HomeMy WebLinkAbout94-278 Resolution No. 94-278
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
GLUTH BROTHERS CONSTRUCTION, INC. FOR THE WEST ZONE PHASE II
WATER MAIN PROJECT
WHEREAS, the City of Elgin has heretofore entered into a
contract with Gluth Brothers Construction, Inc. for the West
Zone Phase II water main project; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager,
be and is hereby authorized and directed to execute Change
Order No. 1, a copy of which is attached hereto and made a
part hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: October 12 , 1994
Adopted: October 12, 1994
Omnibus Vote: Yeas 7 Nays 0
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
s ati
ELGIN, ILLINOIS
WEST ZONE - PHASE II
CHANGE ORDER NO. 1
PAGE 1 OF 3
SCOPE: This Change Order No. 1 covers changes in the scope of work of the
West Zone - Phase II water main project that were not reasonably foreseeable
at the time the contract was signed and are in the best interest of the City.
This contract for construction is with Gluth Brothers Construction, Inc. ,
Woodstock, Illinois.
REASONS FOR CHANGE:
Item 1
This project was bid on October 4, 1993. The City Council officially awarded
the bid to Gluth Brothers on November 17, 1993. The contract documents
stipulate that the project was to be substantially complete (for Owner's
beneficial use) within 60 calendar days after written Notice to Proceed. The
substantial completion date was determined to be January 23, 1994. Due to the
late start, by contract, and with the extreme winter weather, the contractors
progress was slower than anticipated. Therefore in order to allow the
contractor time to complete construction, test, and chlorinate the completed
main, the Substantial Completion date should be extended to March 9, 1994.
This will not amount to a monetary change to the contract.
Item 2
The contract documents stipulate that the project was to be fully complete
within 90 calendar days after written Notice to Proceed. The Final Completion
date was determined to be February 22, 1994. Due to the late start the
contractor is unable to perform surface restoration (bituminous paving and
seeding) until warmer weather. Therefore, the Final Completion date should be
extended to June 15, 1994. This will not amount to a monetary change to the
contract.
Item 3
The project was designed and bid based on the concept that the 20-inch water
main would cross Highland Avenue, west of the NIGAS easement, at the north end
of the project. After the pit for the bore and jack operation under Highland
Avenue was dug and equipment was set, the City was notified that they would be
constructing on private property on the north side of Highland Avenue. The
City then instructed the contractor to remove his equipment from the bore pit
and backfill until a resolution was reached. The crossing was then relocated
and the contractor remobilized at a later date to dig the pit and perform the
bore and jack operations. This will result in a net addition to the contract.
ELGIN, ILLINOIS
WEST ZONE - PHASE II
CHANGE ORDER NO. 1
PAGE 2 OF 3
Item 4
The project was designed and bid based on pipe routing and appurtenant work
designated by the City. During the course of construction, the City informed
the contractor that they wanted a 24-inch by 12-inch tee added along Weld Road
for future expansion. Since this item was not in the original bid, a change
order was necessary to include the material only cost of the fitting. This
will result in a net addition to the contract.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
The contract dates and amounts will be revised as follows:
Item 1
Add 36 calendar days to the contracted Substantial Completion date.
Item 2
Add 113 calendar days to the contracted Final Completion date.
Item 3
Add 19 crew hours for labor. Total add = $874.00.
Add 20.5 hours equipment. Total add = $1,652.50.
Total Additional Cost = $2,526.50.
Item 4
Add 24-inch by 12-inch tee material cost. Total add = $1,175.00.
TOTAL NET ADDITIONAL COST = $3,701.50
The original contract with Gluth Brothers Construction, Inc. was for
$799,884.50 (Seven Hundred Ninety-Nine Thousand, Eight Hundred Eighty-Four and
50/100 Dollars) . With this change order amounting to $3,701.50 (Three
Thousand Seven Hundred One and 50/100 Dollars) , the total contract amount will
be $803,586.00 (Eight Hundred Three Thousand, Five Hundred Eighty-Six and
00/100 Dollars) .
ELGIN, ILLINOIS
WEST ZONE - PHASE II
CHANGE ORDER NO. 1
PAGE 3 OF 3
OTHER CONTRACT PROVISIONS: All other contract provisions will remain the
same. f�
Agreed to this / iA day of C((,) = 6 , 1994.
Recommended: Accepted:
CLARK DIETZ, INC. GLUTH BROTHERS CONSTRUCTION, INC.
Engineers and Architects Party of the Second Part (Contractor)
By: i..� i i4_ , �. E, By:_ G? i�
Title: VI ee Pjto t/0(0ti-74 Title: Pt_i__ / Ds.'--' T
Date: 6 /C 6 1 q'`/ Date: My// 4-
fv/ -
ELGIN WATER DEPARTMENT CITY OF ELGIN
` Party of the First Part (Owner)
C r By; �z!vL c ( �� By: ±1� _
Title: Gl-r4-(X ) Ida-#-(1 '?1J7 v Title: 8_,„:1Ei
Date: l /07■ 9 Date: f° ``1 (44
t:0225-p2.wp
�I I
I� ft
Wel gifax ''
, i ,+-- ; 1 1994 ,,,
'W g .,.
