HomeMy WebLinkAbout91-0213 Wil-Freds Change Order1 P"..- p
R .
D' CLARK DIETZ, INC.
Request for 1817 S. Neil , Suite 100
Authorization P.O. Box 676
Of Changes Champaign, IL 61820
217/373-8900
TO Mr. Dennis King PROJECT Slade Avenue Facility
Water Operations Engineer DATE 2/13/91 JOB NO E04020
City of Elgin CITY Elgin COUNTY Kane
150 Dexter Court STATE Illinois
Elgin, Illinois 60120-5555 CONTRACTOR ' Wil-Freds Construction
CHANGE ORDER NO. 1
GENTLEMEN: SHEET NO. 1 OF 6
The following change(s ) from the plans in the construction
of the above designated project is recommended.
ITEM(S) ADDITIONS ', DEDUCTIONS
See attached documents. Items 1-5. $54,890.00
1. No change to Contract.
2. No change to Contract.
3. Change from galvanized to PVC to
provide cost savings to the City.
4. No change to Contract.
5. Duct bank. locations were consolidated.
No change to Contract.
The Contract Price for this Change Order will be •
( increased) (decreased) by the Amount of this Order: $ 54,890.00
• Amount of Previous Orders: $ 0.00
The work covered by this order Original Contract Amount: $ 3.694,400.00
shall be performed under the Original Contract Amount and Orders: $ 3,639,510.00
same terms and conditions as .
that included in the original .
Contract.
•
The Contract Time will be (ic acma tilq (dV ) (Unchanged) by 0 calendar,
days (this C.O. ) .
The date for completion of all work under the contract will be June 30, 1992 •
The date for substantial completion of work under the contract will be October 31 , 1991 .
Approval R com•nen d: Approv-d ..y:
;o7 R_ Lv7....
esident Project Representative 0 F epre entative
Approval Recommended: epted sy:
Iteli-OC4,104r--e,4--)1 -4—/ , /Zailel—,;/- 2t4z-
Clark, Dietz, Inc. on trac t•r
✓ - •�
WIL-FREDS
P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)897-4000
OWE
II
FEB g 1991
• February 6, 1991
Clark Dietz Inc.
-1817 S. Neil
Suite 100
Champaign, IL 61820
; 'Attn: Marty Vogel
Re: Slade Avenue Facilities - Elgin •
WFS Change Proposal #1
Dear Marty:
Enclosed is the final credit for the site electrical changes as stated in the
letter the credit to be issued will be Fifty Four Thousand Eight Hundred Ninety
& 00/100 ($54,890.00) .
Please prepare a formal change order for the City of Elgin to sign and issue to
us.
•
If you have any questions, please call.
Yours truly,
WIL-F CONSTRUCTION, INC.
Jim J enel
`Pro'ect Mana er
JJ:cr
Enclosure
cc: CP #1 file w/enclosure
voge12.6
274 E. INDIAN TRAIL • AURORA, ILLINOIS 60505
FAX(708)897-4444
•
_t,
•• VP .
J r ALTHOFF INDUSTRIES INC.
am.I�
Mechanical/Electrical Contractors and Engineers
February 1, 1991
Jim Jaenel
Wil-Freds, Inc.
P.O. Box 4050
Naperville, I1. 60567
RE: SLADE AVENUE FACILITIES, ELGIN, ILLINOIS
ELECTRICAL CHANGE PROPOSAL AND CLARIFICATIONS
OUR LETTER OF DEC. 11, 1990 RETURNED WITH
CLARK DIETZ, INC. COMMENTS RECEIVED FEB. 1, 1991
Dear Jim:
Item #1 No change
Item #2 No change
Item #3 No change
Item #4 12, Conductor #12 cable will be non-shielded type
Item #5 (a) Relocate duct banks - no change
(b) 5KV duct banks will utilize 5KV manholes only
(c) Low voltage duct banks will utilize low voltage
handholes only
(d) 5KV conduits separation from control conduits will
comply with 5KV cable manufacturers recommendations
Item #1 through Item #5 will result in a credit of $54,890.00.
Sincerely,
Bud Weaver
Project Manager
cc: Bill Aylward
Gary Garde
8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000
4 .
