Loading...
HomeMy WebLinkAbout93-0811 Western Area II Voucher 7 RESOLUTION AUTHORIZING THE ISSUANCE OF VOUCHER NUMBER 7 OF SPECIAL ASSESSMENT WESTERN ELGIN AREA II WHEREAS, the engineer' s payment estimate in the amount of $408,951 . 03 has been presented to the City for work completed on Special Assessment Western Elgin Area II, a copy of said engineer' s estimate being attached hereto and made a part hereof . NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF LOCAL IMPROVEMENTS OF THE CITY OF ELGIN, that the Board of Local Improvements hereby approves the issuance of the following voucher in the following amount for Special Assessment Western Elgin Area II : Voucher No. 7 in the amount of $408,951 . 03 to Arrow Road Construction A copy of said voucher being attached hereto and made a part hereof. s/ George VanDeVoorde George VanDeVoorde, President Board of Local Improvements City of Elgin Presented: August 11, 1993 Adopted: August 11, 1993 Vote: Yeas 5 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, Secretary V SPECIAL ASSESSMENT VOUCHER CITY OF ELGIN STATE OF ILLINOIS COUNTIES OF KANE AND COOK VOUCHER NO. 7 WESTERN ELGIN AREA II. SPECIAL ASSESSMENT NO. TX 92 0004 $408,951 . 03 SPECIAL ASSESSMENT VOUCHER OF THE CITY OF ELGIN, KANE AND COOK COUNTIES, ILLINOIS: To the Finance Director of the City of Elgin, Illinois . From funds to be obtained by collection of the special assessment made by the City of Elgin, Kane and Cook Counties, Illinois, in proceedings filed in the Circuit Court of Kane County, Illinois, and confirmed by the said Court on the 23rd day of July, 1992 and on the 1st day of September, 1992, in proceedings bearing Docket Number TX 92 0004 for the purpose of paying the cost of construction work of the improvement known as Western Elgin Area II in said City of Elgin, the said City of Elgin will pay to Arrow Road Construction, or order, when collected, the sum of Four Hundred Eight Thousand Nine Hundred Fifty-One Dollars and 03/100 ($408,951 .03) with interest thereon from the date hereof at the rate of seven percent (7%) per annum. This Voucher is given pursuant to authority conferred by the General Assembly of the State of Illinois in Article 9, Division 2, Paragraphs 9-2-1 through 9-2-144 of the Illinois Municipal Code (Ill . Revised Statutes, Chapter 24, Paragraphs 9-2-1 through 9-2-144) , in the matter of the aforesaid improvement and is the fourth Voucher issued on account of such work done. This voucher was authorized by the Board of Local Improvements. IN WITNESS WHEREOF, the City of Elgin Board of Local Improvements has caused this Voucher to be executed by its Mayor, countersigned by its Clerk, and its corporate seal to be affixed hereto at the City of Elgin, Illinois, this day of , 1993. George VanDeVoorde, Mayor Countersigned: Dolonna Mecum, City Clerk Received the original of the foregoing Voucher this day of , 1993. ARROW ROAD CONSTRUCTION By CITY OF ELGIN KANE COUNTY, ILLINOIS AREA II STREET AND SEWER IMPROVEMENTS CITY COST CENTER 7109 ENGINEER'S PAYMENT ESTIMATE ESTIMATE NO. 6 FROM JULY 1, 1993 TO JULY 24, 1993 PAYABLE TO: ARROW ROAD CONSTRUCTION 