HomeMy WebLinkAbout91-1106 Wil-Freds Change Order 8 RESOLUTION
APPROVING CHANGE ORDER NO. 8 IN THE CONTRACT WITH
WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE WATER FACILITY
WHEREAS, the City of Elgin has heretofore entered into a
contract with Wil-Freds Construction for the Slade Avenue
water facility; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 8,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 8, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: November 6, 1991
Adopted: November 6, 1991
Omnibus Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
CHANGE ORDER CERTIFICATION
Hon PROJECT: Slade Avpnnp Fac tl i t-y
DATE: Sept-pmher 17, 1991 CHANGE ORDER NO. : 8
By provisions of the Illinois Criminal Code, whenever there is a change in a
contract other than as specifically provided for in the contract which
authorizes or necessitates an increase or decrease in the cost of $10,000 or
more or in the time of completion by 30 days or more, a written
certification must be made that the circumstances said to necessitate the
change in performance were not reasonably foreseeable at the time the
contract was signed, were not within the contemplation of the contract as
signed or are in the best interest of the city. The certification should
recite the particular reasons for the determination made.
•
Identify circumstances, etc. , as required above:
Change Proposal #10.
A credit issued due to a change from rigid conduit to Schedule 40 PVC conduit for
site electrical routing. It was in the best interest of the City to accept an
equivalent pipe material at a cost savings.
Change Proposal #27.
Additional time and material incurred for the installation of two - 4" PVC
conduits. The conduits will be utilized to supply permanent electric power to the
new facility. The conduit's installation was not within the contemplation of
the contract due to the fact that Com Ed had not provided the information during
the design stage.
The design of this facility was completed and bid accepted prior to completion of
utility company engineering. Thus the location and other details of the design were
unknown at the time of the bid. The final C. E. Co. engineering required that
underground service be supplied; reference the attached Commonwealth Edison Co.
service entrance location sketch and paragraph 4.08 of Information and Regulations
for Supply of Electric Service, Commonwealth Edison Company, Illinois Commerce
Commission #9, March 19, 1989.
Approval Recommended:
Co sultant's Repre ntative
Accepted By: Accepte• By: _
•
IMOWARAVEVAMM
Contrac or' Representative Owner's Repr-s :ntative
CHANGE ORDER CERTIFICATION
E15 PROJECT: Slade Avenue Facility
DATE: September 17, 1991 CHANGE ORDER NO. : 8
By provisions of the Illinois Criminal Code, whenever there is a change in a
contract other than as specifically provided for in the contract which
authorizes or necessitates an increase or decrease in the cost of $10,000 or
more or in the time of completion by 30 days or more, a written
certification must be made that the circumstances said to necessitate the
change in performance were not reasonably foreseeable at the time the
contract was signed, were not within the contemplation of the contract as
signed or are in the best interest of the city. The certification should
recite the particular reasons for the determination made.
Identify circumstances, etc. , as required above:
Change Proposal #29.
Additional time and material incurred by the electrical contractor for installation
of additional equipment. The ,rovision of additional electrical equipment was not
within the contemplation of the contract due to the fact that the additions were
requested during shop drawing review by the City. Protection provided by this
electrical equipment is in the best interest of the City.
This protection is for 6 wells and 5 pumps,• the cost of repairing one well once
approaches the cost of this change. Unfortunately, this was overlooked prior to
shop drawing review.
•
•
Approval Recommended:
Consultant's Re esentative
Accepted By: • Accepted
Contractor's • -presentative • er's Re esentative
di
i' EERTICE RirlitAI10E LOCATION EKETC7
this information for the customer and electrical contractor end/or architect
roe G I7 '/ D F El_6,1 1! ! SLAP) !` AN/r: • (� ro Y r.. i•JER l�_1_iS (iJ
For a connected load of k.w. light, and h.p. special and estimated total maximum
demand of ZYbO k.w. 7 J / /b/ /n►or class of business J"UMN6 i t r'/0 /U Service voltage 2- / ✓ �, LJ' A ‘'
The Ci .tomer'a electrical contractor should secure the approval of the appropriates Municipal Authority and
le responsible for verifying that there is no conflict with these plans on property. In addition, the
Commonwealth Edison Company's IC.s.Co.'e) took of Information and Requirements for the supply of Electric
service must be complied with. This location is contingent upon there being no objection to crossing ad-
jacent property with service wires, if necessary, es well a■ all required permits being issued and
easements being recorded. The location given is for location and/or may reault in additional charges to the
Customer. where applicable, the Customer's underground conduit should not be !metalled in advance of C.E.Co.'a
conduit. Approval of this extension will constitute the Customer's approval of the service location as shown
below.
Any changes in or revisions of this plan required by the Customer, appropriate Municipal Authority or other
outside agent, or necessitated by abnormal or unforseeable conditions may result in additional charges to the
Customer. Charges that have been calculated assuming that C.E.Co. will be performing this work jointly with
the Telephone Company may be ,subject to increase if the work is not actually done on this basis.
SNORT CIRCUIT CQRREWT Ka/, r�Fo2h-1E/
LI-3?112 ., Y-67r,
The short circuit current which can be delivered from Commonwealth Edison Company's system, calculated at the
first point(s) of connection between Edison-owned facilities and those of the Customer. such point(sl being
situated as shown on attached sketch, is '/, C'nT ampere• symmetrical ram hase, at
� phase, Y1 /L1 Kvolt..
This value is derived from calculations involving a C.E.Co, transformer as sized on the attached sketch and
may increase without notice if the transformer is upgraded at a later date.
The electrical characteristics of circuits used in extending from the aforementioned point(sl and those of
your rotating equipment will affect the short circuit duty imposed on your electrical facilities.
we suggest that this information be conveyed to the designer of your electrical system to enable him to
specify an adequate and economical installation.
SNORT CIRCUIT CURREI►T
7- r:/! .r-. ! -,7_ , t7 , . 7
The short circuit current which can be delivered from Commonwealth Edison Company's system, calculated at the
first point(s) of connection between Edison-owned facilities and those of the Customer, such points) being
situated me shown on attached sketch, is ;ar ' amperes symmetrical ems 3 phase. at '-/ T T volts.
This value is derived from calculations involving a C.E.Co. transformer as sized on the attached sketch and
may increase without notice if the transformer is upgraded at a later date.
The electrical characteristics of circuits used in extending from the aforementioned point's! and those of
your rotating equipment will affect the short circuit duty imposed on your electrical facilities.
Me suggest that this information be conveyed to the designer of your electrical system to enable him to
specify an adequate and economical installation.
COMMONNEALTR EOISON COMPANY LOCATION PLM1 TOR
Marketing and Engineering Department• ELECTRICAL FACILITIES
REVIEWED AND APPROVED Ef,
nyt ...T-U 1=_.t ' I.: =)' . i s Li I
Marketeer Phone 0"-'VIeliS /v1 t!<// v),f.
/ -7 CUSTOMER'S ME ER'S NA (Pleasi print)
Oates 6f,r.i.,, Engineer _ 1
('L�'r14=r' G)'' r
Approved: i,.:. y f I/ k^C'�C'i / f.'i' !. i/.. r
TITLE,
4-'�, 7ii. . i t
'CUSTOMER'S SICNATUIRI{ /DATE
i
FACE / or
511 t i.J F (\C. �c- ti,
CUSTOMER TOt !AS MARRED)
❑ I. PROVIDE AND RECORD NECESSARY CASEMENTS FOR ROTH C.E.CO. AND THE TELEPHONE COMPANY AS BROWN. CUSTOMER 70
RETURN TWO COPIES OF RECORDED EASEMENTS TO C.E.CO. MARKETING DEPT. BEFORE ANY WORE OK CUSTOMER PROPERTY
WILL BEGIN.