°: WIL-FREDS
. 6n,>
,, P.O.BOX 4050 • NAPERVILLE,IL 60567 • (708)357-0222
WE'RE MOVING !Il
i I '''/: l°:� i;1 JANUARY 1, 1991
December 14, 1990 `°-111 otrlElolstreetactress,phonetxmDcrandtax.`
I I Wil-Prods
I O_�, 1 71990 Iii i 274 E.Indian Trail .
III ', i Asmara.n. 80600 "' .'
i j 'i' 1,I !'i000 Not(7Oe)897-1000 .._.
Clark Dietz Inc. I -- ---_ fit-' I Tax No:(708)e07-4asa'
1817 S. Neil our P.O.Box will remain the same: .:-
I P.O.Box 4050,Naperville,IL 60567-4050';
Suite 100 . . ' __._._... ._.__
•
Champaign, IL 61820
Attn: Buddy Schuler
Re: Slade Avenue Facility
Elgin, IL
Dear Buddy:
Enclosed is a letter from Althoff Industries, our electrical contractor for the
above project, indicating various items that were discussed with Bill Blackmoor
regarding electrical changes.
Please review these items and if acceptable to you and the owner, confirm back
to me in writing your approval.
If you have any questions, please call.
Yours truly,
WIL-FRE S CONSTRUCTION, INC.
•
Jim J nel
Proj 't Manager
JJ:cr
Enclosures
cc: City of Elgin - Dennis King w/attachments .
Althoff file w/attachments
schulrl2.14 .
3033 OGDEN AVENUE • LISLE,ILLINOIS 60532
FAX(708)357-9595
4 re,C
4 7ALTHOFF INDUSTRIES INC.
Mechanical/Electrical Contractors and Engineers .
December 11, 1990 /q�>
rhe4�
Jim Jaenel
Wil-Freds Construction, Inc.
.P.O. Box 4050
Naperville, I1. 60567 { * .. ��
RE: SLADE AVENUE FACILITY ,.;- ice:>!/
ELGIN, ILLINOIS .;. �
ELECTRICAL CHANGE PROPOSALS AND CLARIFICATIONS
Dear Jim:
Concerning our previous phone conversations with Bill Blackmoor of
Clark Dietz, Inc. , we propose the following items for your review,
comments and approval;
Item #1 - 2" rigid galvanized conduit for telephone service (in
duct banks) to remain as shown.
Item #2 - 5" rigid galvanized conduit from CECO pad to building
(12 conduits) to remain as shown.
Item #3 - 5" rigid galvanized conduit in duct banks (other than
Item #2) change to 5" PVC Schedule 40.
Item #4 - Ten - 1-conductor #12 control wires (in duct banks)
change to One 12-conductor #12 cable with shield
(2 spares for future) . C pi-e0 06 i)/)- _S/, ;(/--4 cct bi )
Item #5 - Relocate duct banks as follows:
DWG E-2 B-B Adjacent to I-I in same trench
DWG E-3 B-B Adjacent to I-I in same trench
DWG E-3 B-B Adjacent to J-J in same trench
DWG E-3 A-A Adjacent to I-I in same trench
DWG E-4 A-A Adjacent to I-I in same trench
DWG E-4 A-A Adjacent to H-H in same trench
DWG E-4 C-C Adjacent to D-D in same trench
(See attached revised drawings E-2, E -3, E-4. )
;10t o' c � : •� /21,./.s A ie n -� V A -
PRo (1)6 Su Fr it' T S' OQr-tJ''.'u�t E, SkV Cu s Fro•n CcTti-n/
C e n c(1 .Js t /)rrt'e,CV ; r11'ferr .
8001 SOUTH ROUTE 31, • CRYSTAL LAKE, IL 60014-9099 • 815-455-7000
•
.yA < ,
✓ :�.. /
•
• -ed
Page 2
The above proposed changes will result in a credit of $54,890.00
If you have any questions regarding the above, please call.
Sincerely,
ALTHOFF INDUSTRIES, INC.
cf.
Bill Aylward
Electrical Operations Manager
cc: Gary Garde
Bud Weaver
File
BW/is
•
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
WIL-FREDS CONSTRUCTION FOR THE SLADE AVENUE WATER FACILITY
WHEREAS, the City of Elgin has heretofore entered into a
contract with Wil-Freds Construction for the construction of
the Slade Avenue Water Facility; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: May 22, 1991
Adopted: May 22, 1991
Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Nancy Roll
Nancy Roll, Deputy Clerk