HomeMy WebLinkAbout93-17 Resolution No. 93-17 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH LEAGUE SEWER CONSTRUCTION, INC. FOR WATER DISTRIBUTION SYSTEM IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with League Sewer Construction, Inc. for water distribution system improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: January 27, 1993 Adopted: January 27, 1993 Omnibus Vote: Yeas 6 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS WATER DISTRIBUTION SYSTEM IMPROVEMENTS (LINDEN AVENUE PORTION) CHANGE ORDER NO. 2 SCOPE: This Change Order No. 2 covers the extra work necessary to complete the installation of the water main on the Linden Avenue portion of the water Distribution System Improvements . The contractor for this project is League Sewer Construction of Addison, Illinois . REASONS FOR CHANGE: This change order is required to pay the costs associated with the removal of additional concrete roadway and the cost of storing and moving pipe which were completed by League Sewer Construction. The concrete roadway was not known at the time of the letting of the contract. The additional pipe was an error in calculation by Clark Dietz, Inc. , the design engineer for this project. The additional pipe has been stored in the Public Works storage area and will be used on a future watermain project. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM AMOUNT ADD 1,767 S.Y. Concrete Removal @$50 . 00 per S.Y. $ 8,835 . 00 1,548 L.F. 20" Ductile Iron Water Main @$23 . 83 per L.F. 36,888.84 Shipping and Handling ( 15%) 5,533 .33 Overhead and Profit ( 10%) 3,688 . 88 TOTAL ADDITIONAL $ 54,946 .05 DEDUCT 20" Water Main Backfill Method 2 1108 l . f. @$54 59,832 .00 20" Water Main Backfill Method 4 440 l . f. @$40 17,600. 00 TOTAL DEDUCT $ 77,432 . 00 TOTAL CHANGE FOR CHANGE ORDER NO. 2 DEDUCT $ 22,485.95 • r CHANGE ORDER NO. 2 January 13, 1993 Page 2 The present contract with League Sewer Construction, is for $1, 343,642 . 64. By reason of this Change Order No. 2, the contract for construction of the Water Distribution Improvements (Linden Avenue) will be decreased in the amount of Twentytwothousand four hundred eighty-five and 95/100 dollars ($22,485 . 95) , the total contract value being One million three hundred twenty-one thousand one hundred fifty-six and 69/100 dollars ($1,321, 156 . 69) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this !ti day of %1.4.,c.c_cf,.17 , 1993 . Recommended: ENGINEERING DI I By?`7.0/ its Date: 1 /94) f3 Accepted: LEAGUE SEWER CONSTRUCTION, INC. Party of the Second Part (Contractor) By• 11►\\ ■ '4_N, _ Title: MI& Date: \_ \ _01') a Approved: CITY OF ELGIN Party of the Ffst Part (Owner) ,7 By.. ilik' •Title ffid -2 ,.L I Date: „u _ 96- AtN DED El in /; =�OF Agenda Item No. 0 4% pq!D FL41 January 13, 1993 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Authorization of Change Order #2, Final Payment and Acceptance of Water Main Improvements on Linden Avenue, North McLean Boulevard, Todd Farm Drive and Airlite Plant Distribution Extension PURPOSE: This memorandum will provide the Mayor and Council with information to consider approval of Change Order #2, acceptance of the subject improvements and authorizing the final payment. BACKGROUND: The City Council awarded to League Sewer Construction, Inc. the contract for the installation of water mains, in four locations, on August 28, 1991 . The four locations are as follows: Water Main Location Length in Feet Linden Avenue 2, 110 North McLean Boulevard 4,450 Todd Farm Drive 2,800 Airlite Plant Improvements to West 2,375 The work took longer than normal due to delays in cleaning up the work areas and in completing punch list items . The work has finally been satisfactorily completed. Attached for your consideration is Change Order #2 . A reduction in water main quantities and the addition of some concrete removal were unforeseen at the time the contract was awarded. There was an overall increase in the line items necessary to complete the various projects which made up this contract. These additions increase the overall cost of the contract as outlined below. • " Mayor and Members of the City Council January 13, 1993 Page 2 FINANCIAL IMPACT: The original contract was $1,329,963.00 and the resulting cost, inclusive of Change Order #2, is $1,321, 156 .69, a decrease of $22,485.95 . The increase of plan quantities, included additional fittings, 24" water main and restoration resulting in an increase of $23,503.56 . The final cost of the work is $1,344,660.25. RECOMMENDATION: It is recommended that the City Council approve Change Order #2 a decrease in the amount of $22,485.95 and direct staff to execute the change order document. It is further recommended that the City Council accept the completed project and authorize the final payment of $51,604 .73 to League Sewer Construction, Inc. r Larry L. Rice, ity Manager Attachments C r