3401 SOUTH BUSSE ROAD P.O. BOX 334 MOUNT PROSPECT, ILLINOIS 60056 (708)437-0700 TEM AWARDED ADDED DEDUCTED COMPLETED o. DESCRIPTION UNIT QUANTITY VALUE QUANTITY QUANTITY QUANTITY UNIT PRICE VALUE 1 EARTH EXCAVATION CU YD 49265 $228,589.60 28176 $4.64 $130,736.64 2 TRENCH BACKFILL CU YD 10334 $191,592.36 9175 $18.54 $170,104.50 3 SUB-BASE GRANULAR MATERIAL TYPE B TON 4381 $53,170.44 3661 $12.12 $44,371.32 4 TOPSOIL PLACEMENT (4') SO YD 33598 $43,341.42 $1.29 $0.00 5 12' AGGREGATE BASE COURSE, TYPE B TON 6635 $52,880.95 3190 $7.97 $25,424.30 6 8' AGGREGATE BASE COURSE, TYPE B TON 34619 $303,608.63 16364 $8.77 $143,512.28 7 8' BITUMINOUIS BASE COURSE TON 4227 $127,824.48 2500 $30.24 $75,600.00 8 BITUMINOUS MATERIALS (PRIME COAT) GAL 21143 $16,491.54 $0.78 $0.00 9 BITUMINOUS SURFACE PLANT MIX, CLASS B (MODIFIED) TON 18695 $507,382.30 2700 $27.14 $73,278.00 10 RELOCATE WATER OR SLUDGE MAIN EACH 10 $20,600.00 4 $2,060.00 $8,240.00 11 10' DIA. RCCP STORM SEVER TYPE I, CLASS IV LN FT 234 $3,615.30 252 $15.45 $3,893.40 12 12' DIA. RCCP STORM SEWER TYPE I, CLASS IV LN FT 2864 $47,198.72 2594 $16.48 $42,749.12 13 15' DIA. RCCP STORM SEWER TYPE I, CLASS IV LN FT 2103 $34,657.44 2097 $16.48 $34,558.56 14 15' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 2637 $43,451.76 2739 $16.48 $45,138.72 15 18' DIA. RCCP STORM SEWER TYPE 1, CLASS IV LN FT 70 $2,018.80 71 $28.84 $2,047.64 16 18' DIA. RCCP STORM SEVER TYPE 2, CLASS III LN FT 1150 $21,321.00 1156 $18.54 $21,432.24 17 21' DIA. RCCP STORM SEVER TYPE I, CLASS IV LN FT 329 $6,777.40 363 $20.60 $7,477.80 18 21' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 624 $12,854.40 677 $20.60 $13,946.20 19 24' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 1346 $31,886.74 1165 $23.69 $27,598.85 20 27' DIA. RCCP STORM SEWER TYPE I, CLASS IV LN FT 312 $9,640.80 280 $30.90 $8,652.00 21 27' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 391 $12,081.90 408 $30.90 $12,607.20 22 36' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 1717 $67,203.38 1128 $39.14 $44,149.92 23 42' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 661 $29,275.69 6S6 $44.29 $29,054.24 24 48' DIA. RCCP STORM SEWER TYPE 2, CLASS III LN FT 1243 $64,014.50 285 $51.50 $14,677.50 25 14' x 23' ELL. RCCP ST. SEWER, TYPE 1, CLASS IV LN FT 629 $25,914.80 632 $41.20 $26,038.40 26 8' DIA. PVC SANITARY SEWER LN FT 43 $1,328.70 193 $30.90 $5,963.70 27 10' DIA. PVC SANITARY SEWER IN FT 245 $8,832.25 258 $36.05 $9,300.90 28 15' DIA. PVC SANITARY SEWER IN FT 6 $1,854.00 6 $309.00 $1,854.00 29 MANHOLE SPECIAL NO. 1 EACH 1 $3,914.00 1 $3,914.00 $3,914.00 SO 4' DIA. MANHOLE TYPE A EACH 18 $16,686.00 15 $921.00 $13,905.00 S1 5' DIA. MANHOLE TYPE A EACH 46 $61,594.00 50 $1,339.00 $66,950.00 S2 6' DIA. MANHOLE TYPE A EACH 7 $21,630.00 4 $3,090.00 $12,360.00 33 4' DIA. CATCH BASIN, TYPE A EACH 115 $100,682.50 92 $815.50 $80,546.00 S4 2' DIA. INLET, TYPE A EACH 2 $1,030.00 1 $515.00 $515.00 35 ADJUSTING FRAMES i GRATES EACH 101 $10,403.00 30 $103.00 $3,090.00 36 CB'S & DRY WELLS TO BE FILLED WITH SAND EACH 41 $4,223.00 38 $103.00 $3,914.00 S7 B6.18 COMBINATION CURB & GUTTER IN FT 