HomeMy WebLinkAbout91-0522 Clark Dietz Amendment 2 Engineering Services Contract Amendment #2
City of Elgin
Slade Avenue Facilities
The CONTRACT AMENDMENT #2, made as of the a2L day of CnQ. of
1991, by and between the City of Elgin, Illinois (hereinafte.called
the CLIENT) and Clark Dietz, Inc. , Champaign, Illinois (hereinafter
called CDI) .
WITNESSETH, THAT WHEREAS, the CLIENT and CDI have previously entered
into an Engineering Service Agreement dated the 14th day of September,
1989 and Contract Amendment #1 dated the 31st day of October, 1990, for
professional services on the design and construction of the Slade
Avenue Facilities (hereinafter called the PROJECT) for a lump sum of
Three Hundred Fifty-Eight Thousand Seven Hundred Seventy-Seven and
No/100 Dollars ($358,777.00) .
Whereas, the Engineering Services Contract includes Sections covering
Additional Services of CDI and the Client's Responsibilities and
whereas CDI has identified the following additional services and
associated costs:
Additional Project Scope
1. Incorporation of City of Elgin proposed
additions to the electrical system.
This includes addition of solid state
reversal , under-voltage and over-voltage
protection added to all deep well and
service pump motor controllers; adding
voltmeters and ammeters to all deep well
controllers, and addition of auxiliary
service pump control panel in the pump room. $3,000.00
2. Modifications of site layout and valve
vault modifications for Wells 1 through 6. $3,417.00
Total Engineering Cost Increase $6417.00
Therefore, the City of Elgin and Clark Dietz, Inc. mutually agree to
increase the total contract lump sum amount by $6,417.00 to Three
Hundred Sixty-Five Thousand One Hundred Ninety-Four and No/100 Dollars
($365,194.00) .
In witness whereof, the parties hereto have caused this AMENDMENT to be
executed as of the day and year hereinabove set forth.
OWNER ENGINEER
CITY OF ELGI CLARK DIETZ, INC.
By: A- .1_ - By:
Attest:
C_s d J
S:050891S1
RESOLUTION
APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH
CLARK DIETZ, INC. FOR ENGINEERING SERVICES
FOR THE SLADE AVENUE WATER FACILITY
WHEREAS, the City of Elgin has heretofore entered into a
contract with Clark Dietz, Inc. for engineering services for
the Slade Avenue Water Facility; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 2,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 2 , a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: May 22, 1991
Adopted: May 22 , 1991
Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Nancy Roll
Nancy Roll, Deputy Clerk