Loading...
HomeMy WebLinkAbout95-271 Resolution No. 95-271 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH SEAGREN/SHALES, INC. FOR THE AIRLITE WATER TREATMENT PLANT WHEREAS, the City of Elgin has heretofore entered into a contract with . Seagren/Shales, Inc. for the Airlite Water Treatment Plant; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ Kevin Kelly Kevin Kelly, Mayor Presented: December 20, 1995 Adopted: December 20, 1995 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk CONTRACT NO. 7 WEST ZONE PUMPING AND ELECTRICAL MODIFICATIONS AIRLITE WATER TREATMENT PLANT CHANGE ORDER #1 SCOPE: Change order #1 covers changes in the scope of the Airlite Water Treatment Plant - West Zone Pumping and Electrical Modifications contract No. 7 that were not reasonable foreseeable at the time the contract was signed and are in the best interests of the City. Items covered in this change order are: 1. West Zone pumps (1,3,5) control from Riverside (Dynamic Systems, Inc. ) 2. Power to the Vacuum Priming System (conduit / wiring) . 3. Addition of a lighting transformer three phase, 30 KVA. 4. Masonry wall to close the former transformer room and convert it to a storage room. 5. 3-inch pipe and fittings to replace undersized 2-inch pipe. 6. Credits. 7. Extension of substantial and final completion dates. This contract is with Seagren/Shales, Inc. , Elgin, Illinois. REASON FOR CHANGE: 1. The project was originally designed and bid without provisions to allow automatic pump control of the Airlite west zone pumps (1,3,5) from Alft tower and remote control from Riverside plant. This results in a net addition to the contract. 2. Due to a failure of the original electrical feed to the Vacuum Priming Unit, a temporary cable supplied power to the unit. A permanent replacement power feed was installed to keep west zone pumps operational. This results in a net addition to the contract. 3. The project was originally designed and bid with single phase voltage supplied to the lighting panel. However, during construction, it was noted that panel B was three phase, therefore requiring a three phase 30 KVA transformer. This results in a net addition to the contract. 4. The original plant transformer vault was constructed with a fenced door. Since this transformer was replaced and located outdoors, closing the wall and installing a window and door provided a 21' x 21' storage room. This results in a net addition to the contract. 5. To improve the flow of water to an existing standpipe in the former generator room, it was necessary to replace a 2-inch pipe with a 3-inch pipe. This results in a net addition to the contract. 6. Credits: a. Due to NEC code physical dimension requirements and space limitations , a pull box (PB-2) , two 90 degree sweep elbows and CITY OF ELGIN WEST ZONE PUMPING CONTRACT NO. 7 CHANGE ORDER NO. 1 PAGE 2 OF 4 four 4-inch couplings were not used. This results in a net credit to the contract. b. Because the location of pump #6 is close to a pull box beneath the new motor control center, a proposed pull box and long length of conduit were replaced with a shorter length of conduit by utilizing the closer pull box. This results in a net credit to the contract. c. The original contract called for replacement the existing 2400 volt fuses with 300 amp "E" fuses. During the submittal process, it was discovered that the S & C renewable fuses cannot physically fit in the S & C blocks. The existing fuses, 300 amp, were determined to be adequate to power the new 1000 KVA transformer. This results in a net credit to the contract. d. The contract documents gave details for a pedestal stand to mount the local control station Hand-Off-Automatic (H-O-A) switchleg for pumps 1,3,5. In order to match the existing installation, the H-O-A switchlegs are mounted to the pump bonnet housings. This results in a net credit to the contract. 