Loading...
HomeMy WebLinkAbout87-0713 Paris Contracting - 13 ELGIN, ILLINOIS LORD'S PARK POOL IMPROVEMENTS CHANGE ORDER NO. 1 SCOPE: This Change Order No . 1 covers the necessary painting inside of the pool and required deck painting as noted below: Paint lane lines on pool bottom Paint crosses on pool walls at lane lines Paint depth numerals at pool edge Paint solid standback line around pool perimeter Paint walking signs on pool deck The general contractor operating under contract to the City of Elgin is Paris Contracting Company , of Chicago , Illinois 60652 . REASONS FOR CHANGE: This change order is required in order to comply with Illinois state law by having the specified deck painting . The lane lines are required in order to allow for lap swimming at the pool . SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows : ITEM ADD Swimming Pool Lane Lines , six ( 6) lane lines and $1 ,250 .00 twelve ( 12 ) wall crosses; Lump Sum . Deck and Depth Marker Painting , eight (8) walk $1 , 100. 00 signs, four inch solid standback line, and depth numerals every twenty-five feet ; Lump Sum. The present contract with Paris Contracting Company is for $103, 367.00. After the contract was awarded , the Contractor realized that he had mis-quoted two unit costs. These costs were revised downward making the revised contract for- $88,967.00 . Due to increased quantities of some items , the estimated contract amount will be for $90,500.00. By reason of this Change Order No . 1 , the contract for the Lord ' s Park Pool Improvements will be increased in the amount of Two Thousand Three Hundred Fifty Dollars ( $2,350 .00 ) , the total contract value being Ninety Two Thousand Eight Hundred Fifty Dollars ( $92,850.00) . OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. CHANGE ORDER NO. 1 May 21 , 1987 Page 2 ia Agreed to this ( 43 day of 11 qu y , 1987. Recommended : ENGINEERING DIVISION B ) IP if y: f : V` :* 41 Date: item/ J1 j1, , - 7 Accepted : PARIS CONTRACTING COMPANY Party of the Second Part (Contractor ) By :1&. 4° Title: -. Date: _ 7/604>7 Approved : CITY OF ELGIN Party of the First Part (Owner ) 135? r ---- 01 T : „l 11) l+Uf4 __ Date : __/3 g7