Loading...
HomeMy WebLinkAbout91-0315 Wil-Freds Change Order 3 CDI CLARK DIETZ, INC. • Request for P.O.87 B. Neil , Suite 100 Authorization Of Changes Champaign, IL 61820 217/373-8900 TO Mr. Dennis King PROJECT Slade Avenue Facility Water Operations Engineer DATE 3/15/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY Kane • 150 Dexter Court STATE Illinois • Elgin . IL 60120-5555 CONTRACTOR Wil -Freds Construction CHANGE ORDER NO. 3 GENTLEMEN: SHEET NO. 1 OF 3 The following change(s) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS DEDUCTIONS See attached document. Change Proposal 2A Revised $76.00 • • The Contract Price for this Change Order will be • ( i•ncreased) tb4dMA441 by the Amount of this Order: $ 76.00 Amount of Previous Orders: $ (17,461.20) The work covered by this order Original Contract Amount: $ 3,694,4UU.UU shall be performed under the Original Contract Amount and Orders: $ 3,677,014.80 same terms and conditions as that included in the original Contract. • The Contract Time will be 0(aegaasgx0 (xrdacalmcged (Unchanged) by 0 calendar days (this C.O. ) . The date for completion of all work under the contract will be June 30, 1992 The date for substantial completion of work under the contract will be October 31 , 1991 . Approvamnended• Approv:d by:� Resident Project Repr sentative Owner Repre .‘tative Approval Recommended: Ac• tedgi if• / Clark, Dietz Inc. •ntrac •r • . �. WIL-FREDS P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897-4000 March 7, 1991 ` `\ • ■ Clark Dietz Inc. VRI41991 1817 S. Neil "U Suite 100 Champaign, IL 61820 Attn: Marty Vogel Re: Slade Avenue Facilities - Elgin WFS Proposal Request #2-A Revised Hardware Revisions Dear Marty: Per your letter dated January 31, 1991 the following extra costs are being submitted to change hardware from knob handles to lever handles on ten (10) doors. 10 lever handles (Ken-Lee) $ 65.00 O.H. 10% (7.00) 72.00 Profit 5% 4.00 Total Add $ 76.00 Please issue a formal change order for this work. No material will be ordered until a signed change order is received. Yours truly, WIL-FREDS CONSTR ION, INC. Jim J 1 Proj ct Manag r JJ:cr Enclosure cc: WFS CP #2-A file w/attachments cp2-A 274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505 FAX(708)897-4444 1•1 - E. - 91 WE1) 1 T _ 2 1- r- _ 10, 1 ; 01 Ken - Lee hardware company TELEFAX MESSAGE DATE• �14R_i_ 6. j 94 /_ TO:_ WIRE= is �DN,j'r Cfl &/ ,4- -. v: rn a"i4�,ycL • FROM:, _ "Ay, a,e wk.'? SUBJECT: SL/9-1E /4✓eN00 f14-rriL,1'Y MESSAGE: 7._____it ' • 0i✓ E s• 0 .6'z a .__._.. ar h , "Me CAan ye of L-EL o) _Kivol `cc 4s iv Lever AAnd le Leeks. Pleafe adel .Me sviyi o . 65•o -t. O oewriA 1 e LEi'-,e 1/4-A/01-.E ,tae es, TOTAL NUMBER OF PAGES / (INCLUDING THIS SHEET) 4820 north central avenue . chIcago, Illinois socao • phone 312/885-3220 fax 312/685-6894 RESOLUTION APPROVING CHANGE ORDER NO. 3 IN THE CONTRACT WITH WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE WATER FACILITY WHEREAS, the City of Elgin has heretofore entered into a contract with Wil-Freds Construction for the construction of the Slade Avenue Water Facility; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 3, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 3, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: May 22, 1991 Adopted: May 22, 1991 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Nancy Roll Nancy Roll, Deputy Clerk Elm r ;4 °F Agenda Item No. no9po�gIED f TO: Mayor and Members of the City Council FROM: City Manager DATE: April 18, 1991 SUBJECT: SLADE AVENUE FACILITY CHANGE ORDERS PURPOSE: This memorandum will provide the Mayor and Council with information to consider in authorizing change orders to the existing contracts for design and construction of the new Slade Avenue facility. It is also the intent of this memorandum to inform of potential and anticipated change orders. BACKGROUND: eik On September 13, 1989, a contract was awarded to Clark Dietz, Inc. , to design a new water facility for the Slade Avenue site. On September 26, 1990, a contract was awarded to Wil-Freds Construction for construction of this facility. These improvements are essential in order to replace this outdated, deteriorated facility and maintain the well and pumping functions that are a vital part of the City's water system. Incomplete records of this 100-year-old facility and of the various changes made to it over the years created a design based upon unpredictable conditions. As construction progresses, these unpredictable conditions are becoming visible, and change orders are required. The first change order is for a variety of electrical modifications, including routing, conduit material, and manhole, hand hole, and conductor changes. r Page 2 The second involves a variety of items