7. This project was bid on November 4, 1993. The City Council awarded the bid to Seagren/Shales on November 17, 1993. Notice to Proceed was issued on December 13, 1993. The contract documents stipulate that the project was to be substantially complete within 270 calendar days and finally complete within 330 calendar days after written Notice to Proceed which was September 9, 1994 and November 8, 1994, respectively. This item covers an extension of Contract Time associated with the following items: a. Time associated with the extended review and approval of the high voltage metering shop drawings by Commonwealth Edison which is beyond the control of the Contractor. b. Time associated with the testing, repair work, and placing the facilities back into service as a result of the damage caused by the incorrect voltage on the temporary transformer (T-2) furnished by Commonwealth Edison. c. Time associated with the Contractor's work progress that was slowed as a result of the work performed by Commonwealth Edison to furnish and install the power service entrance which could not have been anticipated by the Contractor. d. Time associated with manufacturer removing, factory testing, adjusting and reinstallation of pump #3 as it was originally CITY OF ELGIN WEST ZONE PUMPING CONTRACT NO. 7 CHANGE ORDER NO. 1 PAGE 3 OF 4 unacceptable. Also motor #3 was removed due to excessive noise and vibration and had new bearings installed. e. Time associated with the Contractor's claims for additional work and costs covered by Items 1 through 5 in this Change Order No. 1. As a result of these items, the Contract time for substantial completion and final completion shall be extended to provide a new Contract Substantial Completion date of January 12, 1995 and a new Final Completion date of October 12, 1995. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: Item Description Price 1. Control from Riverside for $4,095.00 pumps 1,3,5 2. Power to vacuum priming system $ 919.00 3. 30 KVA transformer and panel $7,964.00 4. Masonry wall $5,851.00 5. 3-inch pipe and fittings $ 972.00 6. Credits: a. Pull box for high voltage ($2,117.93) cable b. Pull box & conduits for pump ($ 51.00) #6 power feeder c. S & C Electronic 300 amp ($ 427.00) cartridge fuse links d. Pedestal stands to mount ($ 368.00) Hand-Off-Automatic switchleg for pumps 1,3,5 7. Time Extensions No Cost Change TOTAL NET ADDITIONAL COST = $16,837.07 The original contract with Seagren/Shales Inc. was for $308,300.00 (Three Hundred Eight Thousand, Three Hundred Dollars) . With this change order amounting to $16,837.07 (Sixteen Thousand Eight Hundred Thirty-Seven and CITY OF ELGIN WEST ZONE PUMPING CONTRACT NO. 7 CHANGE ORDER NO. 1 PAGE 4 OF 4 07/100 Dollars) , the total contract amount will be $325, 137.07 (Three Hundred Twenty-Five Thousand, One Hundred Thirty-Seven and 07/100 Dollars) . OTHER CONTRACT PROVISIONS: All other contract provisions will remain the same. Agreed to this //?X. day of -e._Ck',-N , 1995. Recommended: Accepted: Black & Veatch Seagren/Shales Inc. Party of the Second Part (Contractor) / // By: •r" /ii /14: , BY: • / Title: �� / 1�_- Title: President Date: /' j Date: 11/21/95 Elgin Water Department City of Elgin Party of the First Part (Owner) By: Lt t t le 4 By: ,� 1 G _ Title: � r,� , dLd.�-1- (/ �-1Att vu r"1i Title: Date: / p � 3 r Date: 11_ [9 ' w Elmn �A�°:E�•� Agenda Item No. o ��yIC e/ q � e i .oQ,ren(te1 November 29, 1995 To: Mayor and Members of the City Council FROM: Richard B. Helwig, City Manager SUBJECT: Authorization of Change Order No. 1, Final Payment, and Acceptance of Airlite West Zone Pumping and Electrical Modifications PURPOSE The purpose of this memorandum is to provide the Mayor and the members of the City Council with information to consider the approval of Change Order No. 1, the acceptance of the completed work, and to authorize the final payment of the subject project. BACKGROUND City Council awarded the contract for this project to Seagren/ Shales Inc. , at its meeting on November 17, 1993, in the amount of $308,300. 