Loading...
HomeMy WebLinkAbout91-0213 Wil-Freds Change Order1 P"..- p R . D' CLARK DIETZ, INC. Request for 1817 S. Neil , Suite 100 Authorization P.O. Box 676 Of Changes Champaign, IL 61820 217/373-8900 TO Mr. Dennis King PROJECT Slade Avenue Facility Water Operations Engineer DATE 2/13/91 JOB NO E04020 City of Elgin CITY Elgin COUNTY Kane 150 Dexter Court STATE Illinois Elgin, Illinois 60120-5555 CONTRACTOR ' Wil-Freds Construction CHANGE ORDER NO. 1 GENTLEMEN: SHEET NO. 1 OF 6 The following change(s ) from the plans in the construction of the above designated project is recommended. ITEM(S) ADDITIONS ', DEDUCTIONS See attached documents. Items 1-5. $54,890.00 1. No change to Contract. 2. No change to Contract. 3. Change from galvanized to PVC to provide cost savings to the City. 4. No change to Contract. 5. Duct bank. locations were consolidated. No change to Contract. The Contract Price for this Change Order will be • ( increased) (decreased) by the Amount of this Order: $ 54,890.00 • Amount of Previous Orders: $ 0.00 The work covered by this order Original Contract Amount: $ 3.694,400.00 shall be performed under the Original Contract Amount and Orders: $ 3,639,510.00 same terms and conditions as . that included in the original . Contract. • The Contract Time will be (ic acma tilq (dV ) (Unchanged) by 0 calendar, days (this C.O. ) . The date for completion of all work under the contract will be June 30, 1992 • The date for substantial completion of work under the contract will be October 31 , 1991 . Approval R com•nen d: Approv-d ..y: ;o7 R_ Lv7.... esident Project Representative 0 F epre entative Approval Recommended: epted sy: Iteli-OC4,104r--e,4--)1 -4—/ , /Zailel—,;/- 2t4z- Clark, Dietz, Inc. on trac t•r ✓ - •� WIL-FREDS P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897-4000 OWE II FEB g 1991 • February 6, 1991 Clark Dietz Inc. -1817 S. Neil Suite 100 Champaign, IL 61820 ; 'Attn: Marty Vogel Re: Slade Avenue Facilities - Elgin • WFS Change Proposal #1 Dear Marty: Enclosed is the final credit for the site electrical changes as stated in the letter the credit to be issued will be Fifty Four Thousand Eight Hundred Ninety & 00/100 ($54,890.00) . Please prepare a formal change order for the City of Elgin to sign and issue to us. • If you have any questions, please call. Yours truly, WIL-F CONSTRUCTION, INC. Jim J enel `Pro'ect Mana er JJ:cr Enclosure cc: CP #1 file w/enclosure voge12.6 274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505 FAX(708)897-4444 • _t, •• VP . J r ALTHOFF INDUSTRIES INC. am.I� Mechanical/Electrical Contractors and Engineers February 1, 1991 Jim Jaenel Wil-Freds, Inc. P.O. Box 4050 Naperville, I1. 60567 RE: SLADE AVENUE FACILITIES, ELGIN, ILLINOIS ELECTRICAL CHANGE PROPOSAL AND CLARIFICATIONS OUR LETTER OF DEC. 11, 1990 RETURNED WITH CLARK DIETZ, INC. COMMENTS RECEIVED FEB. 1, 1991 Dear Jim: Item #1 No change Item #2 No change Item #3 No change Item #4 12, Conductor #12 cable will be non-shielded type Item #5 (a) Relocate duct banks - no change (b) 5KV duct banks will utilize 5KV manholes only (c) Low voltage duct banks will utilize low voltage handholes only (d) 5KV conduits separation from control conduits will comply with 5KV cable manufacturers recommendations Item #1 through Item #5 will result in a credit of $54,890.00. Sincerely, Bud Weaver Project Manager cc: Bill Aylward Gary Garde 8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000 4 . °: WIL-FREDS . 