HomeMy WebLinkAbout93-53 Resolution No. 93-53
RESOLUTION
APPROVING CHANGE ORDER NO. 6 IN THE CONTRACT WITH
ELGIN BUILDERS, INC. FOR THE LORD'S PARK PAVILION
WHEREAS, the City of Elgin has heretofore entered into a
contract with Elgin Builders, Inc. for renovation of the
Lord's Park Pavilion; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 6,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry IT. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 6, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: February 24 , 1993
Adopted: February 24, 1993
Omnibus Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
ELGIN, ILLINOIS
RENOVATION OF THE LORD'S PARK PAVILION
CHANGE ORDER NO. 6 AND FINAL
SCOPE: This Change Order No. 6 covers additional work required
to complete construction changes for the renovation of
the Lord's Park Pavilion.
The Contractor for this project is Elgin Builders,
Inc. , of Elgin, Illinois.
REASONS FOR CHANGE: This Change Order is required for the costs
associated with the items requested by staff to complete the
following work.
1. Additional hardware equipment was required to be substituted
to complete the full operation of the doors.
This circumstance was unforeseen as the original specified
sliding door hardware was not available anymore due to the
company closing its manufacturing plant. A substitute
manufacturer had to be found.
2 . Replacement of porch deck in the south east corner.
The deck in the area was found to be soft and spongy due to
a weakened subfloor below the deck. This bad section of
decking was hidden and not able to be seen.
3. Porch deck replacement under columns (two separate
occasions) .
These unforeseen field condition was discovered after
placement of the new columns. The subdeck under the
existing deck had rotted and was in need of replacement.
4. Level floor in the round warming room.
The floor in the warming room had sloped towards the center
of an abandoned drain. The City requested the floor be
leveled to facilitate floor tile installation.
5. Install fan relay shut down switches.
The installation of the relay switches was to be performed
under a separate contract by a different Contractor who was
unable to perform these services. This portion of the work
was then added to the Scope of Work under this Contract.
This change is germane to the Contract and required for
occupancy of the building.
6. Replacement of cracked stained glass.
Under the Base Bid all obvious stained glass panels that
were cracked or missing were to be replaced. These
additional panels were found to be cracked and not seen in
the original survey, due to their inaccessible locations.
7. Replace the sprinkler system flow switch.
The original flow switch that was specified was not
compatible with the fire alarm system installed under a
separate Contract by a different Contractor. This change is
essential for the performance of both the sprinkler and fire
systems.
8. Additional work on round roof.
The original proposed change in construction had been
revised after an on site meeting. However, the original
proposal had been submitted (AWA #39 - $3,846.00) in lieu of
the revised proposal (AWA #39R - $4,338.00) for Change Order
#4. The difference in the amount is $542.00.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
The amount of the Contract will be revised as follows:
ITEM COST CHANGE
Item 1 (AWA #74) Add $ 1, 394.00
Item 2 (AWA #75 & 57) Add $ 1, 138. 00
Item 3 (AWA #77) Add $ 357.00
Item 4 (AWA #79) Add $ 1, 150. 00
Item 5 (AWA #80) Add $ 2,520.00
Item 6 (AWA #84) Add $ 458.00
Item 7 (AWA #85) Add $ 445.00
Item 8 (AWA #39R) Add $ 542 . 00
Total Add $ 8,004,00
The present contract with Elgin Builders, Inc. is for
$1,078,519.00. By reason of Change Order No. 6 the Contract for
the Renovation of the Lord's Park Pavilion will be increased in
the amount of Eight Thousand Four and 00/100 Dollars
($8,004.00) . The new revised contract total will be One Million
Eighty Six Thousand Five Hundred Twenty Three and 00/100 Dollars
($1,086,523 .00) .
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this day of , 1993 .
Recommended:
PARKS DEPARTMENT
BY:
Date:
Accepted:
ELGIN BUILDERS, INC.
Party of the Second Part (Contractor)
By:
Title: a
Date: l— / 3 - ?
