RESOLUTION
APPROVING CHANGE ORDER NO. 4 IN THE CONTRACT WITH
ELGIN BUILDERS, INC. FOR RENOVATION OF LORD'S PARK PAVILION
WHEREAS, the City of Elgin has heretofore entered into a
contract with Elgin Builders, Inc. for the renovation of
Lord's Park Pavilion; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 4,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 4, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: June 10, 1992
Adopted: June 10, 1992
Vote: Yeas 6 Nays 0
Recorded:
Attest:
sl Dolonna Mecum
Dolonna Mecum, City Clerk
Elgin, Illinois
•
RENOVATION OF THE LORD' S PARK PAVILION
CHANGE ORDER 4
SCOPE: This Change Order No. 4 covers additional work required
to complete construction changes for renovation of the
Lord' s Park Pavilion.
The Contractor for this project is Elgin Builders ,
Inc. , of Elain , Illinois .
REASONS FOR CHANGE:
This Change Order is required for the costs associated with the
items requested by staff to complete the following work.
1 . Removal of a deteriorated portion of the stone wall in the
Basement between the elevator and the toilets .
The circumstance necessitating this change was that upon
demolition of the adjacent work it was found to have lost
its structural integrity. This was an unforeseeable
existing site condition.
2 . Revision of Toilet accessories and amenities .
The reason necessitating this change is that it is in the
best interests of the City . This change was recommended by
the Parks and Recreation Department in order to improve the
day-to-day maintenance and the usability of the toilets .
3 . Provided additional exterior receptacles around the porch.
The reason necessitating this change is that it is in the
best interests of the City . This change was recommended by
the Parks and Recreation Department in order to provide
exterior program flexibility as well as allow for future
decorative lighting .
4 . Remove the existing concrete retaining wall at the north end
of the Pavilion and the adjacent sidewalk .
The reason necessitating this change is that it is in the
best interests of the City. This work would have been apart
of the future landscaping work around the Pavilion, but it
became logical to remove it at this time to coordinate with
the construction of the north stairs of the Pavilion.
5 . Installation of below grade roof drainage piping around the
Pavilion on all sides .
The reason necessitating this change is that it is in the
best interests of the City . This will eliminate a potential
slipping situation as water is emitted from the downspouts
below grade in lieu of on grade. The original design intent
was to maintain the existing downspout location. During the
course of construction, the City staff requested this as an
improvement to the original design.
6 . Removal of weathered and previously damaged porch deck
around the exterior of the Pavilion.
The reason necessitating this change is that it is in the
best interests of the City . This removal cost is based upon
unit costs asked for in the original specifications in
anticipation of potential deck replacement . Original deck
replacement was contemplated in the original contract , but
the exact amount could only be determined once the
rehabilitation was underway .
7 . Structural repairs required to brace and straighten the
roofs of the north and south wings .
The reason necessitating this change is that it was an
unforeseen condition . It was not until the contractor began
work around the perimeter that the condition became
exposed. It is a condition that has existed for decades ,
but remained concealed.
8 . Relocation of the downspout drainage of the round roof on
the west side of the Pavilion. This involves tearoff and
rebuilding the roof pitch and repair of the fascia to
accommodate the revised drainage. This work also includes
related clapboard siding replacement . The City staff and
the Architect requested this change in the roof system to
accommodate the roof runoff in a more efficient and
aesthetic manner.
The reason necessitating this change is that it is in the
best interest of the City. It will bring the downspouts
closer to the majority of the water runoff from the upper
roofs . It will also reduce the visual impact of the
downspout across the face of the brick wall below.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
The amount of the contract will be revised as follows :
ITEM COST CHANGE
Item 1 Add $ 6 , 706. 00
Item 2 Add $ 3 , 432 . 00
Item 3 Add $ 3 , 570 . 00
Item 4 Add $ 1 , 996 . 00
Item 5 Add $ 4 , 377 . 00
Item 6 Add $ 459. 00
Item 7 Add $70 , 510 .00
Item 8 Add $ 3 , 846 .00
Total Add $94 , 896 . 00
The present contract with Elgin Builders , Inc . is for
$959 , 965 . 00 . By reason of Change Order No . 4 the contract for
the Renovation of the Lord' s Park Pavilion will be increased in
the amount of Ninety Four Thousand Eight Hundred and Ninety Six
and 00/100 Dollars ( $94 , 896 . 00 ) . The new revised contract total
will be One Million Fifty Four Thousand Eight Hundred Sixty One
and 00/100 Dollars ($1 , 054, 861 . 00 ) .