TELEPHONE 8151338-1662 1151 LAKE AVENUE
FAX 815/338-1047 WOODSTOCK,ILLINOIS 60098
FEBRUARY 15 , 1994
CITY OF ELGIN - WATER DEPARTMENT
150 DEXTER COURT
ELGIN, ILLINOIS 60120
REQUEST FOR CHANGE ORDER FOR WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II , ELGIN, ILLINOIS
TIME AND MATERIAL WORK - WATER MAIN BORING PIT ON HIGHLAND AVENUE WAS
EXCAVATED AND BORING EQUIPMENT INSTALLED, BUT DUE TO LACK OF EASEMENT
HAD TO BE ABANDONED.
LABOR 9 . 5 HR 45 . 00 427 . 50
FOREMAN 9 . 5 HR 47 . 00 446 . 50
UTILITY TRUCK w/TOOLS 9 . 5 HR 10 . 00 95 . 00
KOMATSU 300 BACKHOE w/OPERATOR 9 . 5 HR 145 . 00 1377 . 50
JOHN DEERE 755 CRAWLER w/OPERATOR 1 . 5 HR 120 . 00 180 . 00
24" x 12" D. I . MJ TEE
(WATERPRO INVOICE ATTACHED) 1 EA 1175 . 00 1175 . 00
84" WATER VAULT - COMPLETE
(WELCH BROS . INC. ATTACHED) 1 EA 1773 . 33 1773 . 33
24" BUTTERFLY VALVE
(WATERPRO INVOICE ATTACHED) 1 EA 2594 . 00 2594 . 00
TOTAL REQUEST FOR CHANGE ORDER 8068 . 83
GLUTH BROS . CONSTRUCTION, INC.
/
GLUTH, PRESIDE T
CC: CLARK DIETZ , INC .
II ,,
ORIGINAL INVOICE INVOICE
H', WEST ZONE PHASE i I PLEASE REMIT TO P O BOX 95586
T. C/0 GLUTH BROS , CHICAGO IL 60694 5586 •
P:'; JOB 93•--662 SOUTHWEST CORNER OF DIRECT INQUIRIES T0:
RT 20 & WELD RD
0 ELGIN IL. alk wa
vp terPrO
(31.U-ill BROTHERS Phone: (708)665-1800 Fax; (708)665-1887
1. 1151 LAKE AVE INVOICE NO. INVOICE DATE I PAGE ( WHSE
LL WOOLIS T OCK IL 60098 DROP SHIPME T
i, ;; 51623 11/03/9 1 I s�.
%D ) THANK YOU FOR OUR TERMS ARE NET 30 DAYS. IN THE EVENT YOU REQUIRE
YOUR ORDER: ADDITIONAL CREDIT. SER'UCE CHARGES WILL BE A,',"' D AT
THE RATE OF 1.5% PER MONTH ON THE U'N?AC. BALANCE.
IR I.D.NO. TO I JOB NAME I NUMBER CUSTOMER P.O.NO., TRANSACTION NO. DATE ORDERED kg ( DATE SHIPPED SHIP VIA •
BRO ?: V 516786 10/0.7/9: 9d911103/93 OUR TRUCK
M NUitBER "AESCRliiijO! :, "QUANTITY 3 UNIT.L EXTENDED j
4"-s >". x - -i 4. ::.£ . - :ORDERED• SHIPPED - BACKORDERED PF{ICE� :,,AMOUNT.---:'''>_4
I ,
861215354 24" X 20" 'DI: MJ TEE. 1 1 0 EA 1566.000 /5664001
412MM 24"X:12" DI MJ TEE 0 EA 1175.000 2350.00
024Mi`f 24" Di MJ 90 BEND % 0 EA 1.401 .000 9807+00
224MM 24" DI MJ 22 1/2 BEND 1 1 0 EA 892.000 892.00
24 24" I:II MJ LONG SLEEVE 1. 1 0 EA 7.1.0.000 710400
006MM 20"X6" LII M.J TEE 2 '.1 0 EA 787.000 1574.00 •
520MM 20" DI MJ •45 BEND ,. -_ 0 EA 6304000 1260.06
861215356 20" X 12" MJ REDUCER 1 1 0 EA 460.000 460.00
1.2 12" DI SJ PLUG LI 4 0 EA 106.000 42.4400
*Are you in compliance with new OSHA confined space*
<rea_ 1r lj s Call _ s today +oT ncrc information ! *< 'u
14L NET MERCHANDISE SALES TAX IAINOU -
�t ACCT.
rJ; l 19,043.00 0.00 19,043.0
n 11
1 11! _ I
,i.
1!!!!!11:Tellir WE LCH BROS., INC. _1050 ST. CHARLES ST.
ELGIN, IL. 60120 DATE •
(708) 741-613 ' 12/28/931 32951:n .
