Loading...
HomeMy WebLinkAbout93-0825 Arrow Road Construction Western Area II RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH ARROW ROAD CONSTRUCTION CO. FOR AREA II STREET AND SEWER IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Arrow Road Construction Co. for Area II street and sewer improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF LOCAL IMPROVEMENTS OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, President Presented: August 25, 1993 Adopted: August 25, 1993 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, Secretary ELGIN, ILLINOIS AREA II STREET AND SEWER IMPROVEMENTS PROJECT #7109 CHANGE ORDER NO. 2 SCOPE: This Change Order No. 2 will provide additional items to complete the project in an acceptable manner. The general contractor for this project is Arrow Road Construction Co. from Mount Prospect, Illinois . REASONS FOR CHANGE: This Change Order is required for the addition or change in items necessary to properly construct to road base, replace deteriorated sidewalk, maintain the existi g sanitary sewer, and patch sewer and water main trenches . SUMMARY OF CHANGES IN CONTRACT AMOUNT: The awarded contract will be changed to include the additional items listed below: ) ITEM QUANTITY UNIT PRICE COST 1 . 5 ' Dia. Sanitary 3 Ea. $1,700. 00 Ea. $ 5, 100 . 00 Manhole 2 . Sidewalk 39,000 S .F. $ 0 . 30/S.F. $ 11,7001. 00 Removal 3 . Unsuitable Soil 8,620 C.Y. $ 29 . 00/C.Y. $249,980 . 00 Rem. and Repl . 4 . 8" Concrete 100 S .Y. $ 20 . 00/S.Y. $ 2,0001. 00 Patch 5 . 10" Asphalt 140 S .Y. $ 40 . 00/S.Y. $ 5,600 . 00 Patch TOTAL = $274,380 . 00 SUMMARY OF INCREASES TO CONTRACT QUANTITIES: The awarded contract will be changed to include the increased quantities For the items listed below: Item ITEM CONTRACT INCREASED UNIT INCREASED No. QUANTITY QUANTITY PRICE COST 47 . Sidewalk 54, 134 S.F. 39,070 S .F. $2 .26 $88,298 .20 CHANGE ORDER NO. 2 August 20, 1993 Page 2 The original contract with Arrow Road Construction Co. is for $3, 176,663 . 90 . By reason of change Order No. 1, the contract was increased to $3,221, 909 .40 . By reason of this Change Order No. 2 , the contract for the Area II Street and Sewer Improvement Project will be increased in the amount of two hundred seventy-four thousand, three hundred eighty and 00/100 dollars ($274 , 380 . 00) . The circumstances which necessitate this change order were not reasonably foreseeable at the time the contract was signed. OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of -GLL" , 1993 . Recommended: EN ' 'ING DIVI ION BY: ■ �.�._ rerk' aaT' le S Date: I/ � /• Accepted: Arrow Road Construction Co. Party of the Second Part (Contrac or) By: 5i) E=L_I 2• ZIA? Title: � � ' Date: �� 712 3 Approved: CITY OF ELGIN Party of th= Fief Par ) By: �', Title: - Date: 13