38492 $297,543.16 20500 $7.73 $158,465.00 18 116 BARRIER CURB LN FT 414 $3,626.64 $8.76 $0.00 39 DRIVEWAY PAVEMENT REMOVAL SO YD 1148 $2,663.36 620 $2.32 $1,438.40 40 COMBINATION CURB & GUTTER REMOVAL IN FT 3154 $4,888.70 983 $1.55 $1,523.65 4I SIDEWALK REMOVAL SO FT 52485 $15,745.50 23802 $0.30 $7,140.60 42 BITUMINOUS SURFACE REMOVAL (COLD MILLING) SO YD 3586 $7,315.44 $2.04 $0.00 43 FIRE HYDRANTS TO BE MOVED EACH 3 $4,635.00 3 $1,545.00 $4,635.00 44 SODDING SO YD 33297 $80,578.74 $2.42 $0.00 45 TRAFFIC CONTROL L SUM 1 $44,476.43 0.55 $44,476.43 $24,462.04 46 MOBILIZATION L SUM 1 $60,358.00 1.00 $60,358.00 $60,358.00 47 SIDEWALK SO FT 54134 $122,342.84 19000 $2.26 $42,940.00 48 DRIVEWAY SO YD 6433 $129,496.29 920 $20.13 $18,519.60 49 WATER MAIN ENCASEMENT LN FT 14 $1,442.00 $103.00 $0.00 50 ENGINEERS FIELD OFFICE L SUM 1 $9,270.00 0.55 $9,270.00 $5,098.50 51 UNDERGROUND LIFT STATION L SUM 1 $47,380.00 $47,380.00 $0.00 52 4' DUCTILE IRON FORCEMAIN LN FT 1372 $21,197.40 $15.45 $0.00 53 DUCTILE IRON PIPE, CLASS 52, CEMENT LINED 4' LN FT 10 $2,575.00 15 $257.50 $3,862.50 54 DUCTILE IRON PIPE, CLASS 52, CEMENT LINED 6' LN FT 10 $2,575.00 65 $257.50 $16,737.50 55 DUCTILE IRON PIPE, CLASS 52, CEMENT LINED 8' LN FT 2890 $53,580.60 2843 $18.54 $52,709.22 56 VALVE VAULT 5' DIAMETER, TYPE 1 FRAME CLOSED LID EACH 11 $12,463.00 14 $1,133.00 $15,862.00 57 GATE VALVE, 8' EACH 1 $360.50 1 $360.50 $360.50 58 FIRE HYDRANT EACH 4 $5,356.00 4 $1,339.00 $5,356.00 59 PRESSURE CONNECTION EACH 11 $22,660.00 12 $2,060.00 $24,720.00 SO WATER SERVICES NEAR SIDE EACH 27 $11,124.00 25 $412.00 $10,300.00 61 WATER SERVICES FAR SIDE EACH 35 $23,432.50 38 $669.50 $25,441.00 TOTALS $3,176,663.90 $1,687,530.94 MISCELLANEOUS EXTRAS AND CREDIT VALUE CHANGE ORDER $1, JUNE 24, 1993 62. TYPE 'C' CATCH BASIN EACH 12 $681.25 $8,175.00 63. 6' DIA PVC SANITARY SEWER LN FT 672 $29.98 $20,146.56 64. STRUCTURE RECONSTRUCTION EACH 25 $550.00 $13,750.00 TOTAL MISCELLANEOUS EXTRAS AND CREDITS $42,071.56 TOTAL VALUE OF COMPLETED WORK $1,729,602.50 DEDUCT RETAINAGE (101) $172,960.25 BALANCE DUE ON COMPLETED WORK $1,556,642.25 MISCELLANEOUS DEBITS VALUE PREVIOUS PAYMENTS PAYOUT NUMBER 1, APRIL 1, 1993 $132,444.12 PAYOUT NUMBER 2, APRIL 22, 1993 $229,183.05 PAYOUT NUMBER 3, MAY 4, 1993 $132,102.64 PAYOUT NUMBER 4, JUNE 1, 1993 $394,614.16 PAYOUT NUMBER 5, JULY 1, 1993 $259,347.25 TOTAL MISCELLANEOUS DEBITS & PREVIOUS PAYMENTS $1,147,691.22 NET AMOUNT DUE $408,951.03 / / ' APPROVED ! - DATED 7-3 D , 1993 s-_ / v PROJECT ENGINEER SIGNED .� /��.�/ DATED 72/4;7 , 1993 CITY ENGINEER WAIVER OF LIEN TO DATE STATE OF ILLINOIS SS Gty# COUNTY OF Cook Loan# TO WHOM IT MAY CONCERN: WHEREAS the undersigned has been employed by City of Elgin to furnish Area II Street & Sewer Improvements for the premises known as Various Streets of which City of Elgin is the owner. THE undersigned,for and in consideration of Four Hundred Eight Thousand, Nine Hundred Fifty-One and 03/100 ($4 08,951.03 )Dollars,and other good and valuable considerations.the receipt whereof is hereby acknowledged,do(es) hereby waive and release any and all lien or claim of,or right