Loading...
HomeMy WebLinkAbout94-247 Resolution No. 94-247 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH GAFFNEY' S PMI FOR THE LARKIN EDISON SIGNAL IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Gaffney's PMI for the Larkin Edison Signal Improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard B. Helwig, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: September 14, 1994 Adopted: September 14, 1994 Omnibus Vote: Yeas 7 Nays 0 Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT #8371 LARKIN EDISON SIGNAL IMPROVEMENTS CHANGE ORDER NO. 1 SCOPE:This change order covers additional work necessary to: 1 . complete the base course repair earlier than planned completion. Base repairs were originally planned to be completed in bituminous . However, by using concrete base course instead we were able to provide a safer condition sooner for the motoring and pedestrian traffic . Awarded contract quantities were reduced as the Change Order item lx, Concrete Base Course replaced the respective contract item. 2 . provide the correct sized curb and gutter. The plans indicated that the existing curb and gutter had a twelve inch flag. However, once pavement grinding was complete, the gutter flag was found to be eighteen inches . Please note that item 8, Combination Concrete Curb and Gutter, Type B6 . 12 was replaced with Change Order item 2x, Combination Concrete Curb and Gutter, Type B6 . 18 to match the larger curb and gutter section. 3 . provide required manhole adjustments . Three manholes were overlooked during the preparation of the plans . 4 . provide for the repair of a City street cut. 5 . provide for the push of conduit under the street instead of trenching. Please note item 33, Galvanized Conduit, Trench 1-1/4 inch was partially replaced with Change Order item 6x, Galvanized Conduit, Push 1-1/4 inch. REASONS FOR CHANGE: This Change Order #1 will account for the additional pay items which are due to circumstances not reasonably foreseeable at the time the contracts were signed. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD lx. P.C.C. Base Course 9-1/2 inches, 65 SY $1,917 . 50 2x. Combination Conc. Curb and Gutter, Type B6 . 18 199 LF $3, 781 . 00 3x. Cast Iron Adjustment Rings 2-1/2 2 EA $169 .50 4x. Cast Iron Adjustment Rings 2 1 EA $56 .50 5x. Repair Existing Patch 1 EA $113 . 00 6x. Galvanized Conduit Push 1-1/4 356 LF $3,916 . 00 The total amount of the above items is $9 , 953 .50 . This change order increases the contract amount from $112,540 . 00 to $122,493 .50 . i LARKIN EDISON SIGNAL IMPROVEMENTS CHANGE ORDER NO. 1 August 10, 1994 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this /6--'' v day of ,Q,d1;t2.i01.. 11993 . Recommended: iiiiiiIERING D .Vi;j„KI' r By. lid,,,Adrillied ,.- -e , 4; ---r ,,,-? ffi 6 ✓ / .