HomeMy WebLinkAbout92-0325 Toll Highway ROW Permit 9a-O35
RESOLUTION
AUTHORIZING EXECUTION OF AN APPLICATION FOR PERMIT TO USE
TOLL HIGHWAY RIGHT OF WAY
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that George VanDeVoorde, Mayor, be and is hereby
authorized and directed to execute an Application for Permit
to Use Toll Highway Right of Way on behalf of the City of
Elgin to permit the construction, installation, operation and
maintenance of a water main, a copy of which is attached
hereto and made a part hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: March 25, 1992
Adopted: March 25, 1992
Vote: Yeas 5 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
Elm
Agenda Item No . 8 ( 13 )
47
TO: Mayor and Members of the City Council
FROM: City Manager
DATE: March 17 , 1992
SUBJECT: Northwest Corridor Water Main Phase I
Illinois State Toll Highway Authority Permit
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider executing the subject permit.
BACKGROUND: The design of the Northwest Corridor Water Main
Phase I is complete and ready for bid. As part of the permit
process it is necessary to secure the permission of the Illinois
State Toll Highway Authority to cross under its right-of-way.
(P. This crossing will be directly north of the Alft Lane water
tower. This water main is designed to serve the area north of
the tollway along the Randall Road corridor.
FINANCIAL IMPACT: The cost of insurance and bonds for this
work will be included in the contract documents for the work
provided by the successful bidder for the construction of the
water main. The authority requires a review fee of $1,700.00
and an annual maintenance fee of $500. 00 payable at the time of
application.
RECOMMENDATION: It is recommended that the City Council
authorize the Mayor to sign the "Application For Permit To Use
Toll Highway Right-Of-Way" with the Illinois State Toll Highway
Authority and tha the applicable fees be paid. A copy of the
permit is .ttach:. your consideration.
gitLarry . . *ice, Manager
Attachment
LLR:LED: jk 01140316 . 192
cc: Jim Kristiansen, Public Works Director
C
APPLICATION FOR PERMIT47)
TO USE
TOLL HIGHWAY RIGHT OF WAY
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
(Submit Five Copies)
APPLICANT City of Elgin
150 Dexter Court Street
City Elgin State Illinois 60120-5555
(1) The applicant hereby applies to The Illinois State Toll Highway Authority (hereinafter called
"Authority" to grant a concession consisting of a permit to: (Briefly describe proposed use of Toll
Highway Right of Way).
Applicant is requesting permit approval to construct, install , operate, and
maintain 290 lineal feet of 16-inch water main, encased in a 30-inch steel
casing pipe augered and jacked, as shown on the attached plan and profile
drawings which are made a part of this application.
4111)
(2) Location of Toll Highway Right of Way to be used by Applicant:
Northwest Tollway
(a) Tollway Route 0-90) (e) County Kane
(b) Tollway Mile 27'2 + (f) Nearest Cross Road Randall Road
(c) Tollway Station 2180+00 to the East
(d) Sec. 30 Twp. 42 _ N., R. 8 E. (g)
(3) The Applicant attaches hereto and makes a part hereof plans and specifications of structure which
use Toll Highway Right of Way. Applicant agrees to furnish such additional plans and specifications of
structure as the Authority may request. In the event a permit is issued, applicant agrees to construct such
work in accord with the plans and specifications submitted to and approved by the Authority.
(4) The applicant further agrees and understands that the concession in the form of a permit herein
requested, if issued, does not sell, lease, create an easement, or otherwise dispose of or encumber the Toll
Highway Right of Way, or any part thereof, and does not create any charge or lien on the revenues of the
Toll Highway.
(5) The applicant further agrees that, in the event a permit is granted, applicant will, before All)
commencing work under the permit, comply with all the Utility Policy & Regulations as adopted by the
Authority on August 31, 1972 as amended and the acceptance, notice, bond and insurance requirements of
the Authority, as set forth in the permit.
—1-
10/79