to,lien,under the statutes of the State of Illinois,,relating to mechanics'liens,with respect to and on said above-described premises,and the improvements thereon, and on the material, fixtures, apparatus or machinery furnished, and on the moneys,funds or other considerations due or to become due from the owner,on account of labor services,material, fixtures,apparatus or machinery, furnished to this date by the undersigned for the above-described premises. Given under hand and seal this 26th day of July , 19 93 . Signature and Seal: •/7 NOTE:All waivers must be for the full amount paid.If waiver is fora corporation,corporate names ould be used,corporate seal affixed and title of officer signing waiver should be set forth;if waiver is for a partnership,the partnership name should be used,partner should sign and designate himself as partner. STATE OF ILLINOIS CONTRACTOR'S AFFIDAVIT SS COUNTY OF Cook TO WHOM IT MAY CONCERN: THE undersigned,being duly sworn,deposes and says that he is R. J. Rizzo Vice President of the Arrow Road Construction Co. _ who is the contractor for the Area II Street & Sewer Improvements work on the building located at Various Streets owned by City of Elgin That the total amount of the contract including extras is$3, 176,663.90 on which he has received payment of $ 1, 147,691.22 prior to this payment.That all waivers are true,correct and genuine and delivered unconditionally and that there is no claim either legal or equitable to defeat the validity of said waivers.That the following are the names of all parties who have furnished material or labor,or both, for said work and all parties having contracts or sub contracts for specific portions of said work or for material entering into the construction thereof and the amount due or to become due to each,and that the items mentioned include all labor and material required to complete said work according to plans and specifications: CONTRACT AMOUNT THIS BALANCE NAMES WHAT FOR PRICE PAID PAYMENT DUE Arrow Road Construction Co. L.E.M. * 3,176,663.90 1.147.691.22 408,951.03 1,620,021.65 *All materials taken from fully paid stock and delivered to joosite in Arrow's trucks. TOTAL LABOR AND MATERIAL TO COMPLE'T'E 3,176,663.90 1,147,691.22 408,951.03 1,620,021.65 That there are no other contracts for said work outstanding,and that there is nothing due or to become due to any person for material,labor or other work of any kind done or to be done upon or in connection with said work other than above stated. Signed this 26th day of July , 19 93 . 2 �t.L4._ • "OFFICIAL SEAL" ' Subscribed and sworn to before me is MAE L. VESE day of July 19 93 My Co misJ,Io State pi of Illinois /4/9 `/i 1/ _ F.1722 R1/89 My Commission Expires 8/4/94 7 SINCE >ahi 1925 AkINVOICE NO. 60539 ARROW ROAD CONSTRUCTION COMPANY 3401 SOUTH BUSSE ROAD • P.O. BOX 334 • MT. PROSPECT. ILLINOIS 60056 TELEPHONE 437-0700 SOLD TO: City of Elgin LOCATION: Area II Street & Sewer Improvements 150 Dexter Court Elgin, IL 60120-5555 OUR JOB NO. EST.NO. CUSTOMER CONTRACT OR P.O. NO. TERMS PICKED UP AT PLANT INVOICE DATE 675 Partial NET 10 DAYS 7/26/93 �� r P A `' , d r'* 4 L j x } , t A ,'w w Y 'y ` f ,4], ;„. I 0 i y F ,„4.x f," " � ,SS s ? r '� � . a� it 4” i N. i --s to .