Loading...
HomeMy WebLinkAbout93-247 Resolution No. 93-247 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH EDAW, INC. FOR THE WALTON ISLAND IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with EDAW, Inc. for the Walton Island improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: September 8, 1993 Adopted: September 8, 1993 Vote: Yeas 6 Nays 1 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT : WALTON ISLAND IMPROVEMENTS CHANGE ORDER NO.1 SCOPE: This Change Order Number 1 covers the extra work necessary to complete subsurface exploration of Walton Islands and the Kimball Street Dam. The consultant for this project is EDAW, Inc. from Virginia. The subconsultant performing the structural analysis is Collins Engineering, Inc. of Chicago. REASONS FOR CHANGE: This Change order is required to pay the costs associated with the subsurface explorations indicated above. The scope of this work was not known at the time of the approval of this contract. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD CURRENT ADDITIONAL COSTS Walton Island Geotechnical Exploration $12,000,00 The present contract with. EDAW, Inc. is for $238,600.00 . By reason of this Change Order Number 1, the contract for the design and plan preparation of the Walton Island Improvements will be increased in the amount of twelve thousand and 00/100 dollars ($12 ,000 . 00) , the total contract value being two hundred fifty thousand six hundred and 00/100 dollars ($250,600.00) . CHANGE ORDER NO.1 August 31, 1993 Page Z OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this_ qday of t t- , 1990. Recommended: ENGI G DZ SIGN By: Date; Accepted: EDAW, Inc. Party of the Second Part (Consultant) By: ;��tm 6., ro,6&'� I Title: Date: 8�� ( S Approved: CITY OF ELGIN Party of the Part (Owner) By: / Title: Date: �/ 3 rEl • 111 Agenda Item No. August 18, 1993 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Change Order Number 1 to the Engineering Service Agreement with EDAW, Inc. for the Walton Island Improvements PURPOSE: This memorandum will provide the Mayor and Council with information to consider executing Change Order Number 1 with EDAW, Inc. This change order will provide for the subsurface exploration of Walton Islands and the Kimball Street Dam. BACKGROUND: The City Council awarded to EDAW, the Engineering Service Agreement on May 12, 1993. A component of this agreement was for the Engineer to develop a geotechnical program to obtain subsurface information. Such information will be required to complete the final engineering on the bridge abutments, canoe chute and edge hardening. This geotechnical information was not included in the original agreement because the extent of the exploration and the locations could not be ascertained until the preliminary engineering report was completed and reviewed by staff. The preliminary engineering report has been presented to staff and the specific features of the improvement have been selected subject to City Council approval. FINANCIAL IMPACT: The original cost of the engineering services was $238,600. Execution of Change Order Number 1 will increase the Engineering Service Agreement by $12,000.00 to a total of $250,600.00. A copy of the change order document is attached for your information. Mayor and Members of the City Council August 18, 1993 Page 2 RECOMMENDATION: It is recommended that the City Council approve Change Order Number 1 in the amount of $12,000 .00 and direct staff to execu necessary documents. Lar Ri 'ty Manager do Attachment