Loading...
HomeMy WebLinkAbout91-0522 Clark Dietz Amendment 2 Engineering Services Contract Amendment #2 City of Elgin Slade Avenue Facilities The CONTRACT AMENDMENT #2, made as of the a2L day of CnQ. of 1991, by and between the City of Elgin, Illinois (hereinafte.called the CLIENT) and Clark Dietz, Inc. , Champaign, Illinois (hereinafter called CDI) . WITNESSETH, THAT WHEREAS, the CLIENT and CDI have previously entered into an Engineering Service Agreement dated the 14th day of September, 1989 and Contract Amendment #1 dated the 31st day of October, 1990, for professional services on the design and construction of the Slade Avenue Facilities (hereinafter called the PROJECT) for a lump sum of Three Hundred Fifty-Eight Thousand Seven Hundred Seventy-Seven and No/100 Dollars ($358,777.00) . Whereas, the Engineering Services Contract includes Sections covering Additional Services of CDI and the Client's Responsibilities and whereas CDI has identified the following additional services and associated costs: Additional Project Scope 1. Incorporation of City of Elgin proposed additions to the electrical system. This includes addition of solid state reversal , under-voltage and over-voltage protection added to all deep well and service pump motor controllers; adding voltmeters and ammeters to all deep well controllers, and addition of auxiliary service pump control panel in the pump room. $3,000.00 2. Modifications of site layout and valve vault modifications for Wells 1 through 6. $3,417.00 Total Engineering Cost Increase $6417.00 Therefore, the City of Elgin and Clark Dietz, Inc. mutually agree to increase the total contract lump sum amount by $6,417.00 to Three Hundred Sixty-Five Thousand One Hundred Ninety-Four and No/100 Dollars ($365,194.00) . In witness whereof, the parties hereto have caused this AMENDMENT to be executed as of the day and year hereinabove set forth. OWNER ENGINEER CITY OF ELGI CLARK DIETZ, INC. By: A- .1_ - By: Attest: C_s d J S:050891S1 RESOLUTION APPROVING CHANGE ORDER NO. 2 IN THE CONTRACT WITH CLARK DIETZ, INC. FOR ENGINEERING SERVICES FOR THE SLADE AVENUE WATER FACILITY WHEREAS, the City of Elgin has heretofore entered into a contract with Clark Dietz, Inc. for engineering services for the Slade Avenue Water Facility; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 2, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 2 , a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: May 22, 1991 Adopted: May 22 , 1991 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Nancy Roll Nancy Roll, Deputy Clerk