00. The project generally included the removal of four existing high service pumping units; installation of three new horizontal split case high service pumping units; removal of an existing 480 volt motor control center, 750 KVA transformer, and 500 KW engine-generator; installation of high voltage meter- ing switchgear cabinets, a new 2400-480 volt, 1000 KVA transform- er, and new 480 volt motor control center inside the existing building; installation of associated conduit and cable; and miscellaneous demolition and modification work. Change Order No. 1 includes the following items, as more fully detailed in the attached Change Order No. 1 document: 1. West zone pumps 1, 3, and 5 control from Riverside: $4,095.00. 2. Power to the vacuum priming system (conduit/wiring) : $919.00. 3. Addition of a three-phase, 30 KVA lighting transformer: $7,964 .00. 4 . Masonry wall to close the former transformer room and con- vert it to a storage room: $5,851.00. Change Order No. 1, Airlite West Zone November 29, 1995 Page 2 5. 3-inch pipe and fittings to replace undersized 2-inch pipe: $972 .00 . 6. Credits : $2,963. 93. 7 . Extension of the substantial and final completion dates of January 12, 1995, and October 12, 1995, respectively: no cost change. - Total net additional cost is $16,837 .07 . The extensive no cost time extensions to the project were sub- stantially caused by the following issues : 1 . Time associated with the extended review and approval of the high voltage metering shop drawings by Commonwealth Edison, which was beyond the control of the contractor. 2 . Time associated with the testing, repair work, and placing of the facilities back into service as a result of the dam- age caused by the incorrect voltage on the temporary trans- former (T-2) furnished by Commonwealth Edison. 3. Time associated with the contractor's work progress that was slowed as a result of the work performed by Commonwealth Edison to furnish and install the power service entrance, which could not have been anticipated by the contractor. 4 . Time associated with manufacturer removing, factory testing, adjusting and reinstallation of pump #3 as it was originally unacceptable, and time associated to pump manufacturer work- ers which were on strike. Motor #3 was removed due to exces- sive noise and vibration and had new bearings installed. Seagren/Shales, Inc. , has completed the project in compliance with the plans and specifications prepared by Black & Veatch. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The original contract with Seagren/Shales, Inc. , was for $308,300.00. With Change Order No. 1 amounting to $16,837 .07, the final contract amount will be $325,137 .07 . The funds remain- ing for this project total $20, 165.00 under appropriation no. 392-000-795.92-00, project no. 409002 . As the total final pay- ment, including Change Order No. 1 is $37,002.07, the remaining $16,837 .07 will be funded from remaining bond revenues allocated for water projects . Change Order No. 1, Airlite West Zone November 29, 1995 Page 3 LEGAL IMPACT None. RECOMMENDATION It is recommended that the City Council approve Change Order No. 1 for $16,837 . 07, accept e completed work, and authorize the final payment of $37,002 . 07 o Seagren/Shales, Inc. 117 Respectfully submitted, I' t 14.O 'Richard B. Helw'g JCity Manager Ac ' / i Je i James L. Kristiansen Public Works Director LED:PLB: lh 01141120. 195 r • • r • 749 NORTH STATE STREET S eagren ELGIN, ILLINOIS 60123 P.O. BOX 823 Shales, Inc. ELGIN, ILLINOIS 60121 GENERAL CONTRACTORS (708) 931-5414 FAX (708) 931-0327 LETTER OF TRANSMITTAL TO: City of Elgin DATE 10/31/95 150 Dexter Ct. ATTN Peter Bityou Elgin, IL 60120 PROJECT: Airlite WTP Gentlemen: WE ARE SENDING YOU: [ X ] Attached [ ] Samples r ] Drawings [ ) Specifications t ] Plans [ ] Submittals [ ] Copy of Letter [ ] Change Order [ X ] Other [Copies] [Date] [Description) 3 Application and Certificate for Payment - No. 9 FINAL 1 Final Waiver - Seagren/Shales, Inc. • • • THESE ITEMS ARE TRANSMITTED AS CHECKED: [ X ] For Approval [ ] Approved as noted [ ] For Your Use [ ] Make Corrections Noted [ ] For Your Review & Approval [ ] Revise and Resubmit [ ] As Requested REMARKS: Sub final waivers were previously submitted. r Signed: Mike Shales 749 NORTH STATE STREET S eagren ELGIN, ILLINOIS 60123 P.O. BOX 823 