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this /Itt day of , 1992 4-
4,
Recommended:
PARKSDZeARTMENT
By :
Accepted:
ELGIN BUILDERS , INC.
Party of the Second Part (Contractor)
By: Via,m.,/ .
Title:
Date :
Approved:
City
City of Elgin
Party of . he First Part (Owner)
By : /
Title :__AC—
A Y0hrid,n_a.e.,_
, II
Date : c.1 k—a_j ql-,
(7; N
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahiguist & IUt7OW
STREET 74?-4(16_3 MaY12
.100 NAME -- :1 19924U R
472 No. McLean Blvd. Lord's Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 Oakwoosi Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91
R-10-91 Elgin
You arc hereby authorized to perform the following specifically described additional work:
STRUCTURAL CHANGES PER SK-13 and 13A
. Shoring of floors for stone wall removal
stone. wall....-. Labor 2.4. hrs. @IR) 960.00
- materials disposal 15 yds. @15 225.00
_ Excavation and backfill for footings .240.00. ....... .. .... .......
_Concrete footing 196.00
____Masonry_changes N/C
_of_floor slabs_in _107, 108, 109, 117
Labor 32 hrs. @40 1 ,260.00
-Concrete"disposal 6 yds. @ $15 90.00
Excavate to lower grade _and gravel 386.00
Air compressor rental 246.00
_ft conc.rete ab @ $2..60 _1 ,716.00
_ T_w_o nem.sto_o_r_fra me s 256.00
-$5,831 .00---
G.C.O.H. & P. 15%
870
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 6,706.O0
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
lOWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature Date May 12, 1992
(CONTRACTOR SIGNS HERE)
Th5. S C WGE OFP Ft; rNi Q 23 (Twenty-three) REVISED
NOTE:This Revision becomes part of,and in conformance with,the existing contract.
..J�� r ;-rte A(�r •� !'•. r-w �• R r—r �^-�w^-. -� r^•,. .�
('1 . N n1 t' I'��':`+ /_'1 iI,..� + 1. �/-"�� !`,F .u`i / ��_.'.. ,.
�� 'r. li fi /. .\ . t' r r )r. ! {1':.i� '\J' ,` +�i�er + ti ..
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 May 12, 1992
STREET JOB NAME JOB NUMBER
472 No. McLean Blvd. Lord' s Park Pavilion 570
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
__.._...__.._._..._..___._CITY REQUESTED CHANGES PER SK-12 & 13A ...........- _... .... ._ .._........__......_____ —....__....._.___.._-__--
_..._...__.Lengthen_...counter...._top..._.. ...._..................... $86.00 _..
—____.__Chan.ges...._in. ha.throom....accessor.i es - 75.00..
.Stepmaster....floor in lieu. of specified ... . . 483.00
_.__._... ............. .......... . .._...._..........................
$64.4.00...._......._...........
Plumbing changes 983.00
__.....Elec.tr.ical.._.. .hand.-dryers)........... ........ . _
1 ,580.00
— - ..._.__.._.._..__.__._ ........_. ..2.,563..00._ . ..._......_ _—
128.00___-----..___��.
_ ................._.._.-. 3;432.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,432.00
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
1 2
Authorized Signature �-�-z Date ay 19 92
�5
(CONTRACTOR SIGNS HERE)
11-)i CS L CHANGE O ► . E \:1 0, _ 23A (Twenty-three A)- REVISED
\ NOTE:This Rovlelon becomes part ol.and In conformance MIA,the existing contract.
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlguist kJ lit7ow -742-40L3
JOB NAME . •
STREET JB r : •
472 No. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elgin Illinois 100 oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
IL
You are hereby authorized to perform the following specifically described additional work:
Eurnish_and_install_eight_(8.). xeceptacles-mounted-in-
balcony_fiusb_with_the_cetling. (Ckt...31. controlled.
via time clock)
Furnish and install six (6) receptacles low on the
exterior walls. (Ckt.331
$ 3,400.00
$ 4570_00_
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,570.00
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature Date May 12, 19 92
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE ORDER NO. 32 (Thirty-two)
\ NOTE:Thle Revision becomes purl of,end In conformance with.the evicting contract.
.y.
