Loading...
HomeMy WebLinkAbout91-0626 Martin Associates RESOLUTION ACCEPTING THE PROPOSAL OF MARTIN ASSOCIATES FOR LANDSCAPE ARCHITECTURAL SERVICES BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Martin Associates for landscape architectural services for the Center City Gateway Parks, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: June 26 , 1991 Adopted: June 26 , 1991 Vote: Yeas 5 Nays 0 Recorded: Attest: s/ Dolonna Mecum Dolonna Mecum, City Clerk • �n• 414 Agenda Item No . June 7, 1991 TO: Mayor and Members of the City Council FROM: Larry Rice SUBJECT: Landscape Architectural Services for Center City Gateway Parks PURPOSE To make a recommendation to Council on a landscape architectural firm to complete preliminary and final master plans for two Center City entryway parks. BACKGROUND Request for proposals for landscape architectural services for the Woodruff and Edwards site and the Church's Fried Chicken site were distributed in April, and three firms responded to the request. A staff review committee comprised of representatives of the City Manager' s office, Parks Department, Engineering Division and the Planning Department scrutinized the proposals and conducted an interview with the firm thought to be the most qualified to perform the work as set forth in the RFP. RECOMMENDATION The firm interviewed by the staff committee, Martin Associates of Vernon Hills, was chosen as the recommended firm. A copy of their revised proposal is attached for Council review. Martin Associates will prepare both the preliminary and final plans for Council review and approval for the sum of $4,500.00, with a not to exceed allowance for reproduction of documents of $400 . 00. It should be noted that video imaging of the plans is included in the total quote. 4110 Mayor and Members of the City Council June 7, 1991 Page 2 The committee was impressed with Martin Associates experience in municipal landscape architectural services, most notably in their entryway park treatment performed in Wilmette, Illinois . L; .Rice,c Manager artinAss904e May 23, 1991 Ms. Jennifer Becker. Planner Planning Department City of Elgin 150 Dexter Court Elgin, Illinois 60120 Dear Ms. Becker. Martin Associates is pleased to submit the following information per your request in support of our proposal for the Entryway Parks to the City Center of Elgin. I have included a range of projects illustrating a variety of finished plans and support materials. In addition. we have revised our proposal to reflect the process you have outlined in your May 15 letter, and have attached a more detailed schedule and listing of our project team. We appreciate the opportunity to be considered for these projects, and would offer to personnally present to the review committee, should it be helpful . Please call me if I can be of further assistance. Sincerely, -514 1-. SII r' /ie David K. ScatterdaY, A Landscape Architect Manager of Design Services James Martin Associates,Inc. • 24380 N.Highway 45 • Vernon Hills,Illinois 60061 • 708/634-1660 • FAX:708/634-8298 artinAssociate MI,114",f3 May 23. 1991 Ms. Jennifer Becker Planning Department City of Elgin 150 Dexter Court Elgin, Illinois 60120-5555 RE: Entryway Parks Design Dear Ms. Becker: We are excited about being a finalist in your selection of a consultant for the entryway parks into the City Center! We have revised our scope of services and fee structure to address the items of your May 15. 1991 letter. I have separated out an allowance for reimbursable items, however if you would like to have a single lump sum figure. that is also fine. I am sure we can work out the details in finalizing a contract. I. MASTER PLAN DEVELOPMENT A. Preliminary Program Development We will meet with designated staff at your office or at the sites to identify ideas and concepts regarding park development. At that time we shall work with you to develop the goals and objectives statement for the project, determine the direction for the preliminary concept designs, and schedule project meetings. B. Base Map Preparation. Site Inventory/Verification and Analysis of Existing Conditions. 1. We will prepare a base map of the project area at a scale of 1" = 20' using plans and information provided by the City of Elgin. 2. We will inventory each site to verify existing site conditions. This work will include the following: a. verifying the approximate location of above ground structures, and landscape features. b. identify on the plan any plant materials which should be removed, replaced or transplanted. 3. We will perform a site analysis which will include the following work: James Martin Associates,Inc. • 24380 N.Highway 45 • Vernon Hills,Illinois 60061 • 708/634-1660 • FAX:708/6344298 Ms. Jennifer Becker Page 2 City of Elgin a. verifying site line considerations, screening, setbacks. potential areas for parking or active recreation. b. examine pedestrian access and circulation patterns within the park areas. c. identify existing and potential views within the project area which should be framed or highlighted. d. identify existing views which should be screened or minimized. 4. We will prepare a photographic documentation of the park sites and surrounding conditions for use as reference during the design process. C. Conceptual Design and Budgets 1. Using the knowledge gained from our site inventories and information gathered at the program development meeting, we will prepare two concept plans for each park site which will address both an active development and a passive development concept. Items to be studied at this phase will be: a. alternatives for site use b. location of entryway signage c. screening as appropriate d. creating aesthetic views of the Fox River e. planting design f. review of sitework for low maintenance requirements. 2. Video images will be prepared to illustrate the character of each of the concept designs. Items to be specifically addressed will be: the signage location and lines of sight, screening of the parking lot on parcel 02. and views of the Fox River on parcel #1. 