Approved:
CITY OF ELGIN
Party of the Fir T Pa t (Owner)
By: / %�.�.
Title: __�c�
A6
Date: S��
IA. DITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 July 15, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord's Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Replace porch deck under 24 columns of 4 square feet each.
96 sq. ft. at $6.85 $658.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 658.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized SignatureDate July 15th isq2
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 57 (fifty-seven)
\ NOTE:This Revision becomes part of,end In conformance with,the existing contract. /
: ,..,:gi..rf:!..3.,..:,-5,4,7:4,.::".„..;- -.7.41,AD,15,1,-T,iiii4A.--Lvo-6k....,,i,...;,Atit-ii:446..„, ,c...7...,0t...._.T..,,,,7,.n.,,..72.47.5..q,w1
) ;v44.1;:-...4prf4,....,,s,i,-,?,:e.),,.i.,:;;t,.,',4,,t,:::,::::.,,,,,,:ilhON
,e.i.i., ,,,,oxv).,.i.,:122::•, y.vitg.1.,4' ...:.1,7,?:.,,A7,14:: NI;.(,44:to,vtl.4..kiimft.i,..,,t.t.y,e,a:: ..
, ,,,w,,,,„.t;.:1:.,,cit,;::;q::?,,-,4,.:.1,4,,..„.:;::.1„,:::::',;•:;!:,:,?:-...,, ,,.!,..4.,;,,,,..ii5i?,",,;:•:.:,;ii;.4,....,.: F.,,, . . ,. :,.:Ity. ,o;t„,.:;,:iii:.:I.,,,:.:::,,..;$,..,,,At$1...,,, .p. ,73.:tya„:;:„;,3,,,,,.,i,tvg,,,!.
•J'tl!,.:......:;,;.;,...;;.:'..24 . '. , ..::,',Ilat.Y:,:;!.:4,472,:ip:11,t1t Li:I
k:-;136.iLlit RsfiNt
.-14.4.•:.,.:4...•••-•-•.;:,......:4_,,;:..- ;44p.-4 r;,••....;.•.,; , w ..1/2
:;•, ....-:,;... ...-• .•; ....., •,.;;;;-,;,-,...,•13,'::;-, .,--- tii:',"•:'!;;:k.:.-.7..*..1801.:Larkin.Avenue.*.'•":":11 '..;...i ,..1!,.;'%•••:::;:•:•••:;t3.. ..):-.-• .;.• • .':-• '•-:" 7,17',....:1. ,.•
• .- *::: . ... '-.•'':':',4,1'....v:kt;';,-.: ' . : t..:n.s.':. `(.; ' :"'ELGIN, ILLINOIS 60123 '.,... '..-.•. *. .'. •.. '''::.'...,. .:. ' • .. .." • -:, :7,4..*:
. • . ,. • •;•';'; "•• . ' ; .. ; ./... ' -Phone (708) 742-0090 • , • .'-.. .. ' , - ' . .1 . . . ' • . • .i.
, •
Fax (708) 742-0188 .. ... .. . ... r
., . .
.•
_...,,
OWNER'S .
PHONE .
DATE .
NAME
•
. .
Dahlqufst & Ltlittow :, — 742-4063 October 12, :1992 ;
.-- JOS NAME- — ..10D NUMBER . .,
. ..
.
Jaz Lt...a . : _ 1..antiLs P A r k..-P ' I r
CITY .: • STATE STREET . • ^'
.
Elgin * Illinois ' 100 Oakwood Blvd. '
EXi$TINC)CONTRACT NO. • • .,',, DATE OF EXi --sTIND CONTRACT CITY STATE
e-3U-91
____ El • in .IL
You aro horoby author(zed to perform the following specifically described additional work: ,
. .
, .
. ,
. .:
• Hardware not Avall'abl,e -, substitute by manufacturer.
•
.•
Furnish' sliding' door track for sliding doors #36, 37, 41 and 42. ,
Materials $1 ,u92.UU .