ADDITIONAL WORK AUTHORIZATION
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 ' May 12, 1992
STREET JOB NAME JOB NUMBER
472 No. McLean Blvd. Lord's Park Pavilion
CITY STATE STREET
El gin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
10-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Remove concrete wal k and retaininT wal 1 at north end.
Backhoe 8 Hrs. @ $80 $ 640.00
Labor 8 Hrs. @ $40 320.00
A-i-r-comp ress or-renta-1-----------
Concrete disRosal 2 loads @ 1110 220.00
Gravel backfill 110.00
----Black--dirt--' 120.00
Rake seed 80:00
260.00
,99_6_..00___
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 1 ,q9fi_no
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19_ Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications.at above stated price.
Authorized Signature Date May 12, 1992
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE 0 •DER NO 33 (Thirty-three)
\ NOTE:Thle Revision becomes part of,and In conformance with.the existing contract.
rt.7:11T 0 Tv A 0 7 N. !I:\ T 7/7\77:7:
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME
Dahlquist & I ut7nw 742-40.63 May 1992
STREET .100 NAME JOB NUMBER
472 H. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elwin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30.9_3 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Install underground P.V.C. piping, for roof and storm drainage. . _ _ _
130' of 6" P.V.C. installed at $10 $1,800.00
222' of 4" P.V.C. installed at $9.20 2,109.00
100' of 4" P.V.C. reused at $1.03
Cemented fittings destroyed $3,806.00_
& P. (15%) 571.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 4,377.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature Date May 15th 19 92
(CONTRACTOR SIGNS HERE)
;1 :; " INTr:\F,
„•Lf, A !I .; U . 35 (thirty-five) Revised
NOTE:This Revision becomes part of,and In conformance with.the exIallno contract.
; Yi '' (—)i.t\t•` r;'?.:`_. ^.1.Ir I: .i;7- �;.�' I'^�';�..r ,1'�..C"f,•,- ..�e�<'�� 7.? c 7;
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742.0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 May 15,1.992
STREET JOB NAME JOB NUMBER
472 N. Mclean Blvd_ 590
CITY STATE STREET
Elgin Illinois 100 Oakwood Blvd.
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin 11
You are hereby authorized to perform the following specifically described additional work:
Porch deck replacement as directed by Bruce Dahlquist.
67 sq. ft. at $6.85 $459.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 459-00
Payment will be made as follows: Sam as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications.at above stated price.
-
•
Authorized Signature Date May 15th 42
• (CONTRACTOR SIGNS HERE)
li
�
t. q,R7-7 '��`-: � ,� �4 •L. '41 f ' --- 3G (thirty-six)�------------
NOTE:This Revision becomes part of.and In conformance with.the existing contract.
st, 'or',1 ,: �yt 7r�,'{�"4•,i,(t..`Y ` ..f..: 'Trti ,fiC';�'A"'a!��•� �1�}
..%'�.h...../:.✓.i .r'. L) L�S J"'..1-. U L! tE irk`.. J`.•l.l.i� .a _ ..�J' 1:u::_.+�-�. L
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S 'PHONE DATE
NAME Dahlquist & Lutzovr 742-4063 May 19, 1992
STREET JOB NAME JOD NUMBER
472 N. McLean Blvd. Lord' s Park Pavilion 520
CITY STATE STREET
Elgin 111inois 100 Oakwood lilvd_
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Structural.. .repairs...to brace and straighten roof. _....__
- ..._. _......_......--.._._..Struct.u.ral_. steel $ 4,335.00..... ... . .. _._... .............. .__.
-.._......_._..:- Bui._1.ding....materials . 2,578.00.. ..... ....
Roofing._._..........._._. . ._...................._............_ ... . ..... 1,920.00. ........ ... .......................... -_.._...._...
Carpenter labor, 1312 hrs. at $40 . . 52,480.00 .
$61,313.00 _ .
�_..._....._.. _G_.._C_..0.H....& P. (.15%).
9,197.UO ....... ..._......... ..................-----..._.......... . .........__
— _.._.. . _._._........_....... ..... ........._............ ............_.._...... ... .... .. ... . . . .. $70,510.00_......._ ..... . .. ............._.... ---
•
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 70,510.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature erz�e�' tCO
�� Date May 19th 19 92
NTRACTOR SIGNS HERE)
1 IV-V 5 d'ti' r''��' `' ;i t., fl../"ti4.it L It"'')f!-�, y'?•i� (� 'I L/�
u u >; 1' ��`�U�L. ISS ;�:_ 'sem: iL\.O'. - 37__ h- seven)___-seve )---- - - -
- .t � n
NOTE:This Revision becomes part ol,and In conformance with.tho existing contract.