�a "'" Accepted: Party of the Seco (Contractor))09 BY: Gt-L22..) Ti le: UID Date: S-i7 - + Approved: CITY OF ELGIN Party of the First Part (Owner) By: I� Title: L'..: Date: 9 if.r"/9'y • in Ell 1 ,� ° E��,� \ Agenda Item No. 10 �4/f August 16, 1994 TO: Mayor and Members of the City Council FROM: Richard B. Heiwig, City Manager SUBJECT: Larkin/Edison Traffic Signals Change Order No. 1, Final Payment and Acceptance PURPOSE This memorandum will provide the Mayor and City Council with information to consider the adjustments to plan quantities, Change Order No. 1 , Final Payment and Acceptance of the subject project. BACKGROUND The subject project was awarded to Gaffney' s PMI at the December 12, 1992 Council Meeting in the amount of $112,540 . 00 . The work on this project has been completed with the exception of one part, the radio interconnect. The radio interconnect is the device needed to communicate with the signal controller from a central computer. The project has been substantially complete since October of 1993 but due to the radio interconnect the project has been kept open. Unfortunately it does not appear that this device will become available in the near future, therefore the device has been deleted from the contract. Please note on the attached copy of the engineer' s final pay estimate item 61 , the Radio Interconnect Interface Unit, is deleted. Engineering does expect this item to become available in late 1995 . Several pay items were added to the contract. The added items and the adjustments were necessary to complete the project in a satisfactory manner and were not foreseeable at the time the contract was signed. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED r None. Mayor and Members of the City Council r August 18, 1994 Page 2 FINANCIAL IMPACT Change Order No. 1 increases the contract amount by $9,953 . 50 . Adjustments to contract quantities decreased the contract amount by $3, 892 . 95 . The net result is an increase of $6 , 060 .55 to the awarded contract amount of $112,540 . 00 for a final project cost of $118, 600 .55 . There are adequate funds available in the 1992 Project Bond Fund to cover the additional costs . LEGAL IMPACT A resolution is required to approve the proposed change order. RECOMMENDATION It is recommended that the City Council approve the Change Order No. 1, the Final Pay Estimate and accept the completed project. A copy of the final payout and Change Order No. 1 are attached for consideration. Respectfully bm' tted, , ayivJ . v), (aA{/iw James L. Kristiansen Li/Public Works Director lRard B. Helwig c City Manager . JE/do Attachment • r ..... CITY OF ELGIN LARKIN/EDISON TRAFFIC S16NALS PAY ESTIMATE NO. 3 6AFFNEY PMI Date 03-Auo-94 r ITEM ITEM UNIT PLAN ADDED DELETED ADJUSTED COMPLETED UNIT NO. QUANTITY OUANTITY OUANTITY QUANTITY QUANTITY PRICE COST 1 ; EARTH EXCAVATION ; CY 90.0 : : 90.0 : 90.0 : $25.00 : $2,250.00 2 ; SUB GRAN MAT 8 4 : SY : 66.0 : ; 1.0 65.0 : 65.0 ; $5.80 ; $377.00 3 ; TOP SOIL PLACE 4 ; SY 65.0 ; 312.0 ; 377.0 : 377.0 : $3.15 : $1,187.55 4 ; BIT BASE CSE 