S GLU�00 S '4' :#: INVOICE :T: :_:
O GLUTH H EROS. , INC. H TOE; 662
L 1151 LAKE AVE . P WELD ROAD WA T ERi 1A I N
D WOODSTOCK, IL INPROVEMENTS
T F.00 _; T ELGIN
O 338. 1552
IP VIA JOB NO. CUST.ORDER NO. DATE ORDERED DATE SHIPPED DRIVER CLERK NO. TERMS C.A.
:.1-2• 66'2 12/28/93 12/2__/'1_; 07 NET 30 DAYS 1
ORDERED SHIPPED ITEM NO. DESCRIPTION - INVElli UNIT PRICE - AMOUNT .
INVOICE INVOICE INVOICE INVOICE
1 .00 346C:E, 84" CAST BOTTOM EA 170 .0 0 170 .00
1 . 00 _.'44 E,E' 84 .. 48 BARREL RISER VF 1F.0. 00 E,4 i-i . 0 i
1 .00=O 34248 84 x 24 BARREL RISER 'IF 11;0 . 00 3'7'0 .00
1 . 00 4Ti_ 84' ~T r G FLAT TOP OFFSET H EA 400. 00 400 . 00
1 .00 3416E 4 . . 16 BARREL RISER VF 1 E,0 . ij{i 213 .33
f::. 00 1" EZ STICK 14 . 5' RL ROLL 3 . 75 _;0 . 00
DEC
1993
VENDOR
106 --.,4 -
1773.33 • 1773.3:3
SALES AMOUNT SALES TAX _SHIPPING CHARGE MISCELLANEOUS CODE DEPOSIT CASH CODE BALANCE DUE
4.
PLEASE PAY THIS
AMOUNT
.> •
t
RECD.BY
.
CUSTOMER COPY
S ORIGINAL INVOICE
INVOICE
.P:0.BOX•95586'
H ±f::i T' tc.Ctii�lF:: F''+�;-)s_'3E: �:;+ PLEASE REMIT TO 'CHICAGO IL 60694-5586r
i `l - C/0 OL i T h( 1:tRf_:S ._. ..;OB *i'''.�:'_}' .��tii.-1 f"
P
I DIRECT INQUIRIES TO:
T.
ii 0 F:I_G3:N II.. gk Water"'
%, 10
B ;31_.(.i'[I-3 i h(.,"'Ti 11:life Phone: (708)665.1800 Fax: (708)665-1887
I,
I L'. 1151 )-•AK E AVE INVOICE NO. INVOICE DATE PAGE
is J1...).!)_+.._•T f_,t.,1i- IL 60092 L�?L'(.:.f.(.f� q
7 .+345L 1 01./0'3/t)4r :1 NO
0 J THANK YOU FOR OUR TERMS ARE NET 30 DAYS. IN THE EVENT YOU REQUIRE
YOUR ORDER: ADDITIONAL CREDIT, SERVICE CHARGES WILL BE ASSESSED AT
THE RATE OF 1.5% PER MONTH ON THE UNPAID BALANCE.
CUSTOMER I.D.NO. TU JOB NAME/NUMBER CUSTOMER P.O.NO. TRANSACTION NO. DATE ORDERED MAN DATE SHIPPED SHIP VIA
9(:i!_l1E'•FS('l 25 93'-•662 533290-3 1.1.n /93 90901/03/94 OUR TRUCK
QUANTITY UNIT "EXTENDED=r`,
ITEM NUMBER DESCRIPTION
.PRICE AMOUNT
ORDERED SHIPPED BACK ORDERED •
I:{F'V324MML. 24"MJ DF VL.V. PRATT DL. a 3 () EA 2594.000 7782.00
1 i~i.J:t{N0640 3/4"X5" MJ BOLT & NUT ^`? o EA 0.,000 0.00
FR T 1 W f'C: F F1 F::]:c•i l T' 1 1 0 M I O�t7 t7 0 0.�t)t)
*Are t? Y{J t.). :LI"i ('f flt(:) 1. L�:),It:"(� w L'{'.i'i 1??cs trl % to) (_ri s
t-- :1.: !wd I:)o{_(.
*irc--?C!u . T'0iflO?ftis�!' (:C1_!.:!. us {:C)�1�:1y for mare :t.nf':)T`0)C\1•. .C)n ! *
HVENDOR 114-61
I •i:
!
