CONTRACT
1 . This agreement, made and concluded the 25th day of
October , 1990 between the City of Elgin acting by and
through its Mayor and City Council known as the party of the
first part, and Gluth Brothers Construction, Inc.
his/their executors, administrators, successors or assigns, known
as the party of the second part.
2 . WITNESSETH: That for and in consideration of the payments
and agreements mentioned in the Letter of Proposal hereto
attached, to be made and performed by the party of the first
part.
3 . And it is also understood and agreed that the Letter of
Proposal and the Plans for the E.C.C. Storm Sewer Improvements
approved by the City of Elgin, Illinois, Engineering Division
October 10, 1990, are all essentially documents of this contract
and are a part hereof .
4 . IN WITNESS WHEREOF, The said parties have executed these
presents on the date above mentioned.
Attest: The Ci of Elgin
a40/11ACum— City Clerk By
ayor)
(Seal)
( If a Corporation)
Corporate Name:Gluth Bros. Construction,
Inc.
d*"1225‘2444419--
( If a Co-Partnership)
Attest: i<21.4„,i,
Secretary
November 1, 1990
MEMORANDUM
TO: Loni Mecum, City Clerk
FROM: Ralph Ridley, Engineer
SUBJECT: ECC Fountain Square Storm Sewer
Contracts
You will find attached five (5) copies of the subject contract
which have been executed by the contractor. The City Council
authorized this contract at their last meeting. Please execute
the contracts along with the Mayor, keep one copy and return the
rest to me for distribution to the correct parties .
Please let me know if you have any questions regarding this
matter.
Attachments
•
Ell _ ill
yE� Agenda Item No. 3
October 19, 1990
MEMORANDUM
TO: Mayor and Members of the City Council
FROM: Larry L. Rice, City Manager
SUBJECT: E.C.C. Storm Sewer Improvements
PURPOSE: This memorandum will provide the Mayor and Council
with information to consider the award of a contract for the
subject project.
BACKGROUND: The City Council authorized the staff to solicit
proposals to complete the installation of a separate outfall
system for the E.C.C. Fountain Square Plaza storm water system.
Proposals were solicited from three firms.
Only two of the firms returned a proposal, Illinois Hydraulic,
Inc. , and Gluth Brothers, Inc. Gluth Brothers and Illinois
Hydraulic has completed many projects for the City and private
developers in a satisfactory manner.
FINANCIAL IMPACT: The Engineer's Estimate for this project was
$10,000 . The proposal price submitted by Gluth Brothers was in
the amount of $8,932 .00 and Illinois Hydraulic was $16,800.00.
There are sufficient funds available in the Sewer Fund to pay
for this work.
RECOMMENDATION: It is recommended that the City Council award a
contract to Gluth Brothers, Inc. , for the E.C.C. Fountain Square
Storm Sewer in the not exceed amount of $8,932.00. A copy of
the proposals from Gluth Brothers, Inc. and Illinois Hydraulic,
Inc. , and the contract are attached for your consideration.
Lar • L. Rice City Manager
Attachments
Acod. ranz4utelian,
TELEPHONE 815/338-1662 1151 LAKE AVENUE
FAX 815/338-1047 WOODSTOCK,ILLINOIS 60098
CITY OF ELGIN
150 DEXTER COURT
ELGIN, ILLINOIS 60120
ATTENTION: ENGINEERING DEPT.-MR. RALPH RIDLEY
PROPOSAL FOR E.C.C. FOUNTAIN SQUARE PLAZA, STORM SEWER INSTALLATION,
ELGIN. ILLINOIS
1 . 12" I .D. DUCTILE IRON 50 LF 50.00 2500.00
2. TYPE C PATCHES, 8" OF BAM 26 SY 45.00 1170.00
3. P.C.C. SIDEWALK. REMOVAL AND
REPLACEMENT, 5" 192 SF 3.25 624.00
4. BITUMINOUS SURFACE, CL. I , 2" 26 SY 8.00 208.00
5. TRENCH BACKFILL 95 TN 15.00 1425.00
6. FRAME AND GRATE 1 EA 175.00 175.00
7. 4' I .D. PRECAST MANHOLE 1 EA 1750.00 1750.00
REMOVE EXISTING P.V.C. PIPE
AND PLUG END 30 LF 6.00 180.00
9. 8" P.V.C. PERFORATED PIPE SURROUNDED
WITH WASHED STONE AND ALL WRAPPED
WITH GEOFABRIC 30 LF 30.00 900.00
TOTAL PROPOSAL 8932.00
GLUTH BROS. CONSTRUCTION. INC.
i ii/./_- /___�►
RANK GLU ' , PRESIDE ,
OCTOBER 15. 1990
SCC
_ILLINOIS 1011f4 a
_ = Ai)
J
HYDR4ULIC :;f ; ;:,�
CONSTRUCTION COMPANY•P..O.BOX 545•ELGIN,IL. 60121•PH.312-742-1516
U ITY OF ELGIN
ENGINEERING DEPT.
October 17, 1990
Mr. Ralph L. Ridley
City of Elