Loading...
HomeMy WebLinkAbout93-65 Resolution No. 93-65 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH WALKER PARKING CONSULTANTS/ENGINEERS, INC. FOR THE RIVERSIDE PARKING AREA WHEREAS, the City of Elgin has hezetofore entered into a contract with Walker Parking Consultants/Engineers, Inc. for inspection services for demolition of the Riverside parking area; and WHEREAS, it is necessary and deSirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ GeOrcie VanDeVoorde George VanDeVoorde, Mayor Presented: March 10, 1993 Adopted: March 10, 1993 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS RIVERSIDE PARKING AREA - INSPECTION SERViCES FOR DEMOLITION CHANGE ORDER NO. 1 SCOPE: This Change Order No . 1 cover the extra work necessary to complete the demOlition inspection for the Riverside Parking Area. The consultant for this project Walker Parking Consultants/Engineers, Inc. of Elgin, Illinois . REASONS FOR CHANGE: This change order is required to pay the costs associated with the increase cost of the inspection of the demolition of the Riverside Parking Are . The original cost was an estimate by the staff and the consultant of the time necessary to complete the work through October and was not to exceed $25,000 . The contract took a little longer than anticipated. The work included in this change order was not known and was not reasonably foreseeable at the time of the letting of the contract. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ?he amount of the contract will be revised as follows : ITEM AMOUNT ADD Work performed from November 1 through December 1992 . $ 3,962 .50 Travel and Testing Services . $ 157 .40 TOTAL CHANGE FOR CHANGE ORDER NO. $ 4,119.90 - • -1.- CHANGE ORDER NO. 1 February 18, 1993 Page 2 The present contract with Walker Parking Consultants/Engineers, Inc . , is for $25,000 .00 . By reason of tnis Change Order No. 1, the contract for the Inspection of the R'verside Parking Area Demolition will be increased in the amou t of Four thousand one hundred nineteen and 90/100 dollars ( $4 ,119 . 90) , the total contract value being Twenty nine thousand one hundred nineteen and 90/100 dollars ( $29, 119 . 90) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this //,ik- day of A ce.A.e_i; , 199S. Recommended: ENGINEEpING DIVISION ,--- / 7 By: / r_., , A , . - 4 ..- , -- Date: €'//295 r , Accepted: WALKER PARKING CONSULTANTS/ENGINEERS, INC. , Party of the Second Part (Consultant) BY: Title: Vic E--- eqe---5 i f..)o-.Nr" Date: 3/zz 16i3 Approved: CITY OF ELGIN Party of the Part ,11%. Part (Owner) By: i 2; _ • , IP r rj-mh, Title: ' - i to---w4 . i Date: 3 • � n °FE Agenda Item No. ,(cpa ty \_. February 18, 1993 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Riverside Deck Demolition Change Order No. 1 for Construction Engineering Services PURPOSE: This memorandum will provide .he Mayor and Council with information to consider Change Ord:r No. 1 to the contract with Walker Parking Consultants/Enginee .s, Inc. , (Walker) for Construction Services on the Riverside Deck Demolition. BACKGROUND: The City Council authorize• a contract with Walker to provide inspection of the demolition and repair of the Riverside Parking Area at their August 2, 1992 meeting. The amount of the engineering inspection co tract was estimated at that time because the level of effort n:cessary was not known. However, it was a not to exceed amount or engineering services through October, 1992 . The time necess. ry for the contractor, Illinois Hydraulic, to complete the wor was more than originally estimated and extended into December, 1992 . There were some additional engineering costs ncurred by Walker in October and they are not included in th s change order. This change order is only for work performed by Walker after October 31, 1992 . FINANCIAL IMPACT: The original estimat -d cost of the engineering inspection services was $25 000.00 . The cost for the necessary extra inspection work in ovember and December was $4, 119 . 90. This will result in a final cost for these services of $29, 119 .90. A copy of Change Order No. 1 is attache• for your consideration. r . . r Mayor and Member of the City Council February 18, 1993 Page 2 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Ch nge Order No. 1 to the contract for Inspection Services on the iverside Deck Demolition project with Walker Parking Consultants/ ngineers, Inc. , in the amount of $4, 1119. -- --- t , ) Larry - . -ice, , Manager attachment r r •