including replacement of sections of storm sewer found in unacceptable condition, rerouting of the new 24" low service water line due to unforeseen physical conditions of the existing piping, addition of a valve and vault on the new 24" line to avoid interruption of service during the connection of a future main projected by the distribution system master plan being developed by Black & Veatch, and modification of a door header with addition of conduit and connectors for computer cables. The third is to change door knob handles to lever handles for handicap access . During shop drawing review it was discovered that no solid state protection was requested for any of the well or motor starters nor were meters sought for monitoring the wells. Also, it was found that a secondary fused switch and a 5 KV neutral conducted could be eliminated. These changes will, however, require additional design effort. Review of the well sites prior to placement of new electrical . 470 equipment found the vaults of the two wells with modifications included in the work scope in need of replacement and the balance of the wells in need of vault work and replacement pads. This work will also require additional design effort. Additional changes that further affect the work scope of this project have been identified. The changes are to thrust blocks, pump control panel, excavation and fill of the lime lagoon (unit priced in the contract) , construction of the electrical changes associated with the additional design effort listed above, construction associated with the additional well work scope, additional work associated with the flooding of an excavation due to an unidentified main, unidentified lime lagoon decant vaults interfering with the new building foundation, changes to conduit, change from an elbow to a tee on the pump suction line for continuity of service, retaining wall design, and removal of existing unidentified piping interfering with the building foundation. ork Page 3 In keeping with one of the original criteria of this project, the aesthetics of the site have been taken into consideration when addressing functional changes . Some of the changes will affect the project completion time; it is projected that the substantial completion date may be delayed by 30 days, bringing the projected completion date to July 30, 1992 . There are additional costs accruing to the project that are not directly associated with existing contracts; they are the costs of quality control testing services and utility company charges for changing the existing utility services. FINANCIAL IMPACT: Quotes have been obtained from the general contractor and the consultant for the three construction change orders and the two design change orders described above. Change Order #1 - Electrical -$ 54,890 (Credit) Change Order #2 - Plumbing $ 37,428 Change Order #3 - Door Hardware $ 76 -$ 17,386 (Credit) Estimate of future change orders $200,000 Electrical Design $ 3,000 Well Design $ 3,417 $ 6,417 The contract with Wil-Freds for construction of this project is for $3,694,400 . There are sufficient funds available in the Water Department' s operating fund to pay for these projected changes. The contract with Clark Dietz, Inc. , for design services is for $358,777 . Again, sufficient funds are available in the water operating fund for these changes . r Page 4 RECOMMENDATION: It is recommended that the City Council approve these change orders to the original contract with Wil-Freds Construction for a total credit of $17,386 and approve the changes to the design contract with-- Inc. , for a total of $6,417 . 11111F , 424/__NS -,......k Cit Man LLR:DMK: jk 01140418. 191 Attachments 4) • 47) • • CDI CLARK DIETZ, INC. Request for 1817 S. Neil , Suite 100 Authorization P.O. Box 676 Of Changes • Champaign, IL 61820 217/373-8900 TO Mr. Dennis King PROJECT Slade Avenue Facility Water Operations Engineer DATE 2/13/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY Kane 150 Dexter Court STATE Illinois . Elgin , Illinois 60120-5555 CONTRACTOR Wil-Freds Construction CHANGE ORDER NO. 1 • GENTLEMEN: SHEET NO. 1 OF 6 The following change(s) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS DEDUCTIONS See attached documents. Items 1 through 5. • $54,890.00 • • . . The Contract Price for this Change Order will be • (X)b)CXXIIx xtI (decreased) by the Amount of this Order: $54,890.00 Amount of Previous Orders: $ 0 The work covered by this order Original Contract Amount: $3,694,400.06 shall be performed under the Original Contract Amount and Orders: $3,639,510.00 same terms and conditions as • that included in the original Contract. • The Contract Time will be (JCmmAx101) (0gg(x ana) (Unchanged) by 0 calendar. days (this C.O.) . • The date for completion of all work under the contract will be June 30, 1992 Appro al Recommende Approved by: /se i i�zav�ill iL' 9/; q g 1 'esident Project Re'resentative 'Owner's Representative // Approval Recommended: Ac epted by/ c/../57/ Clark, Diet , Inc. / ontract. 