� •r0 n� �+r , ,°' �_v,x x �. 9 � 14.4;,1�,�, key ti_ra,W,,� . ; , �»t 344 t mi8 z r "; `$i r ..��" .,..�� yr N >v; "t`,,,,"1 � a —?<f Contract Work Completed To Date (See Attached) 1,729,602.50 Less: 10% Retention: -- 172,960.25 1,556,642.25 Less: Pay Request #1 -132,444.12 #2 (Adjusted) -229,183.05 # 3 (Adjusted) -132,102.64 #4 -394,614.16 #5 -259,347.25 Amount Due: '. 408,951.03 A SERVICE CHARGE OF 1'/2% PER MONTH (18% PER ANNUM) FORM 101 2-83 WILL BE CHARGED ON ALL ACCOUNTS AFTER 30 DAYS n • PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 1. EARTH EXCAVATION CY 49,265 4.64 228,589.60 16,591 76,982.24 11,585 53,754.40 28,176 130,736.64 2. TRENCH BACKFILL CY 10,334 18.54 191,592.36 9,175 170,104.50 9,175 170,104.50 3. SUBBASE GRAN TN 4,387 12.12 53,170.44 1,060 12,847.20 2,601 31,524.12 3,661 44,371.32 MATERIAL TYPE B 4. TOPSOIL PLACEMENT SY 33,598 1.29 43,341.42 (4") 5. 12" AGGREGATE TN 6,635 7.97 52,880.95 1,387 11,054.39 1,803 14,369.91 3,190 25,424.30 BASE CSE TYPE B 6. 8" AGGREGATE TN 34,619 8.77 303,608.63 7,173 62,907.21 9,191 80,605.07 16,364 143,512.28 BASE CSE TYPE B 7. 8" BITUMINOUS TN 4,227 30.24 127,824.48 1,117 33,778.08 1,383 41,821.92 2,500 75,600.00 BASE CSE 8. BITUMINOUS MATERIAL GAL 21,143 0.78 16,491.54 (PRIME COAT) 9. BITUMINOUS SURFACE TN 18,695 27.14 507,382.30 1,266 34,359.24 1,434 38,918.76 2,700 73,278.00 PLANT MIX CL B MOD 10. RELOCATE WATER OR EA 10 2060.00 20,600.00 4 8,240.00 4 8,240.00 SLUDGE MAIN 11. 10" DIA RCCP SS LF 234 15.45 3,615.30 252 3,893.40 252 3,893.40 TYPE 1 CL IV 12. 12" RCCP SS LF 2,864 16.48 47,198.72 2,594 42,749.12 2,594 42,749.12 TYPE 1 CL IV PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 13. 15" RCCP SS LF 2,103 16.48 34,657.44 2,097 34,558.56 2,097 34,558.56 TYPE 1 CL IV 14. 15" RCCP SS LF 2,637 16.48 43,457.76 2,739 45,138.72 2,739 45,138.72 TYPE 2 CL III 15. 18" RCCP SS LF 70 28.84 2,018.80 71 2,047.64 71 2,047.64 TYPE 1 CL IV 16. 18" RCCP SS LF 1,150 18.54 21,321.00 1,156 21,432.24 1,156 21,432.24 TYPE 2 CL III 17. 21" RCCP SS LF 329 20.60 6,777.40 363 7,477.80 363 7,477.80 TYPE 1 CL IV 18. 21" RCCP SS LF 624 20.60 12,854.40 677 13,946.20 677 13,946.20 TYPE 2 CL III 19. 24" RCCP SS LF 1,346 23.69 31,886.74 1,165 27,598.85 1,165 27,598.85 TYPE 2 CL III 20. 27" RCCP SS LF 312 30.90 9,640.80 280 8,652.00 280 8,652.00 TYPE 1 CL IV 21. 27" RCCP SS LF 391 30.90 12,081.90 408 12,607.20 408 12,607.20 TYPE 2 CL III 22. 36" RCCP SS LF 1,717 39.14 67,203.38 1,128 44,149.92 1,128 44,149.92 TYPE 2 CL III 23. 42" RCCP SS LF 661 44.29 29,275.69 656 29,054.24 656 29,054.24 TYPE 2 CL III 24. 48" RCCP SS LF 1,243 51.50 64,014.50 285 14,677.50 285 14,677.50 TYPE 2 CL III PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 25. 14" X 23" ELL RCCP LF 629 41.20 25,914.80 632 26,038.40 632 26,038.40 SS TY 1 CL IV 26. 8" DIA PVC LF 43 30.90 1,328.70 193 5,963.70 193 5,963.70 SANITARY SEWER 27. 10" DIA PVC LF 245 36.05 8,832.25 258 9,300.90 258 9,300.90 SANITARY SEWER 28. 