HomeMy WebLinkAbout91-0213 Gluth Brothers qt -oar 3
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
GLUTH BROTHERS CONSTRUCTION CO. , INC. FOR THE
LAUREL STREET STORM SEWER REPLACEMENT
WHEREAS, the City of Elgin has heretofore entered into a
contract with Gluth Brothers Construction Co. , Inc. for the
Laurel Street storm sewer replacement; and
WHEREAS, it is necessary and desirable to modify the
terms of the contract as is described in Change Order No. 1,
attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ELGIN, ILLINOIS, that Larry L. Rice, City Manager, be
and is hereby authorized and directed to execute Change Order
No. 1, a copy of which is attached hereto and made a part
hereof by reference.
s/ George VanDeVoorde
George VanDeVoorde, Mayor
Presented: February 13, 1991
Adopted: February 13, 1991
Vote: Yeas 7 Nays 0
Recorded:
Attest:
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
ELGIN, ILLINOIS
LAUREL STREET STORM SEWER REPLACEMENT
CHANGE ORDER NO. 1 & FINAL
SCOPE:This Change Order No. 1 & final will provide funds for
the additional sewer repairs and right-of-way
restoration costs associated with the Laurel Street
Sewer Replacement project.
The general contractor for this project is Gluth
Brothers Construction Co. , Inc. of Woodstock, IL.
REASONS FOR CHANGE: This change order is required for the
costs associated with two added sanitary sewer manholes and the
additional sidewalk, curb & gutter, pavement patching and trench
backfill . The two added sanitary sewer manholes were installed
to aid our Public Works crews and to enhance the existing
system. The additional sidewalk, curb & gutter, pavement
patching and trench backfill are a result of the soil conditions
causing substantial embankment failure during construction which
was not anticipated at the time of bidding.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the
contract will be revised as follows:
ITEM ADD
Trench Backfill $ 12,852 .00
P.C.C. Sidewalk, 5" 922 .00
P.C.C. Driveway Pavement, 6" 260.00
Combination Curb & Gutter, Type B-6 . 18 6,585.00
P.C.C. Base Course, 6" 832. 00
Bit. Mix. Complete, B-5 (Mod) 5,080.00
Manholes, Type A, 5' Dia.
-Type 1 Frame and Closed Lid 10,000 .00
TOTAL ADD $36,531.00
Total Various Deductions From Bid Items (-$ 7,549 .00)
Change Order Amount $28,982.00
The present contract with Gluth Brothers Construction Co. , Inc.
is for $153,637 .00. By reason of this Change Order No. 1 &
Final, the contract for the Laurel Street Storm Sewer
Replacement will be increased in the amount of twenty eight
thousand nine hundred eighty two dollars( $28,982 .00) , the total
contract value being one hundred eighty two thousand six hundred
nineteen dollars ($182,619.00) .
CHANGE ORDER NO. 1 & FINAL
January 16, 1991
Page 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this ' day of , 1990.
Recommended:
ENGINEERING VISION
By:
Date: 1- 11- 9
Accepted:
GLUTH BROTHERS CONSTRUCTION CO. , INC.
Party of the Sec. Part (Contractor)
By
��� `,
Tit ��._,_, .
Date: =c Ct. 1 '- c-r l
Approved:
CITY OF ELGIN
Party of the Fi •444u art (Owner)
By: •1 ..r
Title: "' in / or
r
Date: --;V/0/
• r
eibk 3 (1-
Agenda Item No.
January 17, 1991
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: City Manager
SUBJECT: Laurel Street Storm Sewer Replacement
Change Order No. 1 & Final
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider the authorization of additional
funds for the subject project.
e BACKGROUND: The City Council awarded the contract for the
Laurel Street Storm Sewer Replacement at their regular meeting on
February 14, 1990 to Gluth Brothers Construction, Inc. The work
on this project is now complete and a final inspection has been
made.
The project involved the replacement of an existing storm sewer
on Laurel Street between Porter Street and Willow Creek which is
just west of Willard Avenue. The existing storm sewer had
deteriorated and was partially collapsed that it could not carry
storm water out of the intersection of Porter and Laurel Streets
in sufficient quantity so as to keep the intersection from
flooding. The intersection does now drain which is great for
the Elgin residents who live there.