0 o • . C 1 CLARK DIETZ, INC. Al) Request for 1817 S. Neil , Suite 100 Authorization P.O. Box 676 Of Changes • Champaign, IL 61820 217/373-8900 TO Mr. Dennis King PROJECT Slade Avenue Facility Water Operations Engineer DATE 3/7/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY . Kane 150 Dexter Court STATE Illinois • . Elgin, Illinois 60120-5555 CONTRACTOR Wil-Freds Construction CHANGE ORDER NO. 2 • GENTLEMEN: SHEET NO. 1 OF 17 The following change(s) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS DEDUCTIONS See attached documents. $37,428.00 Change Proposals 3, 4, 5, 6 and 7. I The Contract Price for this Change Order will be • ( increased) 6cdcouce,acscectk by the Amount of this Order: $ 37,428.80 Amount of Previous Orders: b (54,890.00) The work covered by this order Original Contract Amount: $ 3,694.400.00 ' shall be performed under the Original Contract Amount and Orders: $ 3,676,938.80 same terms and conditions as that included in the original • Contract. • The Contract Time will be (cicaa►xgxttNq WIMIMM0440 (Unchanged) by 0 calendar. days ( this C.O. ) . The date for completion of all work under the contract will be June 30, 1992 . Approval Rec mmpende Approved by:6/ '1 74...A.Z.. '-"P.,c--,f-:---, .. ---.7.7-;--7. 4_, ./.7a/ • 1 Resident Project Rep esentative Owner's Representative / Approv. l Recommended: epted b . I44 ' 3—'S—S/ Clark, Dietz, Inc. ontrac�t r 'Ice eze//.v Sc al.G e G w cfa..k-- 4-N0. les t • , . CLARK DIETZ, INC. Request for 1817 S. Neil , Suite 100 Authorization P.O. Box 676 Of Changes • Champaign, IL 61820 217/373-8900 TO Mr. DennisKing PROJECT Slade Avenue Facility Water Operations Engineer DATE 3/15/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY Kane 150 Dexter Court STATE Illinois Elgin, Illinois 60120-5555 CONTRACTOR Wil-Freds Construction CHANGE ORDER NO. 3 • GENTLEMEN: SHEET NO. 1 OF 3 The following change(s) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS DEDUCTIONS See attached document Change Proposal 2-A Revised $76.00 r • The Contract Price for this Change Order will be - ( increased) (=XXVIWW.by the Amount of this Order: $ 76.00 Amount of Previous Orders: $ , (17 ,461.20) The work covered by this order Original Contract Amount: $3,694;400.00 shall be performed under the Original Contract Amount and Orders: $3,677.014.80 same terms and conditions as that included in the original Contract. The Contract Time will be (i)h X-YsX 'd`O9 (S1¢1f3E>¢I4XX1) (Unchanged) by 0 calendar. days (this C.O. ) .. • The date for completion of all work under the contract will be June 30, 1992 • Appro al R ommend Approved by: • e ident Project R resentative owner's Representat-iti e Approval Recommended: epted ontract. Clark, Dietz, Inc. 1 _ .• • CDCLARK DIETZ, INC. April 1, 1991 Mr. Dennis King City of Elgin 150 Dexter Court Elgin, IL 60120-5555 Re: Slade Avenue Water Facility Dear Dennis: I am transmitting a memo from our electrical department concerning changes you have requested. The cost of the requested effort will be approximately $3,000. Please provide an authorization to proceed with this additional work. Sincerely, • Charles E. Park • Clark Dietz, Inc. 1817 S. Neil, Suite 100 PO. Box 676 Champaign, IL 61824-0676 217/373-8900 ENGINEERS ARCHITECTS CDI CLARK DIETZ, INC. r April 9, 1991 • Mr. Dennis King City of Elgin 150 Dexter Court Elgin, IL 60120-5555 • Re: Slade Avenue Water Facility Well Modifications Dear Dennis: I have modified my estimate for the referenced work per our conversation this morning. A copy of my estimate is attached. It is my understanding that our site inspector is to obtain the field information as time is available. We will proceed with the work as soon as we receive your authorization. If you have further questions, please call . Sincerely, ir i//c° Charles E. Park cc: Mr. Richard Christensen/CDI Mr. Marty Vogel/CDI Clark Dietz, Inc. 1817 S. Neil, Suite 100 • P.O. Box 676 Champaign, IL 61824-0676 217/373-8900 ENGINEERS ARCHITECTS CITY OF ELGIN - SLADE AVENUE WELL MODIFICATIONS Revised 4/9/91 Project Total Designer Drafter Manager Manhours Gather Information on Existing Contitions 0 0 Detail Existing Conditions 2 12 2 16 Design Well # 1 Site & Vault 0 0 0 0 Design Well # 2 Site & Vault 4 2 1 7 Design Well # 3 Site & Vault 4 2 1 7 Design Well # 4 Site & Vault _ 0 0 0 0 • Design Well # 5 Site & Vault 2 2 1 5 Design Well # 6 Site &Vault 2 2 1 5 Revise per City Comments 8 6 3 17 Prepare Construction Cost Estimate 5 2 7 Review Contractor's C.O. Proposal 4 2 6 Total Manhours 31 26 13 70 Total Labor $1,501 $792 $924 $3,217 Expenses $200 TOTAL COST $3,417 .