 1, attached, details the adjustments to the contract with Michels Pipeline. Michels Pipeline has agreed to the terms of the change order and has signed the Change Order. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. C.O. No. 1 NWIS May 16 , 1996 Page 2 FINANCIAL IMPACT Acceptance of Change Order No. 1 will reduces the current contract with Michels Pipeline $225, 069 . 00, from $4,089,359 . 50 to $3,864 ,290 . 50. The sewer portion of the 1995 bond sale was used to fund these expenditures . Any savings from this project could be utilized to fund other sewer capital expenditures . LEGAL IMPACT None. ALTERNATIVES There is no alternative to this deduct change order. After the alternate was approved by IEPA and FRWRD, Michels Pipeline was authorized to proceed with the new alignment at their risk. The work has been substantially completed. RECOMMENDATION It is recommended that the City Council approve Change Order No. 1 in the deduct amount of $225, 069 . 00 and request the Mayor and City Clerk to execute the change order on behalf of eft the City. espectfully. su itted, 1 �ol/tG(F,J • , t ) l iatt/ / James L. Kristiansen Public Works Director C. c 1� . Richard B. Helwig City Manager DL/do Attachments