ELGIN BUILDERS INC.
1801 Larkin Avenue
ELGIN, ILLINOIS 60123
Phone (708) 742-0090
Fax (708) 742-0185
OWNER'S PHONE DATE
NAME Dahlquist & Lutzow 742-4063 May 21, 1992
STREET JOB NAME JOB NUMBER
472 N. McLean Blvd. Lord's Park Pavilion 520
CITY STATE STREET
Floin Illinois 100 Oakwood Blvd
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
8-30-91 Elgin IL
You are hereby authorized to perform the following specifically described additional work:
Rebuild roof over round porch area to reconfigure drainage
to new scuppers.
Demolition of old framing
Building material s
Carpenter labor. 48 hrs. at $40 1,920.00
Sheet metal scuppers 424.00
Delete one down. spout (122.00) ---
$3,344.00
G.C.O.H. & P. (15%) 502.00
$3,846.00
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 3,846.00
Payment will be made as follows: Same as contract
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature Date May 21st 1992
(CONTRACTOR SIGNS HERE)
Or';i-‘; 1'0 r\ 39 (thirty-nine)
%1..y kr..4-IL 1J cig en. 11‘.0L.i
NOTE:This Revision becomes part of.and in conformance with,the existing contract.
in
�
rAgenda Item No.
June 4, 1992
TO: Mayor and Members of the City Council
FROM: Larry L. Rice, City Manager
SUBJECT: Remodeling of the Lords Park Pavilion
PURPOSE
The purpose of this memorandum is to forward to the
Mayor and City Council recommendations concerning remodeling
of the Lords Park Pavilion.
BACKGROUND
elm
Architects Dahlquist & Lutzow prepared plans and specifi-
cations for the remodeling of the pavilion last summer.
Subsequently, a contract was awarded to Elgin Builders for
the construction work which was begun on September 9, 1991 .
Attached is Change Order No. 4 from Dahlquist & Lutzow
regarding the remodeling work. The change order includes
eight items with a total net cost of $94,894 . The most sig-
nificant item in the change order is No. 7, which deals with
increasing the structural stability of the pavilion roofs .
The cost for bracing and repairing the roof systems is
$70,510. The damage to the roof structure, which occurred
over the life of the building, was not apparent until it was
exposed during the remodeling process .
The architects. will be present at the June 10 meeting to
more fully explain the structural problems with the pavilion
roofs and to answer any questions you may have regarding the
change order.
FINANCIAL IMPACT
The change recommended by the architects will result in
a $94, 894 increase in the contract with Elgin Builders from
eft $959, 965 to $1, 064, 859 . There are sufficient funds available
in the 1991 Bond Fund and the 1992 Park budget to finance the
proposed work.
Mayor and Members of the City Council
June 4, 1992
Page 2
RECOMMENDATION
It is recommended the staff be directed to execute
Change Order No. 4 for the Lords Park Pavilion project.