NET MERCHANDISE SALES TAX INVOICE
- AMOUNT
7y782.00 i 4 l0 7y782.00
"/1-1.-
CITY OF ELGIN, ILLINOIS WEST ZONE - PHASE II
Final Payment Request No. 3
Through 20 June 1994
Payable to: Gluth Brothers Construction
1151 Lake Avenue
Woodstock, IL 60098
Contract Work Completed
Item Description, Estimated Unit Total
No. Unit of Measure Quantity Price Amount Quantity Amount
1 12-Inch Diameter Water 65 LF $ 30.00 $ 1,950.00 76 $ 2,280.00
Main, BFM #2
2 20-Inch Diameter Water 6,715 LF 45.50 305,532.50 7,105 323,277.50
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 52.00 329,680.00 6,463 336,076.00
Main, BFM #2
4 24-Inch Diameter Water 435 LF 65.00 28,275.00 436 28,340.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 175.00 16,625.00 110 19,250.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 95.00 8,550.00 90 8,550.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 1,900.00 7,600.00 6 11,400.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 3,000.00 18,000.00 6 18,000.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 4,000.00 32,000.00 9 36,000.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 1,443.00 20,202.00 14 20,202.00
Contract Work Completed
Item Description, Estimated Unit Total
No. Unit of Measure Quantity Price Amount Quantity Amount
11 Field Tile Replacement, 100 LF $12.00 $ 1,200.00 256 $ 3,072.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 15.00 750.00 130 1,950.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 30.00 1,500.00 0 0.00
18" and Larger
14 Seeding 3.0 AC 2,500.00 7,500.00 1.30 3,250.00
15 Surface Replacement, 35 SY 10.00 350.00 25 250.00
Aggregate
16 Surface Replacement, 480 SY 25.00 12,000.00 361 9,025.00
Bituminous Concrete
17 Temporary Surface 480 SY 7.00 3,360.00 313 2,191.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 1.00 10.00 64 64.00
19 Granular Trench 400 TONS 12.00 4,800.00 0 0.00
Stabilization
Contract Amount $799,884.50 $823,177.50
Change Order No. 1
20 Highland Ave. Bore Pit 1 EA 2,526.50 2,526.50 1 2,526.50
21 Additional 24" x 12" Tee 1 EA 1,175.00 1,175.00 1 1,175.00
Revised Contract Amount $803,586.00 $826,879.00
V:062094M1.WP
CITY OF ELGIN WEST ZONE - PHASE II
PAYMENT ESTIMATE SUMMARY
ORIGINAL CONTRACT AMOUNT $799,884.50
CHANGE ORDER NO. 1 3,701.50
REVISED CONTRACT AMOUNT $803,586.00
TOTAL VALUE OF COMPLETED WORK $826,879.00
DEDUCT RETAINAGE (0%) 0.00
BALANCE DUE ON COMPLETED WORK $826,879.00
LESS PREVIOUS PAYMENTS 770,357.37
DUE THIS PAYMENT $ 56,521.63
ESTIMATE CERTIFICATION
Contractor - GLUTH BROS. CONSTRU T y l /��� _% Date �i 5l
Engineer - CLARK DIETZ, INC. , i /? ('�� Date 00'1--
Owner - CITY OF ELGIN, IL /Ga Date y//‘/
V:062094M1.WP
t
•
in
Agenda Item No.
•
qp e
September 21, 1994
TO: Mayor and Members of the City Council
FROM: Richard B. Helwig, City Manager
SUBJECT: Authorization of Change Order #1, Final Payment,
and Acceptance of West Zone Phase II Water Main
(W-06 & W-09)
PURPOSE
This memorandum will provide the Mayor and City Council with
information to consider in approving change order #1, author-
izing final payment, and accepting the project.
BACKGROUND
The City Council awarded the contract of 1992 water distribu-
tion system improvements, West Zone Phase II to Gluth Bros .
Construction, Inc. , at its November 17 , 1993, meeting. The
project generally included the construction of a 24-inch
water main from Randall Road along U.S. Route 20 approximate-
ly 6,899 linear feet (W-06) and of a 20-inch water main con-
necting to the end of the 24-inch main going north across
U.S. Route 20 and connecting to the water main on Highland
Avenue, approximately 7, 305 linear feet (W-09 ) . The total
project installed about 14,200 feet or 2 .7 miles of new water
transmission mains .
Attached is change order #1 for additional changes in the
scope of the work, which includes the following items :
Item #1 : Add 36 calendar days to the contracted final
completion date
Item #2 : Add 113 calendar days to the contracted final
completion date
Item #3: Add 19 crew hours for labor $ 874 .00
Add 20 .5 hours for equipment 1,652 .50
TOTAL $2,526 .50
Page 2
Item #4 : Add 24" x 12" tee material cost $1, 175 . 00.
TOTAL NET ADDITIONAL COST $3, 701 .50
Details and justification for the above are included on the
attached change order #1 .
Gluth Bros . has completed the project in compliance with the
plans and specifications prepared by Clark Dietz, Inc .
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None.
FINANCIAL IMPACT
The initial contract was awarded for $799 ,884 .50 . The con-
tract amount based on actual measured in-place quantities
totaled $823, 177 .50 . Change order #1, which covers addition-
al changes in the scope of work, amounts to $3, 701 .50 . This
brings the total revised contract cost to $826, 879 . 00. Also
attached for your consideration is a copy of the final pay-
ment request.
LEGAL IMPACT
None.
RECOMMENDATION
It is recommended that the City Council authorize payment of
change order #1 in the amount of $3,701 .50 and of the final
payment to Gluth Bros . Construction, Inc. , in the amount of.