10 1/2 SY : 66.0 : ; 66.0 ; 0.0 : $31.50 ; $0.00 S BIT MAILS PR CT ; 6L : 320.0 : 70.0 250.0 ; 250.0 : $1.55 : $387.50 6 ; BIT CON SC 'C" CLI T2 TN 288.0 : 109.0 : 397.0 : 397.0 : $42.00 : $16,674,00 7 ; CB ADJUST : EA 1.0 : 1.0 : 1.0 ; $210.00 ; $210.00 8 ; COMB CCk6 TB6.12 LF 190.0 : 190.0 : 0.0 : $15.75 ; $0.00 9 ; BIT SURF REM VAR DP : SY : 3,127.0 : 335.0 : 3462.0 : 3462.0 : $2.30 : $7,962.60 10 ; DRIVE PAVEMENT REM SY 29.0 : 6.0 : 35.0 : 35.0 : $9,45 : $330.75 11 ; COMB CURB GUTTER REM , LF 210.0 : 11.0 : : 221.0 : 221.0 : $6.30 : $1,392.30 12 : SIDEWALK REM : SF 750.0 : 611.0 : 1361.0 : 1361.0 : $1.05 : $1,429.05 13 ; PCC DRIVEWAY PAVT 7 : SY : 28.0 : 2.0 : 30.0 : 30.0 : $26.25 ; $787.50 14 ; PC CONC SIDEWALK 5 : SF 610.0 : 1034.0 : 1644.0 : 1644,0 : $3.15 : $5,178.60 . 15 ; SODDING : SY 65.0 : 312.0 ; 377.0 : 377.0 ; $5.00 : $1,885.00 16 ; SH A IF 3S BM ; EA : 1.0 : : 1.0 : 1.0 ; $465.00 $465.00 17 ; SH A IF 36 MAM EA : 4.0 : ; : 4.0 : 4.0 : $545.00 $2,180.00 18 ; SH A IF 5S BM EA 2.0 : 1.0 ; : 3.0 : 3.0 : $653.00 : $1,959.00 19 ; SH A IF 5S MAM EA 3.0 ; : 3,0 : 3.0 : $760.00 : $2,280,00 OW PED SH IF BM ; EA 2.0 : ; : 2.0 : 2.0 : $365.00 $730.00 RED SH 2F BM : EA 3.0 : : : 3.0 : 3.0 ; $685.50 : $2,056.50 22 ; TS BACKPLATE LOUVERED : EA 7.0 : : ; 7.0 : 7.0 $119.00 ; $833.00 23 ; TS POST F 14 : EA 1.0 ; ; ; 1.0 : 1.0 ; $535.00 : $535.00 24 : TS POST F 16 EA 1.0 ; ; 1.0 : 1.0 $595.00 : $595.00 25 ; S MAA & P 26 EA 1.0 : ; 1.0 : 1.0 : $2,060.00 : $2,060.00 26 ; S MAA & P 28 ; EA ; 1.0 ; 1.0 1.0 : $2,080.00 : $2,080.00 27 ; S COMB MAA & P 24 ; EA 1.0 ; ; ; 1.0 : 1.0 ; $2,930.00 ; $2,930.00 28 ; S COMB MAA & P 34 EA 1.0 : ; 1.0 ; 1.0 $3,425.00 $3,425.00 29 ; FAC STD S4 6P T4 CAB ; EA : 1.0 : ; ; 1.0 : 1.0 $8,450.00 ; $8,450.00 30 ; IND L DET AMP ; EA 7.0 ; ; ; 7.0 : 7.0 ; $170.00 ; $1,190.00 31 1 DET LOOP T1 LF ; 892.0 ; 174.0 : 718.0 ; 718.0 ; $7.60 ; $5,456.80 32 ; PED PUSHBUTTON ; EA ; 5.0 ; ; ; 5.0 ; 5.0 ; $138.50 : $692.50 33 ; 6ALVS CON T 1 1/4 ; LF ; 523.0 : ; 405.0 118.0 ; 118.0 ; $4.00 : $472.00 34 ; 6ALVS CON T 1 1/2 ; LF 21.0 ; 5.0 ; ; 26.0 26.0 $5.00 ; $130.00 35 :6ALVS CON 1 2 ; LF : 35.0 : : 10.0 25.0 ; 25.0 ; $5.50 I $137.50 36 ; 6ALVS CON T 2 1/2 1 LF 104.0 ; 21.0 ; : 125.0 ; 125.0 : $7.75 $968.75 37 ; 6ALVS CON T 3 ; LF ; 4.0 ; 4.0 : 8.0 : 8.0 ; $9.50 ; $76.00 38 ; 6ALVS CON 1 4 ; LF 58.0 : : 15.0 ; 43.0 : 43.0 $14.50 ; $623.50 39 ; 6ALVS CON T 5 : LF ; 4.0 ; : 1.0 ; 3.0 : 3.0 ; $23.50 ; $70.50 40 ; 6ALVS CON P 2-1/2 ; LF 62.0 ; ; 9.0 : 53.0 ; 53.0 ; $15.50 $821.50 41 : RCVS CON P 3 ; LF 44.0 9.0 ; ; 53.0 ; 53.0 ; $17.00 I $901.00 42 ; 6ALVS CON P 4 ; LF 43.0 ; 9.0 ; ; 52.0 ; 52.0 $19.00 $988.00 43 ; U D W/O CABLE T 1 ; LF 87.0 1 14.0 ; 101.0 : 101.0 ; $1.80 $181.80 44 ; ELCBL C 4 2C ; LF 22.0 ; 5.0 : 27.0 : 27.0 ; $2.50 ; $67.50 eak' ELCBL C 14 2C ; LF ; 730.0 ; 78.0 ; 808.0 ; 808.0 ; $0.85 ; $686.80 ; ELCBL C 14 3C I LF : 1,045.0 122.0 ; ; 1167.0 : 1167.0 : $0.90 ; $1,050.30 4/ ; ELCBL C 14 5C I LF ; 623.0 : 14.0 : 637.0 : 637.0 ; $0.95 ; $605.15 48 ; ELCBL C 14 7C LF ; 943.0 : 54.0 : 997.0 : 997.0 I $1.00 ; $997.00 49 ; ELCBL C 14 2C TN SH LF ; 1,141.0 ; 56.0 1085.0 : 1085.0 : $0.95 : $1,030.75 50 ; SERV INSTALL TY C ; EA ; 1.0 ; ; ; 1,0 : 1.0 : $580.00 : $580.00 MOM CITY OF ELGIN LARKIN/EDISON TRAFFIC SIGNALS PAY ESTIMATE NO. 3 GAFFNEY PM! Date 03-Aug-94 r 51 : CONC FON 1Y A : LF 6.0 ; ; : 6.0 ; 6.0 : $130.00 ; $780.00 52 ; CONC FON TY D ; LF 3.5 ; 3.5 ; 3.5 ; $180.00 ; $630.00 53 ; CONC FDN TY E 24D ; LF 30.0 ; 30.0 30.0 ; $95.00 : $2,850.00 54 ; CONC FDN TY E 30D ; LF 15.0 ; 15.0 ; 15,0 ; $100.00 ; $1,500.00 55 ; CONC HANDHOLE ; EA 6.0 ; ; 6.0 ; 6.0 ; $560.00 ; $3,360.00 56 CONC 081 HANDHOLE ; EA ; 1.0 ; 1.0 ; 1.0 $1,000.00 : $1,000.00 57 ; TRENCH & BACKFILL ; LF 836.0 ; 436.0 : 400.0 ; 400.0 ; $1.80 : $720.00 5B SIGN PANEL T 1 ; SF ; 41.0 ; ; 41.0 ; 41.0 ; $30.00 : $1,230.00 59 ; METAL POST T A ; LF 12.0 ; ; ; 12.0 ; 12.0 $10.00 : $120,00 60 ; WOOD SIGN SUPPORT ; LF 14.0 ; 14.0 ; 14.0 ; $10.00 ; $140.00 61 ; RADIO INTERFACE UNIT ; EA ; 1.0 ; ; 1.0 : 0.0 ; ; $7,710.00 : $0.00 62 ; ELCBL C 600V 1/C 10 ; LF ; 568.0 ; 132.0 ; : 700.0 ; 700.0 ; $0.50 : $350.00 63 ; TR & BKFILL F RDWY LT LF : • B1.0 ; ; 5.0 ; 76.0 ; 76.0 ; $1.80 : $136.80 64 ; CON T 2 6ALVS LF 81.0 ; ; 5.0 : 76.0 ; 76.0 $5.50 $418.00 65 ; CON P 2 6ALVS LF 152.0 4.0 ; : 156.0 ; 156.0 ; $11.50 : $1,794.00 66 ; LIGHT POLE FDN ; EA : 1.0 ; ; 1.0 ; 1.0 : $650.00 ; $650.00 67 LT P S 45MH BMA ; EA 1.0 ; 1.0 ; 1.0 : $1,243.80 : $1,243.80 68 ; LUM SV HOR MT PC 250W ; EA 3.0 ; 3.0 3.0 $415.00 $1,245.00 69 ; THPL PVT MX LTR & SYM ; SF 110.0 1.0 ; 109.0 109.0 : $2.50 ; $272.50 70 ; 'NFL PVT MK LINE 4 LF ; 1,572.0 ; 287.0 : 1285.0 ; 1285.0 ; $0.65 ; $835.25 71 ; THPL PVT MK LINE 6 ; LF 840.0 ; ; 102.0 : 738.0 ; 738.0 : $1.00 : $738.00 72 ; THPL PVT MK LINE 24 ; LF 98.0 : 6.0 ; 92.0 ; 92,0 : $3.00 : $276.00 ttttt ; Stitt : snit ; Stitt ; tint 0.0 ; tttit : Stitt tin t ellik TOTALS $108,647.05 MISCELLANEOUS EXTRAS VALUES 0Ix PCC BASE CSE 9-1/2 SY 65.0 @ $29.50 ; $1,917.50 02x COMB CCU 186.18 LF 199.0 @ $19.00 ; $3,781.00 03x C I ADJUST RINGS 2 1/2 EA 2.0 @ $84.75 $169.50 04x C I ADJUST RINGS 2 EA 1.0 @ $56.50 $56.50 05x REPAIR EXISTING PATCH EA 1.0 @ $113.00 $113.00 06x 6ALVS CON P 1 1/4 LF 356.0 @ $11.00 $3,916.00 @ $0.00 @ ; $0.00 @ $0.00 , TOTAL EXTRAS $9,953.50 '' TOTAL VALUE COMPLETED WORK $118,600.55 RETAINA6E $0.00 BALANCE DUE $118,600.55 MISCELLANEOUS DEBITS VALUES PAY ESTIMATE NO. 1 : $65,769.30 ; PAY ESTIMATE NO. 2 $44,831.25 ; CITY OF ELGIN LARKIN/EDISON TRAFFIC SIGNALS PAY ESTIMATE NO. 3 GAFFNEY PMI Date 03-Aug-54 r TOTAL DEBITS $110,600.55 NET AMOUNT DUE $8,000.00 $1111$$$$$$$$I t$$11$ttitiititttttitit tttttitt tti ttit itf ttil$$$$$$$$$$$$t itt1111 1ttt titttt lttt ttttttt1111ittiil2itttttttttttt SIGNED 1994 TITLE HLR SIGNED 1994 TITLE CONTRACTOR APPROVED 1994 • TITLE CITY OF ELGIN r r