Loading...
HomeMy WebLinkAbout93-19 Resolution No. 93-19 RESOLUTION ACCEPTING THE PROPOSAL OF PLASTICASTERS, INC. FOR RECYCLED PLASTIC DIVIDERS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Plasticasters, Inc. for recycled plastic dividers, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: January 27, 1993 Adopted: January 27, 1993 Omnibus Vote: Yeas 6 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk AST- CASTERS, [INC. SOLID PLASTIC SHAPES CjD t''t] CITY OF ELGIN JANUARY 5,1993 150 DEXTER COURT ELGIN, ILLINOIS 60120 ATTN: MR. GREG BAYOR, DIRECTOR OF PARKS AND RECREATION PEI:), GREG, PERSUANT TO GRANT SIVE 78 FROM THE ILLINOIS DTARTIRTNT OF ENERGY AND NATURAL RESOURCES, COVING THE RECYCLED EROSION BLOCK PROJECT IN YOUR REQUEST OF APRIL 1992, aTH REGUARD TO OUR TERMS AND CONDITIONS. IN CONCLUSION OF DISCUSSIONS !ITH MR. MIKE SORAL OF YOUR CITY PURCHASING DrdARTMEVT OUR TERMS ARE: A. ON*HTRD WITH THE PURCHASE ORDEH B. ONE-THIRD UPON APPROVAL OF THE PRODUCT READY FOR INSTALLATION AT OUR MORRIS FACILITY. THIS TINE FRAME IS 30 TC 45 DAYS PROM THE RECEIPT OF YOUR EXECUTED PURCHASE ORDER C. ONE-THrlD(THE BALANCE) UPON COMPLETION OF THE INSTAL=ATIONS AS DEFIN2,2 IN THE REQUEST FOE BID OF APRIL 1992. WEATHER CONDITIONS P=ITTING CONCLUSION CF THE PROJECT SHOULD TAKE PLACE PRIOR TO THE END OF APRIL 1993. rE LOOK FORJARD TO AGAIN BEING OF SERVICE TO THE CITY OF ELGIN ITH REGARD TO REgYCL .0 PLASTIC PRODUCT APPLICATIONS. SI CEREL c/ge PLASTICASTERS INC. 960 E. North St. • Morris, Illinois 60450 • Ph. (815) 942-0760 • FAX: (708) 695-9891 EROSION BLOCK PROJECT Recycled Erosion Block/Retainer (Special note: all blocks are installed with epoxy coated reinforcing bars-. 4 per block 18" long x 5/8" diameter in predrilled locations) . 10 ' blocks : $85/6 ' blocks : $55 ) I . Complex ( 300 blocks) $25 , 500 A. ( 1) Softball Field #8 50 blocks/10 ' long (2) Softball Field #7 50 blocks/10 ' long (to stop erosion on warning track perimeter) • B. ( 1) BMX track (50 - 10 ' ) on sides of starting range to control erosion (2 ) BMX track (50 - 10 ' ) outside of track curved areas to control erosion (3) BMX track (50 - 10 ' ) drainage ditch to control erosion in ditch area C. Sand Volleyball Courts . .50 blocks to contain perimeters of courts TOTAL: 300 blocks $25 ,500 II . Wing Park Horseshoe Pits ( 10) $16 , 800 1 pit--12 - 10 ' long. .$85 each) 12 - 6 ' long. . . $55 each) . . . $1 , 680 installed III . Trout Park Horseshoe Pits (4 ) $6 , 720 1 pit--12 - 10 ' long. . $85 each) 12 - 6 ' long. .$55 each) . . . $1 , 680 installed GRAND TOTAL: $49 , 020 TIMBERIN.FO/TEXT081/COMPLEX