Loading...
HomeMy WebLinkAbout93-0609 Arrow Road Construction Western Area II RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH ARROW ROAD CONSTRUCTION CO. FOR AREA II STREET AND SEWER IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Arrow Road Construction Co. for Area II street and sewer improvements; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, President Presented: June 9, 1993 Adopted: June 9, 1993 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, Secretary ELGIN, ILLINOIS AREA II STREET AND SEWER IMPROVEMENTS PROJECT #7109 CHANGE ORDER NO. 1 SCOPE: This Change Order No. 1 will provide additional items necessary to complete the project in an acceptable manner. The general contractor for this project is Arrow Road Construction Co. from Mount Prospect, Illinois . REASONS FOR CHANGE: This Change Order is required for the addition or change in items necessary to complete the storm sewer system and to control dust. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The awarded contract will be changed to include the additional items listed below: ITEM QUANTITY UNIT PRICE COST 1. 2 ' Dia. Type C 10 Ea. $681.25 ea. $ 6,812 .50 Catch Basin 2 . 6" Dia. PVC 600 L.F. $29 .98/L.F. $17,988 . 00 Sanitary Sewer 3 . Structure 25 Ea. $550.00 Ea. $13,750.00 Reconstruction 4 . Frame and Grate, 25 Ea. $150.00 Ea. $ 3,750.00 Type I 5. Dust Control 900 Units $13.00/Unit $11,700.00 TOTAL = $54,000.50 The following deduction will be made to the contract items : ITEM QUANTITY UNIT PRICE COST 1. 4 ' Dia. Type A 10 Ea. $875 .50 Ea. $ 8,755 . 00 Catch Basin TOTAL = $ 8,755.00 CHANGE ORDER NO. 1 June 14, 1993 Page 2 The present contract with Arrow Road Construction Co. is for $3, 176,663 .90. By reason of this change Order No. 1, the contract for the Area II Street and Sewer Improvement Project will be increased in the amount of forty five thousand two hundred forty five and 50/100 dollars ($45,245 . 50) . The circumstances which necessitate this change order were not reasonably foreseeable at the time the contract was signed. OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of ,rQ , 1993 . Recommended: ENGINEERING DIVISION BY: ,,� 4 -a-r-.--._- Title: Date: 6- /L -- 9'3 Accepted: Arrow Road Construction Co. Party of the Second Part (Contractor) By: `Jr Title: Date: C// � ° d-9 03 Approved: CITY OF ELGIN Ilk Party of the Fi .t Pa , Owner) By: ■ -_ �. Title: 7 " :/7- t.. Date: r��:2L z �- 1/ /`/Y4) N • n Agenda Item No. 9 \q ej e June 4, 1993 TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Area II Street and Sewer Improvement Project Change Order No. 1 PURPOSE: This memorandum will provide the Mayor and Members of the City Council with information to consider authorizing execution of the subject Change Order. BACKGROUND: On October 28, 1992 the Board of Local Improvements awarded a contract to Arrow Road Construction for the Area II Street and Sewer Improvement Project. During the construction process, several conflicts with existing utilities such as gas mains, sanitary sewer services, and telephone lines have arisen, prompting necessary changes to the storm sewer design. This includes the need to install 2 ' dia. catch basins in place of the proposed 4 ' dia. catch basins at several locations and the lowering of many sanitary sewer service lines. Also, several existing sanitary sewer manholes have deteriorated to the point that they need to be reconstructed. This item was not included in the original contract. Many complaints have been received from the residents in the project about the amount of dust that has been generated by the construction and traffic on the roads. The only way to control the dust is to spray water on the streets several times during the day. Dust control was not included in the project specifications. An item for dust control has also been included in this change order. FINANCIAL IMPACT: The installation of 2 ' dia. catch basins in place of 4 ' dia. catch basins will result in an estimated decrease of $1,942 .50. The cost to install 6 inch dia. PVC sanitary sewer is estimated to be an increase of $17,988. The cost to reconstruct existing structures is estimated to be an increase of $17,500. The cost for dust control is estimated to be an increase of $11,700. The total increase in contract price eft for this Change Order No. 1 is estimated to be $45,245.50. Mayor and Members of the City Council June 4, 1993 Page 2 emk RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 1, which will increase the contract with Arrow Road Construction by an estimated $45,245.50. Lary- L. R ity Manager do Attachment r r