Loading...
HomeMy WebLinkAbout92-0212 Wil-Freds Change Order 11 RESOLUTION APPROVING CHANGE ORDER NO. 11 IN THE CONTRACT WITH WIL-FREDS FOR THE SLADE AVENUE WATER FACILITY WHEREAS, the . City of Elgin has heretofore entered into a contract with Wil-Freds for the Slade Avenue Water Facility; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 11, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 11, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: February 12, 1992 Adopted: February 12, 1992 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk S r ELGIN, ILLINOIS SLADE AVENUE PUMPING FACILITY CHANGE ORDER NO. 11 SCOPE: This Change Order #11 covers additional changes in the scope of work at the Slade Avenue facility that were not anticipated under the original contract for the work and are in the best interests of the City. Items_ covered in this change order are for: 1) electrical conduit rerouting and 2) plumbing modification. This contract for construction is with Wil-Freds Construc- tion, Inc. , of Naperville, Illinois. REASONS FOR CHANGE: 1. Change Proposal #32 is for additional pipe, pipe fittings, and a double check valve required by the cross connection control ordinance on fire protection services. This item was noted upon review by the City's Bureau of Inspection Services as not being provided for due to oversite by the City in the original bid documents. 2. Change Proposal #33 is for labor and extra material necessary to reroute electrical conduits in the meter shop so that they would not pass directly under the skylights as originally shown. This modification cleans up and makes the skylight area more attractive and functional . This design defect was not noticed by the City during original plan review. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: ITEM ADD #1 Change Proposal #32 $4,517.70 #2 Change Proposal #33 1,370.36 TOTAL NET ADDITIONAL COST $5,888.06 The original contract with Wil-Freds Construction, Inc. , was for $3,694,400.00 (three million, six hundred ninety-four thousand, four hundred dollars) . Previous change orders amounted to $194,659.63 (one hundred ninety-four thousand, six hundred fifty-nine and 63/100 dollars) and, with the change order amounting to $5,888.06 (five thousand, eight hundred eighty-eight and 6/100 dollars) , the total contract will be for $3,894,947.74 (three million, eight hundred ninety-four thousand, nine hundred forty-seven and 74/100 dollars) . ELGIN, ILLINOIS SLADE AVENUE PUMPING FACILITY CHANGE ORDER NO. 11 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. The date for substantial completion of work under the contract will be December 12, 1991. The date for completion of all work under the contract will be August 11, 1992. Agreed to this j<?�.kifv day of ,c- ke.Ac 1992. Recommended: CLARK DIETZ, INC. Engineers and �oArchitect B Date: //l4/(1-2.-- WATER DEPARTMENT: By: Title: Date: Accepted: WIL-FREDS CONSTRUCTION, INC. Party of the Second Part (Contractor) By: Title: Date: � �` Approved: CITY OF ELGIN Party of F ! 13iI ! ier) By: ■ .s...& Title: c / YA.A4.4• �� Date: / 3�9 0107-M6I • 111 Elve ,[ -=,y Agenda Item No. o �4oRg1tD FEg10 TO: Mayor and Members of the City Council FROM: City Manager DATE: January 14, 1992 SUBJECT: CHANGE ORDER #11 WITH WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE FACILITY PURPOSE: This memorandum will provide the Mayor and Council with information to consider authorizing Change Order #11 with Wil-Freds Construction for modifications to the Slade Avenue facility. BACKGROUND: During the review of the plans for the Slade Avenue facility, it was noted by the Bureau of Inspection Services that a check valve had been overlooked on the fire protection system. Change Proposal #32 is for the additional pipe, pipe fittings, and the check valve required by the City's cross connection control ordinance on fire protection systems. As this facility was being built, it was noted that several electrical conduits located in the roof area of the meter shop would pass beneath the skylights on an internal wall. To make this area more attractive and leave the skylights unblocked, it was decided to reroute these conduits. Change Proposal #33 is for the material and one-half the labor involved in this rerouting. An agreement was reached with Althoff Industries to split labor costs for this project. FINANCIAL IMPACT: Due to favorable bid conditions on a recent water main project, there are sufficient funds in the Water Department's operating account to pay for this change order in the amount of $5,888.06 . r Page 2 RECOMMENDATION: It is recommended that the City Council approve this Change Order #11 wit ,,W -Freds for $5, 888 .06 . l CL:G� .C-C—<_.—C-- Ciy ager LLR:LED: jk 01140110 .392 cc: Jim Kristiansen, Public Works Director Attachment. I