HomeMy WebLinkAbout92-0122 Wil-Freds Change Order 9 RESOLUTION
APPROVING CHANGE ORDER NO. 9 IN THE CONTRACT WITH
WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE FACILITY
WHEREAS, the City of Elgin has heretofore entered into a
contract with Wil-Freds Construction for the Slade Avenue
facility; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 9,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 9, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: January 22, 1992
Adopted: January 22, 1992
Omnibus Vote: Yeas 6 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
•
111
Agenda Item No.
4p�pglED
TO: Mayor and Members of the City Council
FROM: City Manager
DATE : December 10, 1991
SUBJECT: SLADE AVENUE FACILITY CHANGE ORDER #9, WIL-FREDS
CONSTRUCTION
PURPOSE:
This memorandum will provide the Mayor and Council with
information to consider authorizing Change Order #9 with
Wil-Freds Construction regarding telephone service at the Slade
Avenue facility.
BACKGROUND:
When the Slade Avenue facility was being designed and equipment
specifications drafted, the City was using a different phone
system. This discrepancy was noted when the phones for the new
facility were being ordered. To maintain consistency within the
City, it is prudent to switch when the phones are installed.
FINANCIAL IMPACT:
The net cost to the Water Department for this substitution will
be $1,803.26, including a credit of approximately $2,480. There
are sufficient funds in the Water Department's operating budget
to provide funds for this change order.
r
Page 2
RECOMMENDATION:
It is recommended that the City Council authorize Change Order
#9 with Wil-Freds Construction for $1, 803 . 26 for the
installation (3, system consistent with City equipment.
j
Ci--t-f `Manage
LLR:LED: jk 01141210.491
cc: Melford A. Dahl, City Engineer
Attachment
47)
•
t •
;CDI CLARK DIETZ, INC.
•
•
Request for 1817 S. Neil , Suite 100
Authorization
P.O. Box 676
Of Changes • Champaign, IL 61820
217/373-8900
TO Mr. Larry Deibert PROJECT Slade Avenue Facility
Director of Water Operations DATE 11/19/91 JOB NO E04020
City of Elgin CITY Elgin COUNTY Kane
150 Dexter Court STATE Illinois •
Elgin, IL 60120-5555 CONTRACTOR Wil-Freds Construction
CHANGE ORDER NO. 9
•
GENTLEMEN: SHEET NO. 1 OF 3
The following changes) from the plans in the construction
of the above designated project is recommended.
ITEM(S) ADDITIONS DEDUCTIONS
See attached documents.
•
Change .Proposal #34. $ 1 ,803.26
•
The Contract Price for this Change Order will be
( increased) 6444000%00 .by the Amount of this Order: $ " 1 ,803.26
Amount of Previous Orders: $ 127 ,537.42
The work covered by this order Original Contract Amount: $3,694,400.00
shall be performed under the Original Contract Amount and Orders: $3,823,740.68
same terms and conditions as •
that included in the original
Contract.
•
The Contract Time will be Q1 #i(d0(t(W 00cx- a0 (Unchanged) by 0 calendar
days (this C.O. ) .
The date for completion of all work under the contract will be August 11 , 1992 •
The date for substantial completion of work under the contract X11 be December 12, 1991 .
Approval Recommended: Approved :y:
•
• I���'CJ�C r .
Resident Project Repr _entative OwnElr' . ' epre five
Approval Recommended: Accepted by:
• 4111111rr _.. ---
Clark, Dietz, Inc. CcntracLor
•
•
•
SLADE AVENUE FACILITY CHANGE ORDER #9, WIL-FREDS CONSTRUCTION
When the Slade Avenue facility was being designed and
' equipment specifications drafted, the city was using a
different phone system. This discrepancy was ,noted when-• the
phones for the new facility were . being ordered. To maintain
consistency with3,n_,the .city, it is . prudent to switch when: the
phones are installed. .Therefore it is in the beet interests
of the ,city that. this- change be executed.
1E
„,.0(
4,` U
i 1'
(" )
•
•
•
•
•
•
•
•
WIL-FREDS
P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897 4000
October 29, 1991
�< OCT3 1991
Clark Dietz Inc.
1817 S. Neil
Suite 100
Champaign, IL 61820
Attn: Marty Vogel
Re: Slade Avenue Facilities - Elgin -
Change Proposal #34
Dear Marty:
Enclosed is the submittal for the owner's requested radio equipment for your
review and approval. The additional cost for this change is $1,803.26 with the
breakdown as follows:
Althoff net add (see attached) 1,639.33
WFS 10% Management Fee 163.93
Total proposed amount $1,803.26
We trust this meets with your approval and await issuance of a change order.
Yours very truly,
WIL-FREDS CONSTRUCTION, INC.
,t7V" q
H.W. Kleywe
Project Manager
Enclosure
cc: CP #34 File
HWK:dl
c-d10.29
274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
•
ADDITIONAL WORK AUTHORIZATION
ALTHOFF INDUSTRIES
8001 S. Route 31
CRYSTAL LAKE, IL 60014-9099
Phone 815 455-7000
OWNER'S Wil-Freds, Inc. (ATTN. : Butch Kleyweg) °NE(708) 897-4000 °"Oc
NAME tober 22, 1991
STREET JOB NAME JOB NUMBER
274 E. Indian Trail Slade Avenue Facility EM 2724
CITY STATE STREET
Aurora Illinois 60505 0 Slade Avenue
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
Elgin Illinois
You are hereby authorized to perform the following specifically described additional work:
TELEPHONE EQUIPMENT
•
Scan-AM CREDIT =($ 2,480.00)
Radicom ADD = 3,905.50
$ 1,425.50
+15% = 213.83
TOTAL ADD = $ 1,639.33
•
•
•
ADDITIONAL CHARGE FOR ABOVE WORK IS: $. 1.639.33
•
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above speclfications,at above stated price.
Authorized Signature � Date October 22, 1991
(C NT A ll 31pNS HERE)
THIS IS CHANGE bdletvffRPRiNt Manager
NOTE: This Revision b.com.•p..1 01.and In conformance wMh,tM•alattnp CnnU.Ct. .4'
TELEPHONE 708/695-6500
Ho FAX 708/931-5610
FOR HEARING IMPAIRED
TDD 706/931-5616
CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555
41110.-
January 6, 1992
Mr. Don Dillenburg, P.E.
Acting Manager, Permit Section
Division of Public Water Supplies
Illinois Environmental Protection Agency
P.O. Box 19276
Springfield, IL 62794-9276
Dear Mr. Dillenburg:
The project titled "Valve Replacement and Repairs to the Slade Avenue
Reservoirs, " project construction permit #0389-FY1990, which you
referred to in your letter dated December 17, 1991, has been combined
with project "Slade Avenue Facilities, " permit #0157-FY1991, for
construction. These projects were bid and awarded for construction by
the Elgin City Council on September 26, 1990.
The entire project is still under construction and should be completed
during 1992.
Should you have any questions or require additional information, please
contact me at (708)931-6155.
Sincerely,
Larry E. I)eibert (V tJ
Director of Water Operations
LED:jk 21210106. 192
cc: Melford A. Dahl, City Engi eer
Loni Mecum, City Clerkl
Larry L. Rice, City Manager
Michael H. Winegard, Consoer, Townsend & Associates, Inc.
(iE)