!21 2. BE RESPONSIBLE FOR PROPERTY LINE STAKES.
3. NOTE THAT PRIOR TO TRENCHING OPERATIONS, THE CUSTOMER SHALL HAKE THE EASEMENT STRIP OR CABLE ROUTE
ACCESSIBLE TO C.E.CO. EQUIPMENT, SHALL MOVE ALL OBSTRUCTIONS FROM SUCH STRIP, INCLUDING ASPHALT AND
ASPHALT BASE. AND SHALL ARRANGE THAT THE GRADE OF THE STRIP WILL NOT BE ABOVE, NOR MORE THAN FOUR
INCHES BELOW FINAL GRADE. C.E.CO. WILL NOT TRENCH IN AREAS WHERE ABRASIVE CONDITIONS EXIST.
❑ 4. INSTALL TRANSFORMER FOUNDATION, ASSOCIATED CONDUITS AND BENDS (4" MINIMUM CONDUIT TO BE SUPPLIED FOR
C.E.CO. PRIMARY CABLE INSTALLATION, SECONDARY CONDUIT AS INDICATED) AND TRENCH FOR GROUND WIRE PER
C.E.CO. SPECIFICATIONS C5285 AND (COMMUNITY BANK) (COPIES ATTACHED).
5. INSTALL, OWN, AND MAINTAIN TRANSFORMER FOUNDATION, ASSOCIATED CONDUITS AND BENDS (4" MINIMUM CONDUIT
TO Be SUPPLIED FOR C.E.CO. PRIMARY CABLE INSTALLATION, SECONDARY CONDUITS AS REQUIRED) AND TRENCH FOR
GROUND WIRE PER C.E.CO. SPECIFICATIONS C52B5 AND C5 ,7, , i--(E.S.S.) (COPIES ATTACHED).
CI Z.,Co.L_
❑ 6. WHEN THE OUTER EDGE OP TRANSFORMER PAD IS CLOSER THAN THREE FEET FROM BUILDING WALL, THE NETER PANEL WILL
NOT BE PLACED ON THE WALL WITHIN THE AREA BETWEEN TRANSFORMER PAD AND BUILDING WALL.
❑ 7. INSTALL, OWN, AND MAINTAIN VEHICLE BARRIERS PER C.E.CO. SPECIFICATION C5295 (COPIES ATTACHED).
vl, B. CALL MARKETEER PRIOR TO FORMING AND POURING TRANSFORMER FOUNDATION AND VEHICULAR BARRIERS.
IY1 9. TRENCH AND INSTALL CONDUIT THAT IS RODDED AND CAPPED WITH A FULL LINE AS SHOWN ON SKETCH AT A MINIMUM
��� DEPTH OF 70 INCHES. CUSIOMER WILL NOT OBSTRUCT CABLE ROUTE ACCESSABILITY WITH PAVEMENT UNLESS CONDUIT IS
INSTALLED.
❑10. EXTEND SERVICE CONDUIT(S) A MINIMUM OF TWO (2) FEET INTO UNDISTURBED EARTH OUTSIDE BUILDING WALL.
0 11. INSTALL SERVICE ATTACHMENT AT BUILDING AT HEIGHT OF ABOVE FINAL GRADE. _
1u 12. INSTALL, OWN AND MAINTAIN SECONDARY CABLE OR WIRE TO C.E.CO. TRANSFORMER (UNDO)/POLL (OVHD). CABLE TO
7 BE OF SUFFICIENT LENGTH TO REACH C.E.CO. SECONDARY AT TOP OF POLE (OVND).
11IJ. CUSTOMER TO FURNISH LUGS AND CONNECT AT SWITCH.
'❑' 14. NOTE THAT THE LARGEST C.E.CO. 120/240 VOLT THREE PHASE COMPARTMENTAL TRANSFORMER INSTALLATION
AVAILABLE HAS A MAXIMUM CURRENT RATING Or 800 AMPERES. DUE TO PHYSICAL LIMITATIONS. THERE MAT NOT
BE ENOUGH ROOM WITHIN THE TRANSFORMER TO CONNECT CERTAIN CABLE CONFIGURATIONS AND A JUNCTION BOX (TO
BE FURNISHED BY THE CUSTOMER PER C.E.CO. SPECIFICATION C5290) KAY BE REQUIRED. CONTACT MARKETEER TO
TO DETERMINE IF A CONFLICT EXISTS.
,/K(15. WITHSTAND SELF-INDUCED FLICKER AND WHERE'ANY OF THE CUSTOMER'S UTILIZATION EQUIPMENT HAS CHARACTERISTICS
WHICH. IN THE COMPANY'S JUDGMENT, MAY CAUSE INTERFERENCE WITH SERVICE TO OTHER CUSTOMERS OR RESULT IN
OPERATION AT A LOW POWER FACTOR, THE CUSTOMER SHALL, AT THE REQUEST OF THE COMPANY. PROVIDE SUITABLE
FACILITIES TO PRECLUDE SUCH INTERFERENCE OR IMPROVE SUCH POWER FACTOR, OR ROTH, AS THE CASE MAT BE.
OTHERWISE, THE COMPANY SHALL RAVE THE RIGHT TO PROVIDE, AT THE EXPENSE OF THE CUSTOMER, THE FACILITIES
NECESSARY TO PRECLUDE SUCH CONDITION OR CONDITIONS.
7,,,,r,AL NOTES,
16. THESE COSTS ARE CONTINGENT UPON CUSTOMER INSTALLING CONDUIT UNDER PAVED AREAS AS INDICATED Off SKETCH.
17. THIS COST ESTIMATE IS FOR RELOCATION OF COMMONWEALTH EDISON FACILITIES ONLY. CUSTOMER IS TO CONTACT ALL
OTHER PARTIES INVOLVED (1.e.• ITT AND CATV) FOR THEIR CHARGES.
p(18. THIS PLAN AND/OR CHARGES ARE CONTINGENT UPON COMMONWEALTH EDISON OBTAINING ALL NECESSARY PERMITS AND/OR
EASEMENTS. ANY ADDITIONAL COST TO OBTAIN THE PERMITS AND/OR EASEMENTS WILL BE BORNE BY THE CUSTOMER AS
INCREASED OPTIONAL FACILITY CHARGES BEFORE ANY WORK WILL BEGIN.
19. REPAIRING OF EASEMENT STRIP/CABLE ROUTE (INCLUDING PAVED AND LANDSCAPED AREAS) TO RR RIISPONSIRILITY OF
CUSTOMER WHENEVER C.I.CO. HAS TO PERFORM MAINTENANCE OM C.E.CO. FACILITIES.
C E,CO. TO1 (AS MARKED)
1. INSTALL, OWN, AND MAINTAIN TRANSFORMERS.
)Kfls 2. INSTALL, OWN, AND MAINTAIN PRIMARY WIRE OR CABLE.
. . 3. TRENCH AND BACRPILL. PRIMARY X SECONDARY
❑ 4. INSTALL, OWN, AND MAINTAIN SET(S) OF /C SECONDARY SERVICE WIRE OR CABLE.
i
❑ 5. C.E.CO. TO FEED SECONDARY SERVICE CABLE INTO BUILDING, CUSTOMER TO PULL.