$56,521 . 63 and accept the completed project.
espectfully Sub 772d,
/
/ ^J - /a/Grl
James L. Kristiansen
Public Works Director
Richard B. Helwig
City Manager
RBH:JLK:PLB: jk 01140914 .294
n
Agenda Item No. 3
_ r
�'q4!!0 Pt0
November 11, 1993
TO: Mayor and Members of the City Council
FROM: Robert 0. Malm, Assistant City Manager
SUBJECT: Award of West Zone - Phase II Water Main Bid
PURPOSE
This memorandum will provide the Mayor and City Council with
information to consider in awarding a construction contract
for the west zone-Phase II water main.
BACKGROUND
On October 4, 1993, 17 bids were opened for the construction
of a 24-inch/20-inch water main as a part of the water distri-
bution improvements. This project will extend the 24-inch
water main constructed in 1992 (from the Airlite Street Water
Treatment Plant to Randall Road) from Randall Road west along
U.S. Route 20 approximately 6,775 linear feet. From this
point, a 20-inch water main will be constructed to connect to
the water main on Highland Avenue, approximately 7,900 feet
to the north.
Clark Dietz, Inc. , the Public Works/Water Department' s engi-
neer for this project, has completed its evaluation of the
bids received, and the company's comments and recommendations
are noted on the attached letter.
FINANCIAL IMPACT
Funds totalling $877,800 have been allocated for this project
in the Water Department's 1993 budget under the two titles
Airlite to Nestler 24-inch water main (W-06) and U.S. Route
20 to Highland Avenue 20-inch water main (W-09) , appropria-
tion #392-0000-795.92-80 (Projects 409006 and 409009, respec-
tively) . The engineer's estimate for this project was
$1, 109,415 .
r
Award of West Zone-Phase II Water Main Bid
November 11, 1993
Page 2
RECOMMENDATION
It is recommended that this contract be awarded to the over-
all low bidder, Gluth Bros. Construction, Inc. , Woodstock,
for a price of $799,884 .50 .
Rob t 0. Mal
Assistant City Manager
ROM:amp
Attachment
c: Larry Deibert, Director of Water Operations
47)
Al,
CD I CLARK DIETZ, INC.
r
October 5, 1993
Mr. Larry Deibert
Director of Water Operations
City of Elgin
150 Dexter Court
Elgin, IL 60120-5555
Re: 1992 Water Distribution System Improvements
West Zone - Phase II
Dear Mr. Deibert:
On Monday, October 4, 1993 the City of Elgin opened bids for the above referenced project.
The apparent low bidder was Gluth Brothers Construction, Inc., Woodstock, Illinois, 60098
in the amount of$799,884.50. Our estimate, provided to the City of Elgin on September 13,
1993, was $1,109,415.00.
We recommend to the City of Elgin that they accept the low bid from Gluth Brothers
Construction, Inc. in the amount of$799,844.50 and begin proceedings to execute the
agreement.
A bid tabulation of the results of the bid opening is attached.
If you have any further questions, please call.
Very truly yours,
Clark Dietz, Inc.
Buddy D. huler
MRV/mlg 1005-M1.WP
cc: Mr. John Callan, CDI
Mr. Mike Sarro, Elgin Purchasing Agent
r
Clark Dietz,Inc.
1817 S.Neil,Suite 100
Champaign,IL 61820
217/373-8900 ENGINEERS ARCHITECTS
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
Clark Dietz. Inc. Gluth Bros. Constr. Rossi Contractors
Item Description, Estimated Unit Total Unit Total Unit Total
No. , Unit of Measure Quantity Price Amount Price Amount Price Amount
1 12-Inch Diameter Water 65 LF 35.00 2,275.00 30.00 1,950.00 57.00 3,705.00
Main, BFM #2
2 20 Inch Diameter Water 6,715 LF 60.00 402,900.00 45.50 305,532.50 46.25 310,568.75
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 65.00 412,100.00 52.00 329,680.00 54.00 342,360.00
Main, BFM #2
4 24-Inch Diameter Water 435 LF 80.00 34,800.00 65.00 28,275.00 70.00 30,450.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 300.00 28,500.00 175.00 16,625.00 231.00 21,945.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch.Diameter Water 90 LF 275.00 24,750.00 95.00 8,550.00 100.00 9,000.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 2,500.00 10,000.00 1,900.00 7,600.00 1,925.00 7,700.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 5,000.00 30,000.00 3,000.00 18,000.00 3,800.00 22,800.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 8,000.00 64,000.00 4,000.00 32,000.00 5,275.00 42,200.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 2,000.00 28,000.00 1443.00 20,202.00 1,510.00 21,140.00
11 Field Tile Replacement, 100 LF 12.00 1,200.00 12.00 1,200.00 15.00 1,500.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 20.00 1,000.00 15.00 750.00 25.00 1,250.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 25.00 1,250.00 30.00 1,500.00 40.00 2,000.00
18" and Larger