a L. Ric, City Manager
LLR:amp
Attachment
r
DAHLQUIST and LUTZOW
architects, ltd. um
June 7 , 1992
Lords Park Pavilion
Change Order History
HIDDEN
CHANGE ORDER STRUCTURAL FIELD DESIGN
ITEM CHANGE CONDITION OPTION
Change Order No. 1
1 . Masonry/Foundation $ 47 , 155
2 . Porch columns $ 47 , 520
3 . Remove lath plaster
and reinsulate $ 4 , 149
4 . Rotten beams $ 2 , 016
5 . Replace wood doors $ 2 , 320
6 . Omit storm windows ( $17 , 519 )
Change Order No . 2
1 . Replace round porch
framing $ 3 , 900
2 . Remove bsmt columns $ 6 , 797
3 . Replace floor joists $ 5 , 972
4 . Switch gear revisions ( $ 500 )
5 . Redesign sewer ( $ 595 )
6 . Replace windows $ 2 , 864
Change Order No . 3
1 . Elevator door rev . ( $ 825 )
2 . Door 1 & 2 - new
frames $ 420
3 . Door hardware ( $ 102)
4 . Exist . rubble wall
removed $ 1 , 484
5 . Curbs and planters $ 5 , 499
6 . Relocate telephone
conduit $ 683
7 . Transformer pad
retaining wall $ 1 , 014
8 . Bathroom partitions $ 531
9 . Relocate vent $ 679
10 .Rotten joists $ 547
11 .Rotten base $ 524
Change Order No . 4
1 . Stone wall by
toilets $ 6 , 706
2 . Toilet accessories $ 3 , 432
3 . Exterior receptacles $ 3 , 570
4 . Conc . retaining wall $ 1 , 996
472 N. McLean Boulevard, Elgin, Illinois 60123 ER 708-742-4063 BE FAX 708-742-9734
HIDDEN
CHANGE ORDER STRUCTURAL FIELD DESIGN
ITEM CHANGE CONDITION OPTION
Change Order No. 4
(cont. )
5 . Below grade roof
drainage $ 4 , 377
6 . Porch deck $ 459
7 . Eave repairs $ 70 , 510
8 . Round roof revisions $ 3 , 846
=
TOTAL $177 , 073 $22 , 567 $ 9 , 789
Change Order Summary
Base Contract: $ 845 ,432
Contract thru C.O. #4 : $1 , 054 , 861
Summary of Change Order Items :
1 . Hidden Structural Changes : $177 , 073
2 . Field Conditions : $ 22 , 567
3 . Design Options : $ 9 , 789
TOTAL $209 , 429
Hidden structural changes were extraordinary conditions :
Delete $177 , 073
Field conditions and design option changes amount to $32 , 356
32 , 356/845 , 432 = 3% changes
DAHLQUIST and LUTZOW
architects, ltd. NM
June 4 , 1992
Lord's Park Pavilion
History of Eave Problem
1 . The structural survey in Preservation Plan identified the
overall roof problem. This roof problem began with the
improper design and construction of the upper roof 100 years
ago.
2 . The initial roof stabilization program undertaken prior to
the current construction project took care of the outward
thrust problem caused by the movement of the upper roof in
the large central room.
3 . The intent from the beginning of design was never to
straighten out the building, but leave in the existing
deflection . From a time and financial standpoint , it would
not have been practical to straighten out the building.
4. Since the existing structure was to be left alone,
destructive surveying and testing was not done. The
structural condition of the porch rafters pulling away from
the perimeter beam over the columns was not visible.
5 . Current construction activity provided us the opportunity to
see this "pulling away" condition . Upon close inspection,
it is evident that this condition has been in existence for
a substantial period of time. If the wood members were
properly attached over the years , the ends of the members
would not have weathered. However, the ends show the same
weathering as the adjacent exposed wood surfaces .
472 N. McLean Boulevard, Elgin, Illinois 60123 ME 708-742-4063 BE FAX 708-742-9734
cr. .
•
June 10 , 1992
Lord's Park Pavilion
Structural Eave Analysis
Preconstruction Conditions
•
�- am =L = 1�,i
`jam— � - —ji.F ;ice . i
i� �.= :�.==rte.= - `�-�,_�-ice.-_,�'�lF ';
/i4L �......�.-....-.--'..--:--e-----..=----,------ -- ------ ' -_ - x ._.--..
-•�= _ �__-
•
i
1 1
q I =•1
Q
111
11111111111111111 III!' .1
•r
UM
_ _ 1.1...,.. ....... I1�1PrrniTI I I I I I I I I I I I I ---n Fl"n -
t gGN__-.CEIt..ING,
RAFTERS --
EXISTINy eza.M
QluJ-L- -G1-AP CONCF�I.ED bENI►.tb
LG-N GIilll EKISTINGI MOULDING
ECTION T�-+RU PORGN C�ILLN
_S .
(21.--1
June 10 , 1992
Lord ' s Park Pavilion
Structural Eave Analysis
Construction Condition
,\
a'
1
.-1411111‘1116** :
lroil
`,44.....4 ..:IL \ O
' A i
i j�
/ .0'
...lg.
1 • •
Cf
June 10 , 1992
Lord' s Park Pavilion
• Structural Eave Analysis
Construction Condition - (continued)
i
1
I! 11
I
I \ I Will ______
t J
Ai ___
t.,. 1111.11.1111111111111
PO RCN _.GEILINo,
RAFTCRS-..
EXFflNO SEA M
7
- 5ECAME XPO t)
POcGH �EGDME EXPO 5 eC
CE1LtNGI DU2INC, CoNSTRUCTIo14
SECTION THRU PORCH CEILING-4