6. FURNISH LUGS AND CONNECT SECONDARY.AT TRANSFORMER.
7. INSTALL, OWN, AND MAINTAIN TRANSFORMER FOUNDATION.
8. INSPECT AND APPROVED TRANSFORMER FOUNDATION. (E.S.S.)
'''`❑�9. INSPECT, APPROVE, OWN, AND MAINTAIN TRANSFORMER FOUNDATION. (COMMUNITY JANE)
•
• - .
.... .
if .- .• .. ,
' .
II. .
- .
A' •1
\,
--.: -7-/-/-••.:--t : I t:/:' L.=-----.0a-7-,-,.,
(-
' I
.'''t-i • --1 .,
\\(7'..- \
\, '., , ■1"<"'-.."' ....!P• ,,,--2. -4: ' - - - - ---- ---•- - -. .• ,-.-..
\ \ .,..`.,:-<,• V
---- ,
,
.
L..ori I,....: --`.--'
\ .
4. _.__
ill:- , :,-i'
_4.------r--1, . .,
•
' \,,s\ \\-•,...t. ,., 4"-,---
\ \ \
\\• - -'‘ \
\ • I ,-,:)' 't
, .
.... , ______ _____ i,-,•;
\ .\ . ! .1., , '''' • •----" -
C,•••,..: .t-N : \. . .C.
. .. ,-i,-. \ • ,
s, • I .:5. -4.
, 1 //• .. , \k. .. _,.',._ _____.
,- •‘ .
., .- •"-... .'.31., K
• \ r ..- •-•.- 1 [z ‘
\ .
, ..., ,. ... 43-•
,,....- ..... ,, ,
\ , ,.., ,....... %. .
,... .
.. ,. i
,.
.„ ,..._._.,„. ..
.. ..,,,, ........ .., . ....:. . 1._.--L2 i,. "
\\ ')
\
\ '\ . .
\ '.■ , ._ .
. .
-",) ..... ;' _ - -) 2.'.,---",'- 2-q .-- ,,,'-Z. -- , r /..::.
. _.,
, . .
, •
4J7:-.c5 - .. .:-----?..- ;..-/. ,,='•,•.',:..; /•;..'f•-•,•.... .,-..:,' _.,• •/-, ;:)..,; L._ ,-:•...:,..-",,:,.-
\ r z /.;v . ,-_,/_,•,\,-,._ ,--;--',,;,, _2, ,--, ..",•: ---.,: /-7;:.-i„,.4j
-- \
---;,.---...\•\
• .
. —V. r '-.,' 7.-:. ' •::1:-. 7-51; :::.(...-:•-c....L.. .:----':-..-1•,•T•'-' /
• \ 7 ,
,.„
. ,
' - -J C..,1)1-;.1 i 7-..5 r, -' ",.';'..";'44'._'7/7._-,4..',‘);E.,?.= 4 r,r
,r\-\ \
Z\ , \ -
Iv(' ,, ,,, .
4. , ,
,
. ..... .
......:.-_,- L.•!'., ' • ;,::l-.'.-.•.:'-'..,
/ 1 \C'' ) ' ,
\ k,., ' ,•( , r.
‘. .• : ,•'' -.2 2 • , • ;i "•- i,..: •--•I _, 7..::',,..,L--.7-
\ \ . ,
\
-.. , •. .
, . ' . \..
,.
<'.`'' '. 3)
,.. .
'..,, • \ '\ .
\ ...-
--- --'----
-.. .y.,-..
\ '' . • - --..,
\ \
\..i'• ".) -• -- •• . \
.. _,... ,.. .-:I 1:.-' -...'.-'=,•'•,-/•-•-.. 1 I
• \ N.-.-------—------------- ,,\ '
'-•••", 1'/...;/'--..L;k1 ,..-x..', 7,-:,•,_!•L_/:2_.. ,,,, _ -7.-.„-c ,....
r-4.',.,,',.'‘ --- -,, -- -rj:.ii.._ ,;; ,
,
4). • ,.....7...:, r--..,0 411, ' ..:.--,*I -7,--,:t. -,----4,:',..---- • —----7
.
' 12 91- .'/.1.6'/4...c" 1
/ 1 , 15..-41.")..i ..i_ ',C.:7 T... ■,..7,-, ;
•-7..•K.,. 7...4
.
. ■■ .
\..
, ':- • ■,,.• i t-1/4-/ •_,,-,V
1
.
1 _ — . .-.
1
CD' CLARK DIETZ, INC.
Request for 1817 S. Neil , Suite 100
Authorization P.O. Box 676
Of Changes • Champaign, IL 61820
217/373-8900
TO Mr. Dennis King • PROJECT Slade Avenue Facility
Water Operations Engineer DATE August 22, 1991 JOB NO E04020
City of Elgin CITY Elgin COUNTY Kane
150 Dexter Court STATE Illino is
Elgin, Illinois 60120-5555 CONTRACTOR •
CHANGE ORDER NO. 8
GENTLEMEN: SHEET NO. 1 OF 29
The following change(s) from the plans in the construction .
of the above designated project is recommended.
ITEMS) ADDITIONS DEDUCTIONS
See attached documents
Change Proposal #10 $16,077.00
Change Proposal #27 $ 7 ,161.92
Change Proposal #29 51,594.58
Total $58,756.50 $16,077.00
•
The Contract Price for this Change Order will be -
( increased) 046X4X14424 by the Amount of this Order: $ 42 ,679.50
• Amount of Previous Orders: $ 84,857.92
The work covered by this order Original Contract Amount: $3,694,400.00
shall be performed under the Original Contract Amount and Orders: $3,821 ,937.40
same terms and conditions as
that included in the original
Contract.
•
The Contract Time will be (t 000(0m0) (400wl0 (Unchanged) by 0 calendar.
days (this C.O. ) .•
The date for completion of all work under the contract will be August 11 , 1992
The date for substantial completion of work under the contract will be December 12, 1991 .
Ap r v 1 Rec m nde�d� Approv d
•
Resident Project Repr sentative er's Re entative
Approval Recommended: Accepted .y:
( Contr.ctor
Clark, Dietz, Inc.
•
•
WIL-FREDS
P.O.BOX 4050 • NAPERVtLLE,IL 60567 • (708)897-4000
August 15, 1991
Clark Dietz Inc.
1817 S. Neil
Suite 100
Champaign, IL 61820
Attn: Marty Vogel
Re: Slade Avenue Facilities - Elgin
WFS Change Proposal #10
Dear Marty:
Enclosed is the revised proposal breakdown for changing the 5" rigid conduit
from 5' outside the building to the Commonwealth Edison transformers to 5" PVC
schedule 40 conduit. This proposed credit is:
Althoff Electrical Credit ($16,077.00)
Please note that this proposal supercedes the one submitted on March 20, 1991
and reflects the total lineal footage.
I trust this is now acceptable and await issuance of a change order.
Yours very truly,
WIL-FREDS CONSTRUCTION, INC.
/id H.W. Kleywec
Project Manager
cc: WFS CP #10 File
HWK:dl
Enclosure
mar8.15
274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
ADDITIONAL WORK AUTHORIZATION
ALTHOFF INDUSTRIES
8001 S. Route 31
CRYSTAL LAKE, IL 60014-9099
Phone 815 455-7000
NAME RS Wil-Freds, Inc. (ATTN.: Butch Kle AT y
l 22, 1991
ywig) PHONE(708) 897-4000 O `Ju
STREET JOB NAM J NU
274 E. Indian Trail S ade Avenue Facility N 27ZZ4
CITY STATE STREET
Aurora Illinois 60505 0 Slade Avenue
EXISTING CONTRACT NO. GATE OF EXISTING CONTRACT CITY STATE
Elgin Illinois
You are hereby authorized to perform the following specifically described additional work:
REVISED:
Change 5" rigid galvanized conduit to 5" PVC schedule 40 conduit from a point
5 feet outside the new building to a point at stub-up at Commonwealth Edison's
transformer. (Run length approximately 140 feet) . Concrete encased, twelve (12)
conduits.