Clark Dietz. Inc. Gluth Bros. Constr. Rossi Contractors
Item Description, Estimated Unit Total Unit Total Unit Total
lilt_ Unit of Measure Quantity Price, Amount Price Laud Price Amount
14 Seeding 3.0 AC 10,000.00 30,000.00 2,500.00 7,500.00 2,250.00 6,750.00
15 Surface Replacement, 35 SY 8.00 280.00 10.00 350.00 8.00 280.00
Aggregate
16 Surface Replacement, 480 SY 32.00 15,360.00 25.00 12,000.00 26.00 12,480.00
Bituminous Concrete
17 Temporary Surface 480 SY 25.00 12,000.00 7.00 3,360.00 16.00 7,680.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 100.00 1,000.00 1.00 10.00 150.00 1,500.00
19 Granular Trench 400 TONS 25.00 10,000.00 12.00 4,800.00 10.00 4,000.00
Stabilization
TOTAL BASE BID AMOUNT 1,109,415.00 799,884.50 849,308.75
W:E04BDTB1.WP
410m4k irm1/4 irmN
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
J. Conadon Sewer pemosev Ina. Inc. Twin Sewer & Water
Item Description, Estimated Unit Total Unit Total gait Total
HI.. Unit of Measure Quantity WO Amount Price Amount Price Amount
1 12-Inch Diameter Water 65 LF 42.30 2,749.50 34.77 2,260.05 44.00 2,860.00
Main, BFM #2
2 20 Inch Diameter Water 6,715 LF 43.00 288,745.00 44.24 297,071.60 47.50 318,962.50
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 49.60 314,464.00 61.18 387,881.20 61.00 386,740.00
Main, 8FM #2
4 24-Inch Diameter Water 435 LF 67.00 29,145.00 62.51 27,191.85 53.00 23,055.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 165.35 15,708.25 200.00 19,000.00 140.00 13,300.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 110.00 9,900.00 100.00 9,000.00 140.00 12,600.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 1,820.00 7,280.00 1,500.00 6,000.00 1,885.00 7,540.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 3,215.00 19,290.00 3,750.00 22,500.00 3,150.00 18,900.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 5,755.00 46,040.00 5,900.00 47,200.00 4,245.00 33,960.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 2,495.00 34,930.00 1,400.00 19,600.00 1,650.00 23,100.00
11 Field Tile Replacement, 100 LF 30.00 3,000.00 25.00 2,500.00 15.00 1,500.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 40.80 2,040.00 35.00 1,750.00 22.00 1,100.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 88.00 4,400.00 45.00 2,250.00 35.00 1,750.00
18" and Larger
J. Congdon Sewer Denney Ing. Inc. Twin Sewer 6 Water
Item Description, Estimated Unit Total Unit Total Unit Total
No. Unit of Measure Quantity Price Amoun t Price Amoun t Price Amount
14 Seeding 3.0 AC 21,540.00 64,620.00 4,000.00 12,000.00 1,500.00 4,500.00
15 Surface Replacement, 35 SY 5.00 175.00 5.50 192.50 7.00 245.00
Aggregate
16 Surface Replacement, 480 SY 24.10 11,568.00 25.00 12,000.00 39.00 18,720.00
Bituminous Concrete
17 Temporary Surface 480 SY 10.00 4,800.00 15.00 7,200.00 45.00 21,600.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 400.00 4,000.00 200.00 2,000.00 48.00 480.00
19 Granular Trench 400 TONS 18.00 7,200.00 16.00 6,400.00 17.00 6,800.00
Stabilization
TOTAL BASE BID AMOUNT 870,054.75 883,997.20 897,712.50
W:E04BDTB2.WP
Irm1/4 4rmlok 4r4
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
Glenbrook Excavating Szabo Contracting Lake County Grading
Item Description, Estimated Unit Total Unit Total Unit Total
Mo. Unit of Measure Quantity Price Amoun t Price Amount Price Amount
1 12-Inch Diameter Water 65 LF 50.00 3,250.00 60.00 3,900.00 39.00 2,535.00
Main, BFM #2
• 2 20 Inch Diameter Water 6,715 LF 51.50 345,822.50 46.00 308,890.00 49.50 332,392.50
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 55.50 351,870.00 58.00 367,720.00 61.00 386,740.00
Main, BFM #2
4 -24-Inch Diameter Water 435 LF 62.00 26,970.00 66.00 28,710.00 71.00 30,885.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 223.00 21,185.00 250.00 23,750.00 187.00 17,765.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 100.00 9,000.00 150.00 13,500.00 122.00 10,980.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 2,100.00 8,400.00 2,725.00 10,900.00 2,400.00 9,600.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 3,500.00 21,000.00 4,500.00 27,000.00 5,150.00 30,900.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 5,000.00 40,000.00 6,250.00 50,000.00 6,700.00 53,600.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 1,500.00 21,000.00 2,895.00 40,530.00 1,600.00 22,400.00
11 Field Tile Replacement, 100 LF 15.00 1,500.00 17.00 1,700.00 13.00 1,300.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 30.00 1,500.00 42.00 2,100.00 33.00 1,650.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 75.00 3,750.00 75.00 3,750.00 80.00 4,000.00
18" and Larger
1 1 .
