HomeMy WebLinkAbout92-0212 Donohue And Associates No.2 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH DONOHUE & ASSOCIATES, INC. FOR WATER DISTRIBUTION SYSTEM IMPROVEMENTS WHEREAS, the City. of Elgin has heretofore entered into a contract with Donohue & Associates, Inc. for engineering services for water distribution system improvements at the Lyle Avenue booster station and Randall Road tower; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: February 12, 1992 Adopted: February 12, 1992 Omnibus Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk CITY OF ELGIN, ILLINOIS WATER DISTRIBUTION SYSTEM IMPROVEMENTS CHANGE ORDER NO. 2 FOR ADDITIONAL ENGINEERING SERVICES AT LYLE AVENUE BOOSTER STATION, AND RANDALL ROAD TOWER SCOPE: This change order covers additional construction engineering services required when construction completion was delayed beyond the contract time allowed in the original engineering agreement. The original and actual construction dates are as follows: Randall Road Tower (by CBI-NaCon) : Construction contract completion date at time of award 9/1/90 Actual partial acceptance date 10/30/90 Actual final acceptance date 7/19/91 Lyle Ave. Booster Station (by Kovilic Construction Co. , Inc. ) : Construction contract completion date at time of award 8/1/90 Actual partial acceptance date 11/5/90 Actual final acceptance date 7/15/91 This change order also incorporates a claim for additional work from the booster station contractor (Kovilic Construction Co. , Inc. ) . This claim covers additional work required to support the booster station roof structure. The work included foundation modifications and masonry wall modifications to provide support pilasters for the ridge beam that were not shown on the plans. The consultant operating under contract to the City of Elgin is Donohue & Associates, Inc. of Schaumburg, Illinois. This is a change order to the Engineering Agreement between Donohue and the City, dated January 5, 1989 for the referenced project. REASON FOR CHANGE: 1. Donohue's agreement included fees for construction engineering services assuming construction work would be completed by September 1, 1990. Due to delays in getting electrical service installed Donohue was required to spend additional time on site observing contractor activities. Coordination of electric service installation by Commonwealth Edison was solely the responsibility of the construction contractor. These delays required Donohue to have a construction engineer available for an additional two months at the booster station and three months for the tower. Additionally, as shown above both contractors required several months of assistance, after partial acceptance of their work, to complete final punchlist items, make operation and maintenance submittals, and submit final payment requests. These circumstances were not reasonably foreseen at the time the contract was signed. 2. After construction of the booster station had begun, Donohue determined that the plans had omitted a ridge beam, and wall pilasters. Construction had been completed to the point that addition of the pilasters and foundation support could not be conveniently completed without causing rework by the contractor. Because the plans had not originally shown the foundation and wall pilaster work and because this caused rework by the contractor, the cost of rework will be deducted from Donohue's contract. This change is germane to the original contract as signed and in the best interest of the City. SUMMARY OF CHANGES TO CONTRACT: The amount of the contract will be revised as follows: Original Contract Amount $112,000.00* Previous Changes to Contract $ 15,000.00 Previous Adjusted Contract Amount $127,000.00* Additions this Change Order $ 9,491.00 Deductions this Change Order $ 5,934.56 Final Adjusted Contract Amount $130,556.44* *This amount does not include soil borings, which are invoiced at cost to the City. Total soil boring cost $5,807.50. 2 • OTHER CONTRACT PROVISIONS: All other contract provisions shall remain as previously agreed. Agreed to this MA day of ,�J— , 199T, Recommended: Water Division n By: (e/i1,:V7 j!, L c/ Date: /// 41/9 C Accepted: Donohue & Assoc'ates, Inc. By: jf ,f.4," ( GL 1/t/V Title: Vic 17/e,ricenir Date: pec. 0?6 1`?9/ Approved: City of Eleinid, By: ,, Title: _. I/ t , Date: / T/MI/LB1 3 • in :14V-7,7 °F E< Agenda Item No. O � %ED Ftt TO: Mayor and Members of the City Council FROM: City Manager DATE: January 14, 1992 SUBJECT: CHANGE ORDER #2, ADDITIONAL ENGINEERING SERVICES AT LYLE AVENUE BOOSTER STATION AND RANDALL ROAD TOWER WITH DONOHUE & ASSOCIATES, INC. PURPOSE: This memorandum will provide the Mayor and Council with information to consider authorizing Change Order #2 with Donohue & Associates, Inc. , for additional engineering services at the Lyle Avenue booster station and Alft Lane tower. BACKGROUND: Delays by Commonwealth Edison in installing the electric service to the Alft Lane tower required additional construction related services by Donohue. Additionally, there were delays in obtaining necessary material from the contractors to complete their final punch list and in maintenance manual submittals, which further extended the time the engineering firm spent on this project beyond the anticipated completion date. This change order also reflects a deduction of $5,934 .56 due to an oversight during the design stage by the engineering firm. This was due to an omission of a ridge beam and wall pilasters. As this caused some rework by the contractor, the cost thereof is being deducted from the Donohue contract. FINANCIAL IMPACT: The net adjustment to this contract amount is an additional $3,556 .44 . These funds are available from the Water Department's contingency fund due to favorable bid conditions on the recently bid water main project. tow Page 2 RECOMMENDATION: It is recommended that the Council authorize payment of Change Order #2 to Don ue & Associates, Inc. , for a total of $3,556 .44 . City Marthger LLR:LED: jk 01140110 .492 cc: Jim Kristiansen, Public Works Director Attachments 47)