3. We will prepare a preliminary construction budget for each preliminary concept. 4. We will meet with you at your office to review and discuss the preliminary park concepts and budgets. Two copies of the plans and budgets will be provided for your use. 5. We will refine the concept documents using the input from staff. 6. The refined concepts, video images, and budgets will be presented to the City Council . JUN 20 ' 91 7:44 FROM JAMES MARTIN ASSC INC PAGE .002 Mt.. Jennifer Becker Page 4 City of Elgin 4. Delivery, messenger service, and overnight mail. 5. Long distance telephone and telefax. Reimbursable expenses will be summarized and invoiced monthly at cost plus 104. C. Meetings .and Presentations Where additional meetings, presentations of our plans, and/or additional design services are requested, this work will be performed on an hourly basis at the rates listed within this proposal _ O. Additional Nested Services All additional requested services will be performed either under a separate written agreement or based upon our hourly rates listed below. . Hourly Mates: Principal $ 00.00 Senior Landscape Architect. $ 65.00 Landscape Management Consultant $ 50.00 Landscape Architect $ 50.00 • '... ; Draftsperson $ 40.00 AutoCAD Computer Time $ 30.00 Video Imaging Computer Time $ 25.00 Support Staff $ 35.00 E. Ownership of,Docj ants City Ownership of Contract Products. All products produced in response to the contract resulting from this RFP will be the sole property of the City of Elgin. This includes any original reproducible drawings prepared for the project. F. Special Conditions The corner agrees to waive all claims and liability against James Martin Associates, Inc. in the event that the owner executes the work without Martin Associates preparing construction documents and supervising construction. The Owner agrees that James Martin Associates, Inc. will not assume responsibility for interpretation of codes and ordinances by Village staff. Owner agrees to limit liability to revision of plans so that they adhere to interpretation of local code official. ** TOTAL PRGE . 002 ** Ms. Jennifer Becker Page 5 City of Elgin The Owner understands and agrees that on January 1, 1992 and yearly thereafter, the fees for services to be performed shall be escalated by an amount not to exceed 10%. Work will begin upon receipt of approval to proceed or an executed contract. Thank you for the opportunity to submit this proposal . I would be glad to personally introduce our firm, past experience, and our approach to this project to your review team. Please feel free to call me at (708) 634-1660 if I can be of any assistance. Respectfully Submitted, 110-1112 K- 4Iq i 0II David K. Scatterday Landscape Architect, ASL Manager of Design Services Attachment: Project Team Description Project Schedule 22:elginppl2 MartinAssociate PROPOSED PROJECT TEAM FOR THE ENTRYWAY PARKS FOR THE CITY CENTER OF ELGIN Martin Associates, Inc. has assembled a diversified team of qualified professionals to address the needs of this project. Beyond this award winning group of professionals is a strong support team, ready to provide a level of service unmatched in the industry. DAVID K. SCATTERDAY, ASLA, PROJECT MANAGER Mr. Scatterday brings twelve years of practical experience to the team and will serve as project manager for the project. Over the past two years, he has been the project manager for several major projects including: a ten-year master plan development of plant collection gardens at the IIT WEST Campus in Wheaton, IL. ; the design of water features and landscape for the interior atrium of Chicago Embassy Suites Hotel; the development of a master plan and construction documents for the landscape, and waterfalls for a 70 acre seniors living community under construction in Arlington Heights, IL. ; and the ULI national award winning Garibaldi Square project in Chicago. KATHARINE A. STALKER, ASLA, DESIGNER/ASST PROJECT MANAGER Ms. Stalker has an extensive background in the management of diverse landscape architectural and land planning projects. Her years of experience in the design and production of large scale recreational sites include the the development of master plans for the Park City, Utah arboretum and city park system. She will be a key player in both the design and management of project documents. MARGARET LOPEZ, ASLA, DESIGNER Ms. Lopez will bring a strong background in working with municipalities. She is currently responsible for the ongoing projects as part of the Village of Hillside's Comprehensive Master Plan; the development and construction supervision of Kimball Hill Park improvements adjacent to the Salt Creek in Rolling Meadows; and Pioneer Court Plaza adjacent to the Wrigley Building in downtown Chicago. ROBERT G. LILLY, ASLA, DESIGNER/CADD OPERATOR Mr. Lilly will lead the production of documents for the project. His experience in the efficient production of projects is a valuable contribution to the project. ADDITIONAL SUPPORT STAFF: 12 Landscape Architects 5 Horticulturists 5 Administrative Staff James Martin Associates,Inc. • 24380 N.Highway 45 • Vernon Hills,Illinois 60061 • 708/634-1660 • FAX:708/634-8298 PRELIMINARY SCHEDULE: Entryways to City Center May 23, 1991 ITEM MEEKS 1 2 3 4 5 6 7 8 9 11 11 12 13 14 15 16 17 18 19 26 AWARD Of CONTRACT X A. PRELIMINARY PROGRAM DEVELOPMENT N I. SASE NAP/SITE INVENTORY ANO ANALYSIS 1. Site Base Naps N N 2. Site Inventory N 3. Site Analysis N 4. Photo Documentation N C. CONCEPTUAL DESIGN AND BUDGETS 1. Concept Plans N N 2. Video Images N 3. Construction Budgets N 4. Meet with Staff N 5. Refine Plans and Other Documents 6. Present to City Council N D. FINAL MASTER SITE PLAN DEVELOPMENT 1. Prepare Final Plans and Supporting Documents N N 2. Prepare Final Construction Budget N 3. Presentation N N B. Presentations