Glenbrook Excavating Szabo Contracting Lake County Grading
Item Description, Estimated Unit Total Unit Total Y..Bit Total
No. Pnit of Measure Quantity Price Amount Eau Amount Price AMOIli
14 Seeding 3.0 AC 4,000.00 12,000.00 4,400.00 13,200.00 2,000.00 6,000.00
15 Surface Replacement, 35 SY 35.00 1,225.00 6.00 210.00 12.00 420.00
Aggregate
16 Surface Replacement, 480 SY 37.00 17,760.00 21.00 10,080.00 19.00 9,120.00
Bituminous Concrete
17 Temporary Surface 480 SY 17.00 8,160.00 4.00 1,920.00 10.00 4,800.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 150.00 1,500.00 125.00 1,250.00 150.00 1,500.00
19 Granular Trench 400 TONS 25.00 10,000.00 25.00 10,000.00 31.00 12,400.00
Stabilization
TOTAL BASE BID AMOUNT 905,892.50 919,110.00 938,987.50
W:E04BDTB3.WP
cok irmik Irk.
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
Gerardi Sewer & Water j:_ T.tnaPn & Sono, Trine Construction
Item Description, Estimated Unit Total Unit Total !hit Total
NZ._ unit of Measure Quantity Price &M at Price Amount Price Muni
1 12-Inch Diameter Water 65 LF 35.56 2,311.40 35.00 2,275.00 30.00 1,950.00
Main, BFM #2 c
2 20 Inch Diameter Water 6,715 LF 50.00 335,750.00 50.50 339,107.50 49.80 334,407.00
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 59.00 374,060.00 60.00 380,400.00 57.80 366,452.00
Main, BFM #2
4 24-Inch Diameter Water 435 LF 65.00 28,275.00 73.00 31,755.00 69.28 30,136.80
Main, BFM #4
5 20-Inch Diameter Water 95 LF 265.00 25,175.00 220.00 20,900.00 267.22 25,385.90
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 115.00 10,350.00 90.00 8,100.00 79.22 7,129.80
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 1,875.25 7,501.00 2,500.00 10,000.00 2,318.00 9,272.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 3,785.45 22,712.70 4,800.00 28,800.00 4,541.00 27,246.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 5,575.65 44,605.20 6,500.00 52,000.00 6,600.00 52,800.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 2,740.00 38,360.00 1,600.00 22,400.00 2,550.00 35,700.00
11 Field Tile Replacement, 100 LF 21.80 2,180.00 30.00 3,000.00 30.00 3,000.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 38.00 1,900.00 35.00 1,750.00 45.00 2,250.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 77.55 3,877.50 40.00 2,000.00 65.00 3,250.00
18" and Larger
Gerardi Sewer & Water H. Linden & Sons Trine Construction
Item Description, Estimated Unit Total Unit Total Unit Total
No. Unit of Measure Quantity Price Amount Price Amount Price Amoun
14 Seeding 3.0 AC 10,000.00 30,000.00 4,000.00 12,000.00 12,000.00 36,000.00
15 Surface Replacement, 35 SY 5.25 183.75 3.00 105.00 12.00 420.00
Aggregate
16 Surface Replacement, 480 SY 16.50 7,920.00 23.00 11,040.00 20.00 9,600.00
Bituminous Concrete
17 Temporary Surface 480 SY 7.70 3,696.00 7.00 3,360.00 18.00 8,640.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 300.00 3,000.00 70.00 700.00 100.00 1,000.00
19 Granular Trench 400 TONS 9.00 3,600.00 10.00 4,000.00 14.75 5,900.00
Stabilization
TOTAL BASE BID AMOUNT 945,457.55 933,692.50 960,539.50
W:E04BDTB4.WP
ir 4rmik C
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
Vincent Divito Inc Elmwood Enterprises George Kennedy Constr
Item Description, Estimated Unit Total Unit Total Unit Total
Unit of Measure Quantity Price Amount Price Amount Price Amount
1 12-Inch Diameter Water 65 LF 43.00 2,795.00 45.00 2,925.00 75.00 4,875.00
Main, BFM #2
2 20 Inch Diameter Water 6,715 LF 54.00 362,610.00 58.00 389,470.00 60.00 402,900.00
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 64.00 405,760.00 65.00 412,100.00 63.00 399,420.00
Main, BFM #2