The installation of the storm sewer required boring under
Liberty Street ( Illinois Route 25) which requires pits on each
side of Liberty Street to place the boring equipment and for
working space. The sewer was placed fairly shallow at Porter,
but was very deep under Liberty Street to avoid conflict with
the sanitary sewer. To avoid other utilities, a sanitary sewer
and trees the sewer was placed close to the south curb line
along Laurel.
4410
Mayor and Members of
the City Council
January 17, 1991
Page 2
The staff was aware of the sandy/gravelly soil conditions which
would make it difficult to place the sewer and had provided for
additional trench backfill material . However, the conditions
encountered were worse than expected. Even with the use of a
trench box by the contractor to hold the trench walls, the
sandy/gravelly soil could not be contained. The soil collapsed
which resulted in a significantly wider trench at the surface
and the loss of 230 square feet of sidewalk, a driveway and 439
feet of curb and gutter. It also required more than the planned
pavement restoration.
Two sanitary sewer manholes were also constructed and the costs
included with this contract. These manholes were constructed
in-line with the existing sanitary sewer along Laurel Street
between Liberty Street and Willard Avenue. The manholes will
allow our Public Works personnel to maintain the sewer on a
periodic basis. This maintenance could not be performed in the
past because the distance between the existing manholes located
at Liberty Street and Willard Avenue was too great for Public
Works equipment to properly inspect or clean out. 410
FINANCIAL IMPACT:The original contract was for $153,637 .00.
The final cost of the project is $182,619 .00. This is an
increase of $28,982 . 00. There are additional funds available in
the Sewer Operating Fund (430) for this change order.
RECOMMENDATION: It is recommended that the Council approve
Change Order No. 1 and Final to the Laurel Street Storm Sewer
Replacement project in the amount of $28,982.00 and direct the
staff to prepare the necessary resolution.
A copy of the change order is attached for your consideration.
e-!„e
tear • I,. R' City Manager
Attachment
•, ?
ELGIN, ILLINOIS
LAUREL STREET STORM SEWER REPLACEMENT
CHANGE ORDER NO. 1 & FINAL
SCOPE:This Change Order No. 1 & final will provide funds for
the additional sewer repairs and right-of-way
restoration costs associated with the Laurel Street
Sewer Replacement project.
The general contractor for this project is Gluth
Brothers Construction Co. , Inc. of Woodstock, IL.
REASONS FOR CHANGE: This change order is required for the
costs associated with two added sanitary sewer manholes and the
additional sidewalk, curb & gutter, pavement patching and trench
backfill. The two added sanitary sewer manholes were installed
to aid our Public Works crews and to enhance the existing
system. The additional sidewalk, curb & gutter, pavement
patching and trench backfill are a result of the soil conditions
causing substantial embankment failure during construction which
was not anticipated at the time of bidding.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the
contract will be revised as follows:
r
ITEM ADD
Trench Backfill $ 12,852.00
P.C.C. Sidewalk, 5" 922 .00
P.C.C. Driveway Pavement, 6" 260.00
Combination Curb & Gutter, Type B-6. 18 6,585. 00
P.C.C. Base Course, 6" 832.00
Bit. Mix. Complete, B-5 (Mod) 5,080.00
Manholes, Type A, 5' Dia.
-Type 1 Frame and Closed Lid 10,000. 00
TOTAL ADD $36,531.00
Total Various Deductions Front Bid Items (-$ 7,549 .00)
Change Order Amount $28,982.00
The present contract with Gluth Brothers Construction Co. , Inc..
is for $153,637. 00. By reason of this Change Order No. 1 &
Final, the contract for the Laurel Street Storm Sewer
Replacement will be increased in the amount of twenty eight
thousand nine hundred eighty two dollars($28,982.00) , the total
contract value being one hundred eighty two thousand six hundred
nineteen dollars ($182,619 .00) .
r
CHANGE ORDER NO. 1 & FINAL 4110
January 16, 1991
Page 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall
remain the same.
Agreed to this day of , 1990.
Recommended:
ENGINEERING I� VISION
By: /
Date: /- /7-1-90
Accepted:
GLUTH BROTHERS CONSTRUCTION CO. , INC. 410
Party of the Sec• Part (Contractor)
By *4-444, ��
Tit
Date: �, « 1 G ct /
Approved:
CITY OF ELGIN
Party of the First Part (Owner)
By:
Y
Title:
Date: