HomeMy WebLinkAbout93-52 Resolution No. 93-52
RESOLUTION
APPROVING CHANGE ORDER NO. 4 IN THE CONTRACT WITH
SZABO CONTRACTING FOR THE BIG TIMBER/TYLER CREEK INTERCEPTOR
WHEREAS, the City of Elgin has heretofore entered into a
contract with Szabo Contracting for the Big Timber/Tyler Creek
interceptor; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 4,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry ]. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 4, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: February 24, 1993
Adopted: February 24 , 1993
Omnibus Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
CDI CLARK DIETZ, INC.
ELGIN, ILLINOIS
BIG TIMBER/TYLER CREEK INTERCEPTOR
CHANGE ORDER NO. 4
SCOPE: This Change Order No. 4 covers additional changes in the scope
of work at the Big Timber/Tyler Creek Interceptor that was not
reasonably foreseeable at the time the contract was signed and are in
the best interest of the City. The items covered in this change order
are for 1) sanitary sewer manhole and 2) additional cost for sanitary
sewer tunneling.
This contract for construction is with Szabo Contracting, Elmhurst,
Illinois.
REASONS FOR CHANGE:
Item 1.
The project was originally designed and bid with the installation of the
36-inch diameter sewer located in a straight east-west alignment from
MH#16 to MH#26. After the project was bid, the route had to be changed
to accommodate location conditions dictated by the owner of the Valley
Creek property. The new route, agreed to in the signed easement,
parallels the north bank of Tyler Creek from MH#16 to MH#24 (Lyle Avenue
to Randall Road) . The numerous changes of direction with the new route
resulted in the addition of a manhole in a depth range which were not
contemplated in the original bid. The alignment change is in the best
interest of the City in order to allow the Safety Kleen Corporation to
connect their new facility in an expedient manner. This will result in
a net addition to the contract.
Item 2.
The project was originally designed and bid with the installation of the
36-inch diameter sewer installed by bore and jack method with a 48-inch
diameter casing beneath the C&NW and Metra RR tracks at the Big Timber
Commuter Station on Lyle Avenue. After the project was bid, an
exploratory excavation on the south side of the tracks revealed wet sand
with 4-8 inch diameter cobble stone in the direct path of the bore and
jack. These soil conditions would prevent the casing pipe from
remaining at the proper elevation. The soil conditions encountered were
not discernible from the contract documents or site inspection. It was
decided that in order to ensure the pipe could be installed at the
correct elevation, a larger diameter casing was needed. Due to the
presence of the 4-8 inch diameter cobble stone, the City of Elgin
decided it would be in their best interest to install the 60-inch casing
with the tunneling method instead of bore and jack with the 48-inch
diameter casing. The tunneling method with the 60-inch diameter casing
will also allow the Safety Kleen Corporation to connect their new
facility in a timely manner. This will result in a net addition to the
contract.
Clark Dietz, Inc.
1817 S. Neil, Suite 100
P.O. Box 676
Champaign, IL 61824-0676
217/373-8900 ENGINEERS ARCHITECTS
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
The amount of the contract will be revised as follows:
Item 1.
Add one (1) 6-foot diameter manhole, 6-ft. to 9-ft. depth range at
$3,000/ea.
Total Add = $3,000.00
Item 2.
Add 170 lineal feet of 36-inch diameter sanitary sewer crossing (tunnel)
including 60-inch diameter casing at $445/l .f.
Total Add = $75,650.00
TOTAL NET ADDITIONAL COST = $78,650.00
The original contract with Szabo Contracting was for $1,769,562.50 (one
million, seven hundred sixty-nine thousand, five hundred sixty-two and
50/100 dollars) . Previous change orders amounted to $153,736.35 (one
hundred fifty-three thousand, seven hundred thirty-six and 35/100
dollars) . With this change order amounting to $78,650.00 (seventy-eight
thousand, six hundred fifty and 00/100 dollars) , the total contract will
be for $2,001,948.85 (two million, one thousand, nine hundred forty-
eight and 85/100 dollars) .
OTHER CONTRACT PROVISIONS: All other provisions shall remain the same.
Agreed to this day of , 1993.
T:0203-D1.WP
Recommended:
CLARK DIETZ, INC.
Engineers and Architects
By: dc,"--ce-4,"/Pieco0(e-Q1
Date: ./ 4.7 /4/"-
ELGIN
9'3ELGIN ENGINEERING DEPARTMENT
By: )6iii:04i-4 1 , / 9ie )‘--se
Title: �� r
' 0 , 1' '3 "
///// D-
ate: 02 047 '2,7--1_7- ,;() 5
Accepted:
SZABO CONTRACTING
Party of the Second Part (Contractor)
By:
Title:
Date:
Approved:
CITY OF ELGIN -
Party of the First Part (Owner)
/
By: . G.c, //(---
..,--c_.-.`G-
Title: lilk.A._:
Date:
02 o2S— /
T:0203-D1.WP
' '8' 708 530 2887 SZABO_CONTP CTNG 01/06/93 10:34 P01
43ZA8O CONTE A<CTSNG , =1W.
442 W. LAKE STREET
ELMHURST, ILL. 60126
(708) 530-4700
Mr. Charles E. Park January 6, 1993
Clark-Dietz, Inc.
P.O. Box 676
Champaign, IL. 61824-0676
Re: Big Timber Tyler Creek Interceptor
04+7 of Agin/ Tllinnig
CHANGE ORDER REQUEST
1. Cost for 6' Dia. MH 6' to 9' Deep $ 3,000.00/EA
If you should have any questions, please contact me.
Sincerely,
Frank Szabo, Jr.
President
FS,Jr/ask
S ZABO CONTRACTING , INC
442 W. LAKE STREET
ELMHURST, ILL. 60126
530-4700
FAX 530-2887
November 3, 1992
Mr. Marty Vogel
Clark Dietz , Inc.
1817 S. Neil, Suite 100
Champaign, IL. 61820
Re: Big Timber/Tyler Creek Interceptor,
City of Elgin, 60" Casing Installation
Under Big Timber Rd @ North Lyle
Dear Mr. Vogel:
The cost for the proposed installation of 100 LF of 60" O.D. x
.750" wall casing by Handmining and Jacking Method is
$1,220 .00/LF.
This price is $ 395.00 per LF cost increase over the originally
proposed 48" O.D. x .500" wall casing installed by Boring and
Jacking Method.
If you should have any questions, please call me.
Sincerely,
t,a
Frank Szabo, Jr.
President
FS,Jr/ask
SZABO CONTRACTNG , =NC _ JAN 2 8 i993
442 W. LAKE STREET ! L
ELMHURST, IL. 60126
(708) 530-4700
Mr. Marty Vogel January 22 , 1993
Clark Dietz, Inc.
1817 S. Neil, Suite 100
Champaign, IL. 61820
Re: City of Elgin
Big Timber/Tyler Creek Interceptor
Metra Tracks Crossing
Dear Marty:
Enclosed please find correspondence from the boring contractor
L.J. Keefe Co. , Inc. regarding the proposed bore under the metra
tracks.
He is requesting an additional $50.00 per LF to do this crossing
with a 60" tunnel boring machine. In view of the extremely
adverse soil conditions I respectfully request that his
recommendation is accepted.
Please review the enclosed and should you need any additional
information please do not hesitate to contact me.
Respectfully,
Frank Szabo, Jr.
President
FS,Jr/ask
Enclosure
L.J. Keefe Co., Inc. o
704 W.Contra!Rd. "
Mount Proapeot, Illinois 80056 •
Tel(708) 677-7716
Fax(708) 677.3620
TQtiCt°µ
January 22, 1993
Mr. Frank Szabo
Szabo Contracting
442 West lake Street
Elmhurst, IL 60126
Re: METRA Crossing
Big Timber/Tyler Creek interceptor
City of Elgin, Illinois
Dear Frank:
Since the soil conditions for the subject crossing are similar to
the "Big Timber Road Crossing", (i.e. wet sand and cobbles on
top of a clay lens) , conventional auger boring will not be
possible. We recommend using a 60" Tunnel Boring Machine (THM)
to construct the tunnel. However, the water table must be 1 foot
below the invert of the casing in order to avoid the loss of
overburden.
The advantages of using the TEM include:
1. Its partially closed face can limit the inflow of
wet flowing sands.
2. it is much faster than hand mining.
3. It can control line and grade much more easily
than auger boring.
We are willing to construct the tunnel using a TEM for $50 more
per foot than our hand mine rate.
•
Very truly,
L. J. REEFE CO. , INC.
Lawrence J. Keefe, Sr.
President
i
•
•
Agenda Item No.
+1.416-41,"6.)-1
February 4, 1993
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: Big Timber/Tyler Creek Interceptor Sewer
Change Order No. 4
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider the subject Change Order No. 4 to
the contract with Szabo Contracting, Inc.
BACKGROUND: The work on the crossing of the Metra and Chicago &
NorthWestern Railroad tracks was stopped based on the soils
materials encountered on the south side of the right-of-way and
between the tracks. The material encountered in the area of the
tracks includes 6" to 12" diameter cobbles that make the
traditional jack and auger planned for this area not possible.
The contractor has requested that he be allowed to use a 60"
casing and a mining machine. This method will take less time
and will enable the contractor to cut through the rock
referenced above.
In addition to the above, the realignment of the sewer through
the Valley Creek property made it necessary to add a manhole at
a depth not contemplated in the original bid. A price was
obtained from the contractor and it is in line with the prices
of manholes of similar depths.
Change Order #4 and copies of correspondence from the contractor
are attached for your consideration.
FINANCIAL IMPACT: The additional cost for the machine mining
and new manhole will increase the cost of the contract by
$78,650. The current cost of the contract is $1,923,298.85. The
proposed new cost would be $2,001,948.85.
r
•
MAYOR AND MEMBERS OF
THE CITY COUNCIL
February 4, 1993
PAGE 2
RECOMMENDATION: It is recommended that the City Council
direct the City Manager and City Clerk to execute Change Order
No. 4 for the Big Timber/Tyler Creek Interceptor Sewer contract
with Szabo Contracting in the amount of $75,650.
Ale
Lar . Ri City Manager
Attachment
r
r