• i
. I
I
i z
Furnish and install drop plates on doors 31 , 32, 46 and 47.
. ,.
• , .,.. .. .. .
:Materials . 4 at $19 $ 76.00
Labor. 1 hr. at S44. 44.0u
$ 120.00
. .
. • .
$10212.00 .
. .
.G.C.O.H, & P. ' .(15%)
182.00
$1 ,394.0u ,
. . .
,,
-
ADPITIONAL CHARGE FOR ABOVE WORK i$: $ 1 ..a10-00
.1
:payment will be made as follows,:--jjelL10 A'', e.all i7,rA.1.---r------ - -
. ---
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated..
— .. • ., :...,- •
. ., . . : .. .
,.. .
Dale 19Authorizing Signature—..—
eiWrieN sIGNS HERE)
- - --- _ . -rt-. z:--:-.- -
,
We hereby agree to•furnish:labor and materials-complete In accordan.ce'with the above specifications.at above stated price.
,. .
: . .
• .
.
• Authorized signature
—. Date-4:Lc.12.114'. !?'!) 19 u...9
----TraFFRA-df6A$re.NIITCWS)
' ',i'. : ' •
• .T 1-1 1 S IS. CHANGEORDER NON . I' t suyenty-four) __________
.:,
N. NOTE: tiN R.ovInIon becom“part Of.41(10 In coAlermanei:with,mo oxletME contract
-/
---"rr-- ..------ --
. ,
; . . . .
.•
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 October 13, 1992
STREET JOB NAME 'JOB NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Replace porch deck on southeast corner as directed by John Roberson.
70 sq. ft. at $6.85 $480.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 480.00
Payment will be made as follows: Sam as rontrar.t
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature October 13th 92 Date 19
(CONTRACT s• IGNS HERE)
THIS IS CHANGE ODER NO. 75 (seventy-five) /l
\ NOTE:This Revision becomes part of,and In conformance with,the existing contract.
ADDITIONAL, WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
nah1rinist A I ui-. w 742-4063 October 14, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Figin III
You are hereby authorized to perform the following specifically described additional work:
Rebui1dsub floor on porch deck under columns.
__......_..... ........... __..._..._ Mater
Materials s........ $ 46 00
Carpenter labor 6hrs. at $44...._._.... 264.00
$310.00
G.C.O.H. & P. (15%) 47.00
$357.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 357-00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications.at above stated price.
Authorized Signature Date October 14th 1992
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 77 (seventy-seven)
NOTE:This Revision becomes part of.and In conformance with,the exIatinp contract. /�
A *ITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 November 30, 1992
STREET JOB NAME JOB NUMBER
47? N. Mel Pan Blvd_ Inrd' c Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Level floor in ..round .room. 101 and storage room 118
_._._ ._...as. per.......bid.__......... . ......... _.._
$1,150.00. ....
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 1,150.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature Date November 30th 19 92
TRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 79 (seventy-nine)
\ NOTE:This Revision becomes part of,end In conformance with,the existing contract. /
•
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlquist & Lutzow 742-4063 Noverliber 30, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord's Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin it
You are hereby authorized to perform the following specifically described additional work:
Install fan shut down relays on eight (8) air handling
units in north and south mechanical rooms.
$2,400.00
S.C.O.H. & P. (5%) 120.00
$2,520.00
This work must be authorized on or before 11/30/92.
After 11/30/92 and before 12/20/92 the cost is $4,520.00
After 12/20/92 this proposal is. void.
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 2,52n_n0
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
• • '
Authorized Signature ivy .._ Date November 30, 199
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 80 (eighty)
\ NOTE:This Revision becomes part of,and in conformance with,the existing contract.
/ \ .
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlquist & Lutzow 742-4063 1)Prpmh r 2R, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
R-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Replace additional stained glass not called foron plan.
Sub contractor $436.00,
S.C.O.H.... &...P•..... .. (5%) 22.00
$458.00 .