Shales, Inc. ELGIN, ILLINOIS 60121 GENERAL CONTRACTORS (708) 931-5414 FAX (708) 931-0327 October 31, 1995 Mr. Peter Bityou City of Elgin 150 Dexter Court Elgin, IL 60120 Following is the billing for the net extras on the West Zone Pumping And Electrical Modifications, Airlite Water Treatment Plant, which I have included as Change Order No. 1 on the enclosed final pay request: Item 1: Control from Riverside for pumps 1,3,5 4,095.00 '" Item 2: Power to vacuum priming system 919.00 Item 3: 30 KVA transformer and panel 7,964.00 Item 4: Masonry wall 5,851.00 Item 5: 3 inch pipe and fittings 972.00 Item 6: Credits: a. pull box for high voltage cable (2,117.93) b. pull box & conduits for pump #6 power feeder (51.00) c. S & C Electronic 300 amp cartridge fuse links (427.00) d. pedestal stands to mount Hand-Off-Automatic switchieg for pumps 1,3,5 (368.00) Total 16,837.07 These had previously been submitted on our letter dated January 23, 1995. Thank you. Sincerely, . -�v Mike Shales • API L ATION AND CER I•!t-lUAI•E 1-0R P'AYMtN I AlA DOCUMENT C702 (instructions on reverse tide) MCI Om Or MCI: TO IOWNERI: City of Elgin' PROTECT: Contract No. 7, Airlite APPLICATION NO; . 9 Distribution to; 150 Dexter Court - D OWNER Elgin, IL 60120 Water Treatment Plant, West PERIOD TO: 10/31/95 DARCHITECT Zone pumping & Electrical • FROM ICOTRACTORI: Seagren/Shales, Inc. VIA (ARCHITEL.Iit ca ions DCONTR^CTOA N ARCHITECT'S p • 749 N. State St. Black & Veatch PROJECT NO: 17390.460 D Elgin, IL 60123 • 8400 Ward Pkwy CONTRACT DATE: CONTRACT FOR: KansasCit' MG 64114 12/9/93 Application is made for Payment,as shown below,In connecllon'wilh Ihe Contract. • CONTRACTOR'S APPLICATION FOR PAYMENT Continuation Sheet,MA Document G703, Is attached. CHANCE ORDER SUMMARY • i 1. ORIGINAL CONTRACT SUM r S 'Mg.300.00 ' ' Change Orders approved In ADDITIONS 2. Net change by Change Orders s 16.817.07 DEDUCTIONS T• CONTRACT SUM TO DATE (Line 1:2) S 125.137.07 • prcviars•months by Owner TOTAL - 4. TOTAL COMPLETED &STORED TO DATE S 125.137.07 . -- - _ , _ _____ -� _ -- Approved this Month (Column G on G703) S. RETA NAGEt Number Dale Approved • a. x of Completed Work 1 0.00 • 001 10/95 16,837.07 (Column 0+E on C7031 . b. % of Stored Material S 0.00 • . • (Column F on G703) • Total Retainage (Line Sa+Sb or • TOTALS_ 16 1837.07 _ Total in Column I of G703) S. 0.00 Net change by Change Orders 161837.07 • • ' 6.TOTAL EARNED LESS RETAINAGE 1, 125,117.07 (Line 4 less Line 5 Total) • The undersigned Contractor certifies that to the best of the Contractor's knowledge. ���LESS PREVIOUS t FRTIFiCATES FOR W information and belie( the work covered by this Application for Payment has been 2$$ 135.00 completed in accordance with the Contract Documents,that all amounts have been PAYMENT (Line 6 from prior Certificate) i • paid by the Contractor (or Work for which previous Certificates (or Payment were 6. CURRENT PAYMENT DUE s 37.002.07 issued and payments received from the Owner, and that current payment shown 9. BALANCE 70 FINISH,PLUS RETAINAGE S 0.00 herein is now due. (line 3 less Line 6) r,• • 'Stale o(: \ ��1if10 r c Count oh • CONTRACTOR: Seagre hales, Inc. -7/ 5 T • i A nr .. Subscribed ands to D ore ms this d •�( {9 7 A L • Notary Public: � ENIE 'M. BARRE. { Date: 10/31/95 My Commission expires: PUH:'^• STATi OF ILL'YC!S f fly - g— e MY commISS;^ti cxoi41'S 6/8/96 AMOUNT CERTIFIED .l ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach explanation if amount certified dillers•lrom the amount applied lox) In accordance with the Contract Documents,based on on-site obsemtions and the ARCHITECT: • data comprising the above application,the Architect certifies to the Owner that to the • • best of the Architect's knowledge,information and belle( the Work has progressed as By: • .Date: tnelicated,tine quality o(the Work Is In accordance with the Contract Documents.and This Certificate is not'negotiible. The AMOUNT CERTIFIED Is payable only to the the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein.Issuance,payment and acceptance of payment are without • • pteludlce io any rights of the Owner or Contractor under Ibis Contract. • MA OOCUA,IN1 m•AM1,CAIION AND CTRII(ICATI (OR r.Ar NNI• FAY$*I 10111054•A1A••e 19111 • flu ,%.:IMCAv 14+ururt W WWI CIS. 1:1'POW roar; •e•CNtC.