• CD I CLARK DIETZ, INC. April 2, 1991 Mr. Dennis King City of Elgin 150 Dexter Court Elgin, IL 60120-5555 Re: Slade Avenue Water Facility Well Modifications Dear Dennis: I have received your letter of March 29, 1991 requesting modification to the work for the referenced project to include well site modification. Mr. Vogel informed me that you inquired about the inclusion of this work in our existing contract. I have reviewed our contract and files to find an answer to your question. The Project Scope in the contract specifically includes new electrical controls and service to the six wells. There is no mention of other work related to the wells. I did not find any correspondence in our files related to the work outlined in your letter. Therefore, I do not believe this work is a part of our current (ow contract. I have attached an estimate to perform the design work outlined in your letter of March 29, 1991. Based on that estimate, I am requesting that you authorize us to proceed with the work for an additional lump sum fee of $ 4,500. We will proceed with the work upon receipt of your authorization. If you have questions concerning this letter or the attachments, please call . Sincerely, Cilatj -117Hate/e" Charles E. Park cc: Mr. Richard J. Christensen/CDI Mr. Marty R. Vogel/CDI Clark Dietz, Inc. 1817 S. Neil, Suite 100 P.O. Box 676 Champaign, IL 61824-0676 217/373-8900 ENGINEERS ARCHITECTS Elm fillik H Agenda Item No. April 18, 1991 MEMORANDUM TO: Mayor and Members of the City Council FROM: Larry L. Rice, City Manager SUBJECT: Plat of Dedication for College Green Drive, a Detention Easement and Two Utility Easements Within Woodbridge North Subdivision PURPOSE: This memorandum will provide the Mayor and Council with information to consider approval of various plats within Woodbridge North Subdivision (see the attached sketch) . rft BACKGROUND: The final plat for Woodbridge North Subdivision Units 1 and 2 was approved by Council on August 22, 1990. This plat did not, however, include the subject off-site dedication and utility easements. The right-of-way dedication and public utility easements are required before the City can accept the underground improvements within the subdivision. Currently there is watermain, sanitary sewer, and storm sewer located within the proposed right-of-way and utility easements. FINANCIAL IMPACT: None. . RECOMMENDATION: It is recommended that the City Council approve the subject dedication and easements and direct staff to prepare the plats for recording with Kane County. Ailli . f Lar ,' . 'ice, C'ty Manager do Attachment r Illinois Department Request for Approval Municipality Elgin of Transportation of Change in Plans Township County Kane Elgin Pedestrian and Section Bike Path Request No. 1 Revised To: City of Elgin April 1 , 19 91 Elgin , Illinois Contractor Pyramid Concrete & Blacktop act•Attan • I recommend that an Abe made the above contract. deduction from (between Station 539+43± and Station 550+13*_ a net length of lineal feet.) (Do not fill In unless a change In length Is Involved.) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the contract unit prices.Show station location for major items. Item No. Items Additions Deductions 9. Concrete Barrier Wall (1070 L.F. @ $28.98) $31,008.60 9A. Install Plastic Barrier Wall (Lump Sum) $ 4,820.00 • r *Agreed Price Letter mddfiiea 26,188.60 38.7a Totals: $ 4,820.00 $31,008.60 Total net deduction to date$ which is—k of Contract price. Net Change 26,188.60 State fully the nature and reason for the change: To reduce total weight on parking deck Signed 19 Sired AFL1 1 1991 LI Highway Commissioner IAfaiui tlrrlfr k Approved Resident Engineer commended County Superintendent of Highways 4 tbib 7 cX4M1045[ Note: Make out separate form for change in length quantities. Approved 19 91 Give net quantities only. Submit 3 copies of this form to district engineer(4 copies for road district) If plans are required attach three sets. BLR 6301 Nirtwari**Ax City Engineer (4-86) - • - 04/04/91 05:12 70082533500 PYRAMID CONCRETE INC PAGE 01 .411, CC]N -" ET & BLACKTOP 437 S. Patton Avenue A Arington Heights, IL 60005 A (708)253-3500 ♦ FAX (708) 253-2771 April 04, 1991 Mr. Dick Hampton Hampton, Lenzini & Renwick, Inc. Civil Engineers 390 Shepard Drive Elgin, Illinois 60123-7010 RE: Change Order - Item 9A, Install Barrier Wall Dear Mr. Hampton , We hereby propose to due the following work : *1: To install plastic traffic dividers, dividers and epoxy to be supplied by the City of Elgin . Total Cost Installed Labor Only: $4,820.00 Respectully submitted, Jeff Sanders, President Bob Leahy Pyramid Concrete & Project Manager Blacktop, Inc. I