6n,> ,, P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)357-0222 WE'RE MOVING !Il i I '''/: l°:� i;1 JANUARY 1, 1991 December 14, 1990 `°-111 otrlElolstreetactress,phonetxmDcrandtax.` I I Wil-Prods I O_�, 1 71990 Iii i 274 E.Indian Trail . III ', i Asmara.n. 80600 "' .' i j 'i' 1,I !'i000 Not(7Oe)897-1000 .._. Clark Dietz Inc. I -- ---_ fit-' I Tax No:(708)e07-4asa' 1817 S. Neil our P.O.Box will remain the same: .:- I P.O.Box 4050,Naperville,IL 60567-4050'; Suite 100 . . ' __._._... ._.__ • Champaign, IL 61820 Attn: Buddy Schuler Re: Slade Avenue Facility Elgin, IL Dear Buddy: Enclosed is a letter from Althoff Industries, our electrical contractor for the above project, indicating various items that were discussed with Bill Blackmoor regarding electrical changes. Please review these items and if acceptable to you and the owner, confirm back to me in writing your approval. If you have any questions, please call. Yours truly, WIL-FRE S CONSTRUCTION, INC. • Jim J nel Proj 't Manager JJ:cr Enclosures cc: City of Elgin - Dennis King w/attachments . Althoff file w/attachments schulrl2.14 . 3033 OGDEN AVENUE • LISLE,ILLINOIS 60532 FAX(708)357-9595 4 re,C 4 7ALTHOFF INDUSTRIES INC. Mechanical/Electrical Contractors and Engineers . December 11, 1990 /q�> rhe4� Jim Jaenel Wil-Freds Construction, Inc. .P.O. Box 4050 Naperville, I1. 60567 { * .. �� RE: SLADE AVENUE FACILITY ,.;- ice:>!/ ELGIN, ILLINOIS .;. � ELECTRICAL CHANGE PROPOSALS AND CLARIFICATIONS Dear Jim: Concerning our previous phone conversations with Bill Blackmoor of Clark Dietz, Inc. , we propose the following items for your review, comments and approval; Item #1 - 2" rigid galvanized conduit for telephone service (in duct banks) to remain as shown. Item #2 - 5" rigid galvanized conduit from CECO pad to building (12 conduits) to remain as shown. Item #3 - 5" rigid galvanized conduit in duct banks (other than Item #2) change to 5" PVC Schedule 40. Item #4 - Ten - 1-conductor #12 control wires (in duct banks) change to One 12-conductor #12 cable with shield (2 spares for future) . C pi-e0 06 i)/)- _S/, ;(/--4 cct bi ) Item #5 - Relocate duct banks as follows: DWG E-2 B-B Adjacent to I-I in same trench DWG E-3 B-B Adjacent to I-I in same trench DWG E-3 B-B Adjacent to J-J in same trench DWG E-3 A-A Adjacent to I-I in same trench DWG E-4 A-A Adjacent to I-I in same trench DWG E-4 A-A Adjacent to H-H in same trench DWG E-4 C-C Adjacent to D-D in same trench (See attached revised drawings E-2, E -3, E-4. ) ;10t o' c � : •� /21,./.s A ie n -� V A - PRo (1)6 Su Fr it' T S' OQr-tJ''.'u�t E, SkV Cu s Fro•n CcTti-n/ C e n c(1 .Js t /)rrt'e,CV ; r11'ferr . 8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000 • .yA < , ✓ :�.. / • • -ed Page 2 The above proposed changes will result in a credit of $54,890.00 If you have any questions regarding the above, please call. Sincerely, ALTHOFF INDUSTRIES, INC. cf. Bill Aylward Electrical Operations Manager cc: Gary Garde Bud Weaver File BW/is • RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE WATER FACILITY WHEREAS, the City of Elgin has heretofore entered into a contract with Wil-Freds Construction for the construction of the Slade Avenue Water Facility; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/ George VanDeVoorde George VanDeVoorde, Mayor Presented: May 22, 1991 Adopted: May 22, 1991 Vote: Yeas 7 Nays 0 Recorded: Attest: s/ Nancy Roll Nancy Roll, Deputy Clerk