�.t.:. wA:kruNcR)•V. D.C. 2l!. . C:01•19113 r ` 1 • Continuation Sheet APPLICATION NUMBER: 9 Page 1 of 1 APPLICATION DATE: 10/31/95 Airlite Water Treatment Plant PERIOD TO: 10/31/95 West Zone Pumping and Electrical Modifications ARCHITECT'S PROJECT NO: 17390.460 A B C D I E F G H I ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL %. BALANCE RETAINAGE NO. VALUE PRESENTLY COMPLETED (G+C) TO FINISH (If Variable FROM PREVIC THIS PERIOD STORED AND STORED (C-G) Rate) APPLICATION (NOT IN TO DATE (D+E) D OR E) (D+E+F) Mobilization 5,000.00 5,000.00 5,000.00 100.0% 0.00 General Conditions 8,500.00 8,500.00 8,500.00 100.0% 0.00 Bonds&Insurance 8,000.00 8,000.00 8,000.00 100.0% 0.00 Concrete and Demolition Work: Transformer Pads&Duct Work 13,575.00 13,575.00 13,575.00 100.0% 0.00 Pump Bases 12,500.00 12,500.00 12,500.00 100.0% 0.00 Generator Removal 6,000.00 6,000.00 6,000.00 100.0% 0.00 Misc. Demolition &Patching 12,000.00 12,000.00 12,000.00 100.0% 0.00 Electrical: Square D MCC 38,000.00 38,000.00 38,000.00 100.0% 0.00 Square 0 High Voltage Section: 7,600.00 7,600.00 7,600.00 100.0% 0.00 Square 0 1000 KVA Transform( 9,700,00 9,700.00 9,700.00 100.0% 0.00 Square D Cable Tray 700.00 700.00 700.00 100.0% 0.00 Exterior/Underground/Conduits 8,400.00 8,400.00 8,400.00 100.0% 0.00 5KV Cable 4,000.00 4,000.00 • 4,000.00 100.0% 0.00 Multi-Cond/Tray Cable/Wire 6,300.00 6,300.00 6,300.00 100.0% 0.00 Pull/Junction Boxes, Raceways 16,500.00 16,500.00 16,500.00 100.0% 0.00 Conduits/Feeders Rough-in 36,600.00 36,600.00 36,600.00 100.0% 0.00 Equipment/Gear Connec./Term 18,000.00 18,000.00 18,000.00 100.0% 0.00 . Remote Terminal Unit 30,700.00 30,700.00 30,700.00 100.0% 0.00 Pumps 25,600.00 20,600.00 5,000.00 25,600.00 100.0% 0.00 Piping: Mobilization • 2,000.00 2,000.00 2,000.00 100.0% 0.00 Material From Stock 8,000.00 8,000.00 8,000.00 100.0% 0.00 Pipe Covering 6,340.00 6,340.00 6,340.00 100.0% • 0.00 • Labor 17,660.00 17,660.00 17,660.00 100.0% 0.00 Painting 5,400.00 5,400.00 5,400.00 100.0% 0.00 Floor 1,225.00 1,225.00 1,225.00 100.0% 0.00 CHANGE ORDER NO. 1 16,837.07 0.00 16,837.07 16,837.07 100.0% 0.00 325,137.07 303,300.00 21,837.07 0.00 325,137.07 100.0% 0.00 i)U� L. I.vLL -*WAIVER OF LIEN NO 3HP VLV ORIGINAL CONTRACTOR'S COMPLETE APRIL 19130 LEGAL FORMS (was) CAUTION:Consult a lawyer before using or acting under this form.All warranties,including merchantability and faness,ere excluded. STATE OF ILLINOIS ss. COUNTY OF Kane To All Whom It May Concern: WHEREAS, the undersigned. Seagren/Shales, Inc. , has been employed by City of Elgin , owner of the premises known as Airlite Water Treatment Plant, West zone Pumping & Electrical Mod. in the City of . Elgin , County of Kane Illinois, and legally described as: 74 N_ Airlite St_ to furnish Labor & Materials �^ - for the said premises: NOW, THEREFORE, the undersigned, for and in consideration of the sum of Three Hundred Twenty Five Thousand One Hundred Thirty Seven & 07/100 ollars, and other good and valuable considerations, the receipt whereof is hereby acknowledged by the undersigned. does hereby waive and release any and all lien or claim of or right to lien under the statutes of the State of Illinois relating to mechanics' liens, with respect to and on the above-described premises, and the improvements thereon. and on the material, fixtures, apparatus or machinery furnished, on account of labor, services. material: fixtures, apparatus or machinery heretofore furnished, or which may he furnished at any lime hereafter. by the undersigned, to or on account of the said owner. for the above-described premises. Dated this 31st day of October , 19 95. (affix corporate seal here) Seagren/Shales, Inc. ATTEST: \ n .,v\ l • (na/ rne( eownerslrrP.coFPo:forr 91 or partnership) \J i (SEAL) (Signature of secretary of corporation) (signal e of sole owner or of authorized representative of corporation or partnership) • • r • • . „ • ..„ • • , •