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 458.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and,materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature 9•4 4 Le`� --T--*.1 Date December 28th 1992
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE OR ER NO. _G4 (eighty-four)
\ NOTE:ThIs Revision becomes part of,and In conformance with,the existing contract. /
ADDITIONAL. WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlquist & Lutzow 742-4063 January-8, 1993
STREET JOB NAME JOB NUMBER
472 N J"IcLean Blvd_ Lord's Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Change.....flow....switch on sprinkler. :.... . ..._.._................................._..__..._.. ................ . -
$424.00 ....__.._...._..__........................_
S.C.O.H. & P. (5%) 21.00
$445.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 445.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature • - /
WitDate January 8th 1993
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 85 (eighty-five)
NOTE:This Revision becomes part of,and in conformance with,the existing contract.
• � N
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 May 21, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
F1 ginl linnis 100 fakwond Blvd
EXISTING CONTRA NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Rebuild roof over round porch area toreconfigure drainage
to.. new scuppers.
Demolition of old framing ... $ 236.00
Building materials ... . 886.00
Carpenter labor .. 48 hrs. at $40 ... 1,920.00
Sheet metal scuppers . . 424.00....
Delete one down spout . ... (122.00)
$3,344.00
G.C.O.H. & P. . (15%) ... 502.00
$3,846.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,846.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature : 4 , _ Date May 21st 1992 -
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE • RDER NO. 39 (thirty-nine)
NOTE:This Revision becomes part of,and In conformance with,the existing contract.
j - \
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlquist & Lutzow 742-4063 June 3, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Flain I linois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Rebuild roof over round porch area to reconfigure drainage
to new scuppers, siding and fascia work.
Demolition of old framing $ 236.00
Building materials 942.00
Carpenter labor 52 hrs. at $40 2,080.00
Sheet metal scuppers . 424.00
Delete roof head (64.00)
Delete one down spout (122.00)
Roofing repairs .. 320.00
$3,816.00
G.C.O.H.....& P,....... (15%) 572.00
$4,388.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ $4,388.00 REVISED
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
---2Authorized Signature ��/ Date June 3rd 19 92
ONTRACTOR SIGNS HERE)
THIS IS CHANGE ORD R NO. 39 (thirty-nine) Revised
\ NOTE:This Revision becomes part of,and In conformance with,the existing contract. /
•
Agenda Item No.
�gVlf li`1Y�
February 4, 1993
TO: Mayor and Members of the City Council
FROM: Larry L. Rice, City Manager
SUBJECT: Change Order No. 6 and Final for Remodeling Work
at Lords Park Pavilion
PURPOSE
The purpose of this memorandum is to forward to the
Mayor and City Council Change Order No. 6 and Final for the
remodeling work at the Lords Park Pavilion.
elk BACKGROUND
Architects Dahlquist and Lutzow prepared plans and speci-
fications for the remodeling of the Pavilion. Subsequently,
a contract was awarded to Elgin Builders for the construction
which was begun on September 9, 1991. The rehabilitation
work on the building is now substantially completed.
Attached is Change Order No. 6 and Final from Dahlquist
and Lutzow regarding the remodeling work. The change order
includes eight items with a total net cost of $8,004 .00.
The architect will be present at the meeting of February
10th to answer any questions you may have regarding this
change order.
FINANCIAL IMPACT
The change recommended by the architects will result in
an $8,004.00 increase in the contract with Elgin Builders
from $1,078,519. 00 to $1,086,523. 00. There are sufficient
funds available in the 1991 Bond Fund and the 1992 Park budg-
et to finance the cost of this change order.
r
Mayor and Members of the City Council
February 4, 1993
Page 2
r
RECOMMENDATION
It is recommended the staff be directed to prepare a
resolution authorizing the execution of the above change
order with Elgin Builders for the Lords Park Pavilion.
Lar . Ricer city Manager
LLR:amp
Attachment
r
r