15" DIA PVC LF 6 309.00 1,854.00 6 1,854.00 6 1,854.00 SANITARY SEWER 29. MANHOLE SPECIAL EA 1 3914.00 3,914.00 1 3,914.00 1 3,914.00 NO. 1 30. 4' DIA EA 18 927.00 16,686.00 15 13,905.00 15 13,905.00 MANHOLE TY A 31. 5' DIA EA 46 1339.00 61,594.00 50 66,950.00 50 66,950.00 MANHOLE TYPE A 32. 6' DIA EA 7 3090.00 21,630.00 4 12,360.00 4 12,360.00 MANHOLE TYPE A 33. 4' DIA CATCH BASIN EA 115 875.50 100,682.50 92 80,546.00 92 80,546.00 TYPE A 34. 2' DIA INLET EA 2 515.00 1,030.00 1 515.00 1 515.00 TYPE A 35. ADJUSTING FRAMES & EA 101 103.00 10,403.00 7 721.00 23 2,369.00 30 3,090.00 GRATES PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 36. CATCH BAS & DRYWELLS EA 41 103.00 4,223.00 38 3,914.00 38 3,914.00 TO BE FILLED WITH SAND 37. B6.18 COMB CURB LF 38,492 7.73 297,543.16 6,282 48,559.86 14,218 109,905.14 20,500 158,465.00 AND GUTTER 38. B6 BARRIER LF 414 8.76 3,626.64 CURB 39. DRIVEWAY PAVEMENT SY 1,148 2.32 2,663.36 620 1,438.40 620 1,438.40 REMOVAL 40. COMB CURB AND LF 3,154 1.55 4,888.70 983 1,523.65 983 1,523.65 GUTTER REMOVAL 41. SIDEWALK SF 52,485 0.30 15,745.50 23,802 7,140.60 23,802 7,140.60 REMOVAL 42. BITUMINOUS SURFACE SY 3,586 2.04 7,315.44 REMOVAL (COLD MILLING) 43. FIRE HYDRANTS TO EA 3 1545.00 4,635.00 3 4,635.00 3 4,635.00 BE MOVED 44. SODDING SY 33,297 2.42 80,578.74 45. TRAFFIC CONTROL LS 1 44476.43 44,476.43 0.44 19,569.63 0.11 4,892.41 0.55 24,462.04 46. MOBILIZATION LS 1 60358.00 60,358.00 1.00 60,358.00 1.00 60,358.00 47. SIDEWALK SF 54,134 2.26 122,342.84 19,000 42,940.00 19,000 42,940.00 48. DRIVEWAY SY 6,433 20.13 129,496.29 920 18,519.60 920.00 18,519.60 PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 49. WATER MAIN LF 14 103.00 1,442.00 ENCASEMENT 50. ENGINEER'S FIELD LS 1 9270.00 9,270.00 0.44 4,078.80 0.11 1,019.70 0.55 5,098.50 OFFICE 51. UNDERGROUND LS 1 47380.00 47,380.00 LIFT STATION 52. 4" DUCTILE IRON LF 1,372 15.45 21,197.40 FORCE MAIN 53. DUCTILE IRON PIPE, LF 10 257.50 2,575.00 15 3,862.50 15 3,862.50 CL 52 CEMENT LINED 4" 54. DUCTILE IRON PIPE LF 10 257.50 2,575.00 65 16,737.50 65 16,737.50 CL 52 CEMENT LINED 6" 55. DUCTILE IRON PIPE LF 2,890 18.54 53,580.60 2,843 52,709.22 2,843 52,709.22 CL 52 CEMENT LINED 8" 56. VALVE VAULT 5' DIA EA 11 1133.00 12,463.00 14 15,862.00 14 15,862.00 TYPE 1 FRAME CLOSED LID 57. GATE VALVE 8" EA 1 360.50 360.50 1 360.50 1 360.50 58. FIRE HYDRANT EA 4 1339.00 5,356.00 4 5,356.00 4 5,356.00 PROJECT NAME AREA II STREET & SEWER IMPROVEMENTS JOB NO. : 675 CONTRACTOR CITY OF ELGIN DATE: JULY 29, 1993 CONTRACT NO. EST. NO. :PARTIAL EST UNIT TOTAL TOTAL TO THIS EST. COMPLETED THIS EST. TOTAL TO DATE LINE DESCRIPTION UNIT QTY COST COST QTY COST QTY COST QTY COST 59. PRESSURE EA 11 2060.00 22,660.00 12 24,720.00 12 24,720.00 CONNECTION 60. WATER SERVICES EA 27 412.00 11,124.00 25 10,300.00 25 10,300.00 NEAR SIDE 61. WATER SERVICES EA 35 669.50 23,432.50 38 25,441.00 38 25,441.00 FAR SIDE CHANGE ORDER #1: 63. TYPE C CATCH EA 8 681.25 5,450.00 12 8,175.00 12 8,175.00 BASIN 64. 6" DIA PVC LF 545 29.98 16,339.10 672 20,146.56 672 20,146.56 SANITARY SEWER 65. STRUCTURE EA 25 550.00 13,750.00 25 13,750.00 25 13,750.00 RECONSTRUCTION 3,212,203.00 1,275,212.47 454,390.03 1,729,602.50