LABOR: 184 hours @ $38.50/hr. = ($ 7,084.00)
MATERIALS: = ( 8,993.00)
TOTAL CREDIT = ($16,077.00)
NOTE: This supercedes our proposal of March 12, 1991.
CREDIT:
1680' - 5" RGS Conduit $9.07 $15,237.60 .21 352.80
ADD:
1680' - 5" PVC Conduit $3.36 $ 5,644.80 .10 168.00
CREDIT: ($ 9,592.80) (184.00)
ADD FREIGHT & RESTOCK: 600.00
CREDIT: ($ 8,992.80)
ADDITIONAL CHARGE FOR ABOVE WORK IS: $• (16,077.00)
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE/
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
� ,�__ �/ July 22, 91
Authorized Signature Zu � aranACTOR SIGNS HERE) Date 19
THIS IS CHANGE ORDEI Project Manager
NOTE:ThIs R•YI$Ion becomes part of,and In conformance with,the•zI,ttng contract. //
Tfiar WIL-FREDS
P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897-4000
C//4/
Li '� p r+ c-e a.rn c u r1
March 20, 1991 /� f I
75
MAR 2 21991 ck-(4/^evt. nv
Clark Dietz Inc.
et-tY10 AT-% J CA-el +
' `
1817 S. Neil `
Suite 100 " ' n� ( �oC�� d
Champaign, IL 61820 w►'V - .- cG me
J'
Attn: Marty Vogel I 5 ' '' t r nia.
Re: Slade Avenue Facilities - Elgin
WFS Change Proposal #10
Dear Marty:
Per my letter dated March 12, 1991 Item #7 the following credit is offered to
change the 5" ridge conduit from 5' outside the building to the Commonwealth
Edison transformers to 5" PVC schedule 40 conduit.
Electrical (Althoff - see attached) Credit $ (11,338.00)
If you accept this proposal, please issue a signed change order.
Yours truly,
L-FREDS CONSTR CTION, INC.
W I OF, /Or
Jim .aenel
Project Manager
JJ:cr
Enclosure
cc: WFS CP #10 file w/attachment
cp10
274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
ADDITIONAL WORK AUTHORIZATION
'ALTHOFF INDUSTRIES
8001 S. Route 31
CRYSTAL LAKE, IL 60014-9099
Phone 81 '45-7000
OWNER'S I PHO DATE
NAME Wil-Freds, Inc. (Attention: Jim Jaenel). (708) 897-4000 //arch 12, 1991
STREET JOB NAME JOB NUMBER
P.O. Box 4050 Slade Avenue Facility EM 2724
CITY STATE STREET
Naperville Illinois 60567 0 Slade Avenue
EXISTING CONTRACT NO. I DATE OF EXISTING CONTRACT CITY STATE
__-_._._. _ - ... _-_ ____ _ ..._._ - -s-a iii Nis __-_— .
You are hereby authorized to perform the following specifically described additional work:
Change 5" rigid galvanized conduit to 5" PVC schedule 40 conduit from a point
5 feet outside the new building to a point at stub-up at Commonwealth Edison's
transformer. (Run length approximately 100 feet) . Concrete encased
LABOR: 132 hours @ $38.50/hr. = ($ 5,086.00)
MATERIALS: = ( 6,252.00)
TOTAL CREDIT = ($11,338.00)
WIL-FREDs
rn) MAR 18 1991 '1
rl c I� , , t J i�7 !
ADDITIONAL CHARGE FOR ABOVE WORK IS: $. (11,338.00)
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature
014:KtaflaE--RE) M`ateh 12
THIS IS CHANGEBb Fir Manager
NOTE:This Revision becomes part ol,end In conformance wIth,the'misting cnntr.ct. //
EST MR,WKI PREPARED 29-Mar-91 PAGE 1
CLARK DIET$, INC. LABOR RATE: $20.00 ESTIMATOR: 3WB
CONSTRUCTION COST ESTIMATE PROFIT: 15% CHECKED BY: JWW
CD14: EO4O2O OVERHEAD: 387 COST GROUP: ELECTRICAL
JOB NAME: Slade Ave Service Change GENERAL COND: O% DESIGN BASIS: CONSTRUCT
ITEM HRS/ TOTAL TOTAL MATERIAL TOTAL TOTAL W/
DESCRIPTION: DUAN. UNIT UNIT HRS LABOR COST COST/UNIT MAT. COST OVERHEAD OVERHEAD
5" STEEL CONDUIT - PVC 1200 LF 0 0,0 $0.00 $18.45 $22,140.00 $0.O0 $22,140.00
SUBTOTALS 0 $0 $22,140 $0 $22,140
GENERAL CONDITIONS $0
PROFIT
43,321
TOTAL BASE BID $25,461
fffffff fff fffffffffffff ffffffffffffffffffffffffffffffffffffffff ffffffffffffffff fffffffffffffffffffffffffffffff
NOTE: ACCORDING TO THE 1991 MEANS ELECTRICAL COST DATA, THERE IS NO DIFFERENCE IN LABOR BETWEEN 5" RIGID STEEL
AND SCHEDULE 40 PVC CONDUIT. THE CHANGE ORDER PROPOSED BY ALTHOFF IS ONLY 1/2 OF THE ACTUAL
MATERIAL COST DIFFERENCE.
THERE ARE 12 CONDUITS BETWEEN THE BUILDING AND THE TRANSFORMERS. 12 x 100 = 1200'
PERHAPS THIS CHANGE ORDER WAS FOR ONLY ONE OF THE SERVICES, THE TOTAL COST WOULD BE CLOSE IF MULTIPLIED BY 2.
fffffffffffffffffffffff ffffffffffffffff*fffff fff fff ffffffffffffffffffff fffff fff fffffffffffffffffffffffffffffff
EST MH.WK1 PREPARED 14-May-?I PAGE 1
CLARK DIED. INC. LABOR RATE: $20.00 ESTIMATOR: JWB
CONSTRUCTION COST ESTIMATE PROFIT: 15% CHECKED BY: JWW
CDR: E0400 OVERHEAD: 38% COST GROUP: ELECTRICAL
JOB NAME: Slade Ave Service Change GENERAL CDNDI V% DESIGN BASIS: CONSTRUCT
ITEM HRS/ TOTAL TOTAL MATERIAL TOTAL TOTAL W/
DESCRIPTION: QUAN. UNIT UNIT HRS LABOR COST COST/UNIT MAT. COST OVERHEAD OVERHEAD
DIFFERENCE BETWEEN
5" STEEL CONDUIT - PVC 1200 LE 0 0.0 $0.00 $11.08 $13.296.00 $0.00 $13,296.00
SUBTOTALS 0 $V $13`296 $0 $13,I96
GENERAL CONDITIONS $0
PROFIT N.994
TOTAL BASE BID $15,290
ee***e****e*am*a*o*»**eemm*ae**e*o*a***e*e*aea***aeaaa*oeM*e*e*o*s**»e*o*o*o*o*o*****o
NOTE: THIS ESTIMATE WAS PREPARED USING PRICES QUOTED FROM CRESCENT ELECTRIC, CHAMPAIGN, IL.
ae»***ea»e**eee**ee*e*********e**o*s*************ea*ae**e******a***o*o*ee*»M»*e**eo***o*e*a
05/14/91 13:47 8 815 455 9375 ALTHOFF IND 01
;
!
. . .
. ,
. .,) .
-,.
. ..!:11 ..
.4 4;...-- AL , HOFF INDUSTRIES INC,
A
r..,,T...,..- .• A:4„'.,.1.1v.,:ki reet_• 2.121t),,:r.„..4leynnmartarittrtesT,MIneorm,5e.irtmtivsierm.,VreMir."Xlmri5421=7erter.trttoltar- !!,‘
"ri. •,,A A merhanicauElectrical contractor Li Hindi Enginuers
FAXTRANIWITAL *epos /
. i
Ix inItkly -11066)._ For)6 Weilig&
,
May :i, 1991 032 lize 4gT7'., _. a!, IMO hilyno.
Ds 1110100 ONO MAW
:00,07-373-2,123 Fer i WM 4564375
Mr. jim Usepel .........».....
Wil-Frodr:, inc. .
2.0. Box 40S0
Napavillu, Illinois 60567-4050
RN: SLAM VENUE FACILITY - EM 2724
IA .
ULGIN, IT,LINOIS
5" R1 id Conduit to b" PVC Conduit
Buildilg Feeders Credit Proposal Submitted 2-21 •91 •
Dom: jim: .
We have boo.) told that our or•odit dollar amount does not agree with
Clark Dietz's t:ny:Inuer's evaluation. Our back-up iA ae follows:
Material Unit Ext. Labor Unit Ext. :
CREDIT
1200' - 5" 1GS Conduit 9.07 10,864.00 .21 252.00
ADD
1200' - 5" I VC 3.36 4,032.00 .10 120.00
CREDIT 6,852.00 132.00
Restocking Charge ADD 600:00
material CREDIT 6,252..66
LABOR: 132 Ix's. @ $38.53/hr. CREDIT 5,086.00
TOTAL CREDIT 11,338.00
Tho above it aro the same as our first credit proposal which was
approved by Change Order Ill. If you should have any questions, please
contact me. •
Sincerely, .
ALTHOFF IND STRIES, INC.
Bud Weaver
•
Project ) anger •
BW/jh •
•
8001 SOU H ROUTE 31 • CRYSTAL LAKE, ILLINOIS 60014-9099 • 615-455-7000
_1NIL7 ERED S
P.O.BOX 4050 • NAP r�J04LE`;_IL`8056 ; 7Q1 9 44QpI
August 15, 1991 ; '�'
AUG 1 61991
Clark Dietz Inc.
1817 S. Neil, Suite 100 I Champaign, IL 61820
1
Attn: Marty Vogel
Re: Slade Avenue Facilities - Elgin
Wil-Freds Change Proposal #27
Dear Marty:
Based on the outcome of a meeting with representatives of the City of Elgin,
Clark Dietz, Althoff Industries, Comm Ed and Wil-Freds, we offer the following
proposal:
All labor, material, equipment and supervision to supply and install
two - 4" PVC conduits required by Comm Ed for customer installation. This
extra is because no information existed on drawings as to where power was
coming to the sight.
For the sum of $7,161.17, this includes the following itemized breakdown:
Althoff Industries (see attached) $6,191.97
WFS management fee 10% 619.20
Subtotal $6,811.17
Work done by WFS forces
Setup/takedown barricades 225.00
Supervision 80.00
WFS Subtotal 305.00
WFS P & OH 15% 45.75
$350.75
If this is acceptable, we need a change order issued as soon as possible so as
to not delay getting permanent power. Your prompt action regarding this matter
is appreciated.
Yours very truly,
WIL-FREDS CONSTRUCTION, INC.
/64ILK
H.W. Kleyweg
Project Manager
HWK:dl
cc: Dennis King
WFS CP #27 File
ave8.15 274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
• ADDITIONAL WORK AUTHORIZATION
ALTHOFF INDUSTRIES
8001 S. Route 31
CRYSTAL LAKE, IL 60014-9099
Phone 815 455-7000
NAME Wil-Freds, Inc. (ATTN. : Butch Kle i my 22, 1991
� g} PHONE(708) 897-4000 oATE
STREET JOB NAME �1 JOB NUMBER
274 E. Indian Trail Slade Avenue Facility EM 2724
CITY STATE STREET
Aurora Illinois 60505 0 Slade Avenue
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY ` STATE
Elgin , Illinois
You are hereby authorized to perform the following specifically described additional work:
Commonwealth Edison - Primary Conduits:
LABOR: 64.59 hours @ $39.80/hr. = $ 2,570.69
MATERIALS: = 1,944.06
4,514.75
.15 = 677.22
_
ADD = $ 5,191.97
ADDITIONAL CHARGE FOR ABOVE WORK IS: $. 5,191.97
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at above stated price.
Authorized Signature 4t Date y 22, 19 91
(CONTRACTOR SIGNS HERE)
THIS IS CHANGE bPt Manager
\\ NOTE: ,r+n Revision becomes pan of.and In conformance with,the'Rioting cnntrrrcl. 7
TELEPHONE 312/695-6500
. in
i� k(; % CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555
7,40 LETTER OF TRANSMITTAL
Project: . 1c, ,a<_ 4 /--G. (- , (c 4 , Date: //C�/1)/
Tot s 1
I jAttn: /ITr (s-4 0)t- / A1G 1 91991
Submittal No. : Transmittal No. :
Specification Section:
_ Item Qty. Date Description
Purpose: O Approved )or your Info .
D Approved as Noted D Not Approved
D Additional Info. Required D Revise and Resubmit
Remarks: AS /eU--- r'(i';:-- ri)it Ve( -SC-4 `AC) ,i
1.
Signed: ' . a Copies:
•••. iZ �e� �.
'
•F T .. ' :•' ca l • 7
•
C r/', ,4 7/,) -^�� 1/1. -",1".:'=7.71/.:".-4/;!''''-7-,...' C . \ lf.Q4• n. h‘ " 17\ 7*.. Jr! 171j J V C! // �` � /�l, ) / Q RI
-^ n 4%,t/f... ,‘ / A
(7, .4......._-
\ _ :f!:f!,%>,1 X7
! b _ h" %-Iff�.-!=7 7:l� r/l^3c- cJ'., l ' ",;�-t/(_ -":. it J1 (i.7 \ \ _
'�/'h/h't/A' .i f
•I . \ f�x:'L' \, y.Lj\ 2�L'/I'" 1'-r .\ /
�'r /l.'-e;,. 46 zr ,
1 ' ,-L S r.'.ui�l,_�;ri1 '_f;.',`, V c. /.' y- \ �.Y `1I r:-j -4c^/ `- � ' i _ '
.... ./././> •
s .
Cc ,;,
j
J 7`7 .i ?'.2:{,'.•A ../ n' _ :(.7•1!4 -,7.
1/r...--1,-./') - '�\ - \ \ . • -. •• ♦
_✓:^, -• '-`.7, 77, , /,-2 _ . ,•: ',c lr 1 r''' .3 (, \ yr•
♦ • \ \ \
• ( 1 //
.'_id . •, ^`
. /•'♦+�
\ /� \
\ /--- \/
\ / ." An,/ \ \
\ `'..\_
— )\ .',. �'�
V ...7,
/
• \ 7,� V X\ r` •
. \
i.
1 \ \ � - •
• 2a-
\ :.J 7:.N.._: 1
\ \ )
I 2 /:1/4/ /`--..,\
...• \7' \
r
/ f ..\.1 •.„.
• \\ ! •
�
. V \\ ,,
\ ' l '' -�`-----"— \
// \ .....74..,
j q4 f
`- / r53_:.x,.A 3\s.
■
,T -- .1 r>
. '5. 4'x.:.1;..2 G'1 ', )5.•`-5 1" s•
, . 7v
. r;..i l<v) yY0�Z)iV `\ % r
,,
. •
\� f
f
_ .
/ ...,
. Z
• . . I
;1<;11 I
1 .f- '...•
1 .1/ ..--,..•, 4,
-
....-, ,.. . 4,,•,, ,,_
, L, • ..._.
cY,.■
-.57.-..----•• l,! ..,...
... . ''...
t- . . i ,,.r:',--nc. •-7
_•
— if-- .1--- .,c....- •••
. ..-
■.? 1 - _...,, sl
s VV.
--4/•-•
. ,
. ,
,. .
•
---4.,c. 3.: ' •
„, ....... s. 1 `.•
. , .
,vi.--...i.,..:..,■,.--(..-!..-•— '..7i:-
si.' .•(--------.} I.1 i I it/ , ..
. --., .;.t:'i Vol
l.,_,..........-- •
,.el
. __ _ ____
...- ..1 ■ ”f.,'-i r? 7 ...,.....
i c. A
..-'1 /ti—i-24 ci • —
" 1 --- ---C.- - t.:4'■'::
r,a j../...t.o. 7 ---4,0 14 c:-7-,--f,,-;:-..ii-iLi_ . r• \
Q v ---epti,.1:"!f5;t-,••:11.t c,- r
.. s,
,
\
N ,„, c-- :l.:.'''''' ... _I.:'".-,.. V. (•4 rri \
,_ r .'"-1 ' .
f
1 /—
,„•::1- .:..e... C7 f•r,:21 f.,,;,,,, :"..) ,,'!V : l....)
- __
I
7
. s
• 1
I
•
, I
.---
S.
__,....1....).J `. `
•
\1/4....-"7"7 \. ' .
•
•
•
•
' ''. \,,,' .1' ..., \ - \
•
d-
/ \ 7•
•
7 1� ... 1i \\ i4
•
I )
•- . ,` \\•
••
•
•
•
nuU is y1 flUfl 1j; ly LLUIN WHIM llL,Y1, FAX NU 17089315152 P, 02
El I TELEPHONE 708/695-6500
nFAX 708/695-9036
((c.") CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555
Hten
August 19, 1991
Hr. Charles E. Park, P.E.
Clark Dietz, Inc.
P.O. Box 676
Champaign, II. 61824-0676
Dear Charlie:
*21
RE: SLADE AVENUE FACILITY, CHANGE PROPOSAL NI
Referencing your letter of August 13, 1991, the City elects to accept
the contractor's proposal. Please see that this decision is transmitted
to the contractor with the utmost expediency. Should you have any
questions, feel free to call,
Sincerely,
Dennis H. King
Water Operations Engineer
DMKtjk 34000819.291
cc; John W. Blaokmore
Martin R. Vogel
WIL-FREDS
P.O.BOX 405 • if,�L 6066T-t4708)87-4000
r i
August 15, 1991 !
AUG 1 61991
�u+
Clark Dietz Inc.
1817 S. Neil
Suite 100
Champaign, IL 61820
Attn: Marty Vogel
Re: Slade Avenue Facilities - Elgin
Change Proposal #29
Dear Marty:
We offer the following proposal for extra electrical cost per revised Drawings
E7, E13, E14, and El8 dated Revision 1 5/91:
All labor, material, equipment and supervision per Althoff Industries
attached estimate for the sum of: $51,594.58 per the following breakdown:
Althoff Industries (See Attached) $46,904.16
WFS Management Fee 10% 4,690.42'
Total $51,594.58
This proposal is for equipment and installation costs only as outlined and does
not include any additional costs for this delay. Upon approval of this
proposal, we will be able to determine the time extension required and
associated costs.
Due to a 16-20 week delivery time, we need to get a change order issued ASAP.
Please note that this proposal supercedes Wil-Freds Change Proposal #23. We
trust this new proposal meets with your approval and that we can move forward.
Yours very truly,
WIL-FREDS CONSTRUCTION INC.
/al
H.W. Kleywegl
Project Manager
cc: Dennis King
WFS CP #29 File
Enclosure
HWK:dl
inc8.15
274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
moolommumertummmw
um-
ALTHOFF INDUSTRIES INC.
MIMMINIMO
Mechanical/Electrical Contractors and Engineers
�< i �
67/,\ 'l
July 31, 1991 - -='
Mr. Butch Kle e ,-'N ) "1 \
� .
Wil-Freds, Inc.
274 E. Indian Trail
Aurora, Illinois 60505
RE: SLADE AVENUE FACILITY
EH 2724
Dear Butch:
Enclosed is revised pricing for General Electric's portion and cable
limiters selected by the engineer. This submittal supercedes our
proposals dated July 16, 1991 and July 22, 1991.
General Electric's engineering, credits and distribtor mark-up costs
are included. There are not any Westinghouse IQ Data Plus Meters
included in this proposal; prepared spaces to accept the meters are
provided.
If you have any questions, please contact me.
Sincerely,
ALTHOFF INDUSTRIES, INC.
MLA ��
Bud Weaver
Project Manager
BW/jh
Enclosure
•
8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000
•
� r
• ALTHOFF INDUSTRIES INC.
siumm
Mechanical/Electrical Contractors and Engineers
SLADE AVENUE FACILITY - JOB #EH 2724
Back-up for Additional Work Authorization dated July 31, 1991
ITEM #1 - ADD: 5KV LINE-UP OUTDOOR
1 - Provision for IQ Data Plus
(Includes CT's, engineering, and
drilled space $ 1,295.46 $ 1,295.46
1 - 10KVA Control Transformer 5,543.20 5,543.20
2 - Cubicles 2,346.80 2,346.80
LOT - Mechanical Door Interlock Included Included
LOT - External Operating Handles/Padlockable Included Included
MATERIALS: $ 9,185.46
+15%: 1,377.82
ADD: $10,563.28
ITEM #2 - ADD: 480V INDOOR SWITCHBOARD
1 - Provisions for IQ Data Plus
(Includes CT's, engineering, and
drilled space) $ 1,295.46 $ 1,295.46
1 - Main Breaker Shunt Trip 572.00 572.00
LOT - Copper Bussing Included Included
1 - ULSE Label Included Included
MATERIALS: $ 1,867.46
+15%: 280.12
ADD: $ 2,147.58
ITEM #3 - ADD: 480V INDOOR MCC
3 - Provisions for IQ Data Plus
(Includes CT's, engineering, and
drilled space) $ 1,295.46 $ 3,886.38
LOT - MCP Circuit Protectors Included Included
LOT - Nema 1 Gasketing Included Included
MATERIALS: $ 3,886.38
+15%: 582.96
ADD: $ 4,469.34
ITEM #4 - ADD: DEEP WELL TRANSFORMERS #1-#6
LOT - Mechanical Interlocks Included
LOT - 4-Position Switch Included
LOT - Lightning Areesters Included
LOT - Tap Position Indicators Included
NO CHANGE
8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000
.i� �J
SLADE AVENUE FACILITY - JOB #EM 2724
Back-up for Additional Work Authorization dated July 31, 1991
PAGE 2
ITEM #5 - ADD: DEEP WELL CONTROLLERS #1-#5
5 - Provisions for IQ Data Plus
(Includes CT's, engineering, and
drilled space) $ 1,295.46 $ 6,477.30
5 - MCC WP Enclosure 1,125.00 5,625.00
5 - MCP Circuit Protectors Included Included
MATERIALS: $12,102.30
+15%: 1,815.35
ADD: $13,917.65
ITEM #6 - ADD: DEEP WELL CONTROLLER #6
1 - Provisions for IQ Data Plus
(Includes CT's, engineering, and
drilled space) $ 1,295.46 $ 1,295.46
1 - MCC WP Enclosure 1,125.00 1,125.00
MATERIALS: $ 2,420.46
+15%: 363.07
ADD: $ 2,783.53
ITEM #7 - ADD: MATERIALS LABOR
60 - 750 MCM Cable Limiters $ 149.50 $8,970.00 .72 43.20
LABOR: 43.20 hours @ $39.80/hr. = $ 1,719.36
MATERIALS: = 8,970.00
$ 10,689.36
+15%: = 1,603.40
ADD: = $ 12,292.76
ITEM #8 - ADD: MATERIALS LABOR
1 - Service Pump Local Control $ 230.00 $ 230.00 6.00 6.00
90'- 1 1/4" EMT .62 55.80 .095 8.55
3 - 1 1/4" EMT 90 Elbows 4.04 12.12 .297 .89
2 - 1 1/4" EMT Conn. D.C. S.S. 1.31 2.62 .136 .27
15 - 1 1/4" EMT Coup. D.C. S.S. 1.44 21.60 ---- ----
9 - 1 1/4" EMT Supports .44 3.96 .059 .53
3330'- #12 THHN Wire .08 264.00 .008 26.40
30 - #12 Terminations .17 5.10 .19 5.70
$ 595.20 48.34
Adr
SLADE AVENUE FACILITY - JOB #EM 2724
Back-up for Additional Work Authorization dated July 31, 1991
PAGE 3
LABOR: 48.34 hours @ $39.80/hr. = $ 1,923.93
MATERIALS: = 595.20
$ 2,519.13
+15%: = 377.87
ADD: _ $ 2,897.00
Change 4/0 bare ground wire to 4/0 insulated (Drawing #E-18 revised)
NO CHANGE
ITEM #1 - CREDIT:
2 - 2000A 480V Fused Outdoor Switch (Fuses included)
MATERIALS LABOR
$3,475.00 $6,950.00 50.00 100.00
LABOR: 100 hours @ $38.50/hr. = $ 3,850.00
MATERIALS: = 6,950.00
($10,800.00)
ITEM #2 - CREDIT: MATERIALS LABOR
2810' - #4/0 Shielded 5KV Cable $ 3.131 $8,798.11 .29 81.49
9 - #4/0 Terminations 61.00 549.00 1.08 9.72
$9,347.11 91.21
LABOR: 91.21 hours @ $38.50/hr. _ $ 3,511.59
MATERIALS: = 9,347.11
CREDIT: =($12,858.70)
ADDITIONAL WORK AUTHORIZATION
ALTHOFF INDUSTRIES
8001 S. Route 31
CRYSTAL LAKE, IL 60014-9099
Phone 815 455-7000
OWNER'S PHONE DATE
NAME Wil-Freds, Inc. (ATTN. : Butch Kleyweg, (708) 897-4000 July 31, 1991
STREET JOB NAME JOB NUMBER
274 E. Indian Trail Slade Avenue Facility EM 2724
CITY STATE STREET
Aurora Illinois 60505 0 Slade Avenue
EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE
F.1 gi n Illinois
You are hereby authorized to perform the following specifically described additional work:
REVISED
New pricing for G.E. Distribution Equipment and Drawings #E7, E13, E14 and
E18.
SUMMARY:
Item #1, Add $ 10,563.28
Item #2, Add 2,147.58
Item #3, Add 4,469.34
Item #4, No Change
Item #5, Add 13,917.65
Item #6, Add 2,783.53
Item #7, Add 12,292.76
Item #8, Add 2,897.00
TOTAL ADD: $ 49,071.14
Item #1, Credit ($10,800.00)
Item #2, Credit ( 12,858.70)
TOTAL CREDIT: ( 23,658.70)
GRAND TOTAL ADD: $ 25,412.44
**SEE ATTACHED BACK-UP**
ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 25.412.44
Payment will be made as follows:
Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Date 19 Authorizing Signature
(OWNER SIGNS HERE)
We hereby agree to furnish labor and'materials-complete in accordance with the above specifications,at above stated price.
�l/(/n 7''1 y 31, 91
Authorized Signature �'C6 �i/ ( NTRA 1• StONS HERE) Ui�L6 19
THIS IS CHANGE bdlItTERPOt t Manager
NOTE: This Revision becomes part of,rind In conformance with.the existing cnntrsct.
,ALTNOFF INDUSTRIES lr 4-44A- _I _ ___ WRIT
KALE_
E31IMALI NO.
QUANTITY TAKEOFF ►Y _nub D I
DATI ft - i5-9 I -
• D..,r MATERIAL PRICED BY
NAME OF )O. S L.A. II
LABOR PRICED IY .1
ARCNItECT OR ENGINEER SICIENSION MATER IA( OUAN111Y 1�I UNIT
,. -z : 11111111111111111111111111111111111111111111111
-- I
it 12 : 1 . - 1 I II
plIMIlliiiii I I.
i IT L
ill I
L ABog 13.2 HWKS 'a 3°!. /tj„!C 5 13b J I 1 )
un
r.-�II� :
. . . i I er.In viii I .
1 ;= II N!! 1M1111111111111IIll1
IIIIIIIIIIIIBIIIMIIIIIIIIMMIIIIII I1
i II I 11111111111111111111111111
I 1i II
I! I
1
it II
AT-0.1 : Tcurc.ti KLaYt t G ,I i I II
! I II I
y,--,
1 1 I lI I
I I I 1i r
-- _ _� — - — I I I M 111111111
_ _ i I 1I Ill I; 1111■ i i
. _ r
I 1
II i 1 1 I 1
• CD1CLARK DIETZ, INC.
May 2, 1991
Mr. Dennis King
Water Operations Engineer
City of Elgin
150 Dexter court
Elgin, Illinois 60120-5555
Re: Slade Avenue Facility
Change Proposal Requests
Dear Dennis:
Attached please find the following drawings:
E-7 Lower Level Power Plan
E-13 Power One Line Diagram
E-14 Pump Control Diagrams
E-18 Electrical Duct Bank Sections
The "clouded" areas on each drawing represent changes that were
requested by the City of Elgin. These changes include:
a. Addition of a control panel in the pump room for starting and
stopping pumps.
b. Addition of solid state phase reversal , under-voltage and
over-voltage protection at all deep well and service pump motor
controllers.
c. Addition of voltmeters and ammeters at all deep well controllers.
The City's requests were addressed by letter dated 3/25/91 and during
shop drawing review on 3/21/91.
Please review the proposed changes and advise as to whether or not a
change proposal is to be requested from Wil -Freds. If you have any
questions, please call .
Very truly yours,
Martin R. Vogel
Clark Dietz, Inc.
t:0502-pl
Attachments
Clark Dietz, Inc.
1817 S. Neil, Suite 100
P.O. Box 676
Champaign, IL 61824-0676
217/373-8900 ENGINEERS ARCHITECTS
EWmnTELEPHONE 312/695-6500
t� ' CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555
'160**1-r,
'q
LETTER OF TRANSMITTAL
f ' ,
Project: c )kd , A „,_ /cr , I , tt 6 5 Date: _/7A/
To: �,In L k- , <_= +f e .T r i ci, •
Attn: /ti'l( fv l/.:-..c= l
Submittal No. : Transmittal No. :
Specification Section:
Item Qty. Date Description
/ / ?-3 // ii /LiCC l (- c-,,.c.)i .+ate F ICe✓i5�'at) c�� _5 :/A-7/ _So t7
2 / % G
2 1 0Z/i 5,,,--9, e_ l3v/,/ rte-s:c --5 S,2�� , e9
4
Purpose: 0 Approved 0 For your Info .