4 24-Inch Diameter Water 435 LF 88.00 38,280.00 75.00 32,625.00 77.00 33,495.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 274.00 26,030.00 280.00 26,600.00 185.00 17,575.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 115.00 10,350.00 150.00 13,500.00 55.00 4,950.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 2,100.00 8,400.00 2,000.00 8,000.00 2,900.00 11,600.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 4,000.00 24,000.00 5,300.00 31,800.00 5,200.00 31,200.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 5,000.00 40,000.00 6,700.00 53,600.00 7,500.00 60,000.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 1,700.00 23,800.00 1,600.00 22,400.00 3,400.00 47,600.00
11 Field Tile Replacement, 100 LF 15.00 1,500.00 26.00 2,600.00 30.00 3,000.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 20.00 1,000.00 39.00 1,950.00 45.00 2,250.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 25.00 1,250.00 51.00 2,550.00 60.00 3,000.00
18" and larger
Vincent Divito Inc Elmwood Enterprises George Kennedy Constr
Item Description, Estimated Unit Total Unit Total Unit Total
No. Unit of Measure Quantity Price Amount Price Amount Price Amount,
14 Seeding 3.0 AC 2,000.00 6,000.00 4,000.00 12,000.00 2,000.00 6,000.00
15 Surface Replacement, 35 SY 4.00 140.00 100.00 3,500.00 12.00 420.00
Aggregate
16 Surface Replacement, 480 SY 34.00 16,320.00 50.00 24,000.00 27.00 12,960.00
Bituminous Concrete
17 Temporary Surface 480 SY 5.00 2,400.00 25.00 12,000.00 20.00 9,600.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 25.00 250.00 200.00 2,000.00 100.00 1,000.00
19 Granular Trench 400 TONS 8.00 3,200.00 12.00 4,800.00 20.00 8,000.00
Stabilization
TOTAL BASE BID AMOUNT 974,085.00 1,058,420.00 1,059,845.00
W:E04BDTB5.WP
Irm' Irmk 4rmk,
CITY OF ELGIN, ILLINOIS
1992 WATER DISTRIBUTION SYSTEM IMPROVEMENTS
WEST ZONE - PHASE II
Kenny Construction Kovilic Constr Co. Mosele & Assoc.. Inc,
Item Description, Estimated Unit Total Unit Total Unit Total
NO.._ Unit of Measure Quantity Price Amount Price Amount Price Amount
1 12-Inch Diameter Water 65 LF 70.00 4,550.00 62.00 4,030.00 90.00 5,850.00
Main, BFM #2
2 20 Inch Diameter Water 6,715 LF 70.00 470,050.00 68.00 456,620.00 94.00 631,210.00
Main, BFM #2
3 24-Inch Diameter Water 6,340 LF 75.55 478,987.00 80.00 507,200.00 105.00 665,700.00
Main, BFM #2
4 24-Inch Diameter Water 435 LF 110.00 47,850.00 100.00 43,500.00 122.00 53,070.00
Main, BFM #4
5 20-Inch Diameter Water 95 LF 375.00 35,625.00 411.00 39,045.00 250.00 23,750.00
Main Crossing (Bore and
Jack) with 30-Inch Casing
6 20-Inch Diameter Water 90 LF 230.00 20,700.00 411.00 36,990.00 150.00 13,500.00
Main Crossing (Open Cut)
with 30-Inch Casing
7 5-Foot Diameter Valve 4 EA 3,200.00 12,800.00 2,502.00 10,008.00 3,000.00 12,000.00
Vault with 12-Inch Gate
Valve
8 6-Foot Diameter Valve 6 EA 4,200.00 25,200.00 5,356.00 32,136.00 5,300.00 31,800.00
Vault with 20-Inch
Butterfly Valve
9 7-Foot Diameter Valve 8 EA 6,400.00 51,200.00 7,867.00 62,936.00 6,700.00 53,600.00
Vault with 24-Inch
Butterfly Valve
10 Fire Hydrant Assembly 14 LF 1,700.00 23,800.00 1,875.00 26,250.00 1,750.00 24,500.00
11 Field Tile Replacement, 100 LF 40.00 4,000.00 25.00 2,500.00 40.00 4,000.00
4"-8" Diameter
12 Field Tile Replacement, 50 LF 50.00 2,500.00 37.00 1,850.00 80.00 4,000.00
10"-15" Diameter
13 Field Tile Replacement, 50 LF 70.00 3,500.00 50.00 2,500.00 160.00 8,000.00
18" and Larger
,
Kenny Construction Kovilic Constr Co. Mosele & Assoc.. Inc.
Item Description, Estimated Unit Total Unit Total (AA Total
No. Unit of Measure Quantity Price Amount Price Amount Price Amount
14 Seeding 3.0 AC 11,900.00 35,700.00 5,971.00 17,913.00 6,500.00 19,500.00
15 Surface Replacement, 35 SY 9.00 315.00 10.00 350.00 11.00 385.00
Aggregate
16 Surface Replacement, 480 SY 32.00 15,360.00 19.00 9,120.00 24.00 11,520.00
Bituminous Concrete
17 Temporary Surface 480 SY 12.00 5,760.00 16.00 7,680.00 12.00 5,760.00
Replacement, Bituminous
Concrete
18 Rock Excavation 10 CY 220.00 2,200.00 218.00 2,180.00 300.00 3,000.00
19 Granular Trench 400 TONS 14.00 5,600.00 13.75 5,500.00 60.00 24,000.00
Stabilization
TOTAL BASE BID AMOUNT 1,245,697.00 1,268,308.00 1,595,145.00
W:EO480186.MP