0 Approved as Noted 0 Not Approved
0 Additional Info . Required 0 Revise and Resubmit
Remarks: ,�•,/F,.,,, 1 - ..s, 17i-A,_/,0 0/
44) l 5 �Z/.iS7/NC° 1-Z -11 /.S Ira � .,a CF /-”
/ c le V/
c -- l b�> c- -1-1-1,-s vi'cic V-
SC:/e S1 ctl-c-• ,,1 l: Tcc-11O 1 0/-.GS L 1-F V(:i-`G !
/ J J
1l 9 //U (/d 0-a a /-)7-),----,-,*-,--i
Signed: , "„ %/l , ,,rul Copies:
! '
----- —
74, t..1715— -1.-I,'2 --.t -?-. --.. 11----TETTZ7 , _
_../y/7 g.7_ ,...4
17 f''11
,---)--,0/2/7 6'V 1/ --0,5-_.4-9i,-. -4 I'D,5 -toy i i
--P , - ,? k.._/-
c'-o---c5c7 /F, /0/-- 1—/
/
_
..,_ 0, - P-11 7 t.7 9 °/
- - 1 '
--7- r c• 'Cl 14 0 Sl3-- 4 2 ill
7(/':---%1 "3 P71700 ___.1 i _.
/
1 1 /
1
111 s .
/ 111
2/ --- •=2/ /‹)7.1)0 / /---7 c7,------7Y1.7. --01?
1 I 1
1.
1'
1 t 1
—7/.7 i 4,-s ,...)14'/ .77 c_i 12 -71/4_4_j., ----1- --
-vr-DA fri.7s, 1 ty y I!!
i____ ! :
/ *q^/ 7/ 0 F/ /--) =D 2
m 1!!
!:!
__. ,--.)o---,.,
ri 75--- / 7 ,/
.,-/-7,
_ .
1(10 112/ , , - 5-;1.:7/t--0-70/ 1../4..7L...1("-Y7 /-0 C,-00SI : •:
1i
/
,-,-,/ - f.:, --7-,...,,c_7(....0, p -!-7 .:...q!,--4,-- ...) 1 I, ,
. .
--,/ ( 4 c 0 1 -) ' - • •
-,-,-/---- , . 7_5- 7 /V - i7-7-7i, g. /--,.2<-?'- LA- -")--' ' • • cy ..._
,., „--„, Q
,, /b, 5 t---).
z_
(I
/ --\-_,..7 I 0! / ,cz„,./ CI f-D C -
• TELEPHONE 708/695-6500
FAX 708/695-9038
t+i ff`I
?,gip-- r CITY OF ELGIN 150 DEXTER COURT ELGIN, ILLINOIS 60120-5555
-"tie /
March 25, 1991
Mr. Martin R. Vogel
Clark Dietz, Inc.
P.O. Box 676
Champaign, IL 61820
Dear Marty:
RE: SLADE AVENUE FACILITIES
The City would like to pursue a change order for the addition of a
control panel in the pump room for starting and stopping the pumps.
These controls would be disabled when the selectors in the electric room
are in the remote position and would respond as the MCC start/stop
buttons do when in the local position. This panel could be located on
the wall adjacent to corridor 005 near the outside corner for proximity
to all pumps.
Please have Wil-Freds proceed with obtaining the necessary information
for this request.
Sincerely,
Dennis M. King
Operations Engineer
DMK:jk 26720325.191 2672/89-2
MARCH 29, 1991
TO: CEP
FROM: JOHN W. (BILL) BLACKMORE
SUBJECT: PROPOSED CHANGE ORDERS
PROJECT: E04020 - ELGIN SLADE AVENUE
1 . Per Dennis King 's comments, the City of Elgin would like to
have solid state phase reversal , under-voltage and over-voltage
protection added to all deep well and service pump motor
controllers. In addition the city wants voltmeters and ammeters
added to all deep well controllers. This work should be combined
with the proposed addition of the auxiliary service pump control
panel in the pump room.
SCOPE OF WORK:
a) Design additional controls, metering and protection.
b) Prepare any additional specifications for the added
work.
c) Create a new drawing for the auxiliary control panel .
d) Revise existing control wiring diagrams.
e) Revise equipment submittals.
EFFORT:
JWW 10 hrs
JWB 40 hrs
AUTOCAD 12 hrs
NOTE: I am holding the GE MCC and 5KV submittals, because this
proposed work will affect them.
2. The Commonwealth Edison Company 's metering department would
like to have the 2000 amp building service transformer secondary
fused switches eliminated , and cable limiters installed in their
place. This is acceptable to us. This will require deductive
change order from the contractor .
NOTE: The deletion of these switches will allow the sub-station
extension pad to be reduced in size.
The General Electric Company and our lead electrical
engineer. Mr. Jack Willis, have reviewed the 5KV power
distribution design. They have decided it would be in the
client 's best interest to delete the 5KV neutral conductor
throughout the distribution system. This will reduce the 5KV
cable quantity by 1/4. This change will require the contractor
to ground the secondary side of the transformer instead of the
primary side. If this change is acceptable to the City of Elgin ,
the contractor will need to prepare a deductive change order.
i
•
111
Agenda Item No. !S;
LOf E(C
9 �
�O�q(LD FE81•
TO: Mayor and Members of the City Council
FROM: City Manager
DATE: September 4, 1991
SUBJECT: SLADE AVENUE FACILITY CHANGE ORDERS
PURPOSE:
This memorandum will provide the Mayor and Council with
information to consider in authorizing change orders to the
existing contract for construction of the new Slade Avenue
facility.
BACKGROUND:
On September 26, 1990, a contract was awarded to Wil-Freds
Construction for construction of a new water facility for the
Slade Avenue site. These improvements are essential in order to
replace this outdated, deteriorated facility and maintain the
well and pumping functions that are a vital part of the City's
water system.
During construction several items were encountered requiring
change due to unidentified piping, design inadequacies, code
requirements, and Commonwealth Edison requirements. The two
change orders, #7 and #8, deal with three items each. The first
item for change order #7 is for the additional work created by
breaking an existing, hidden, unrecorded pipe that filled an
excavation with river water. The second item is for the removal
of existing, hidden piping that was not shown on any records and
which interfered with the building foundation. The third item
is for adding a fire rated ceiling in the lower level of the
building to meet City code requirements.
Oak
Page 2
The first item for change order #8 is a credit for a change from
rigid to PVC conduit. The second item is the addition of
conduit to support the reconfiguration of the incoming power by
Commonwealth Edison Co. The third item is for the modification
of all well and pump controllers to add the solid state
protection usually required for this type of equipment.
FINANCIAL IMPACT:
Quotes have been obtained from Wil-Freds Construction for the
change orders described above.
Change Order #7 - Unrecorded Piping, Ceiling $ 5,868. 10
Change Order #8 - Conduit, Electrical Protection $42,679 .50
TOTAL $48,547 .60
The contract with Wil-Freds for construction of this project,
including $78,990 for change orders 1 through 6, is $3,773, 390.
The Water Department's 1991 mid-year budget estimate contains
$4,099,015 for this project.
RECOMMENDATION:
It is recommended that the City Council approve these change
orders to the original contract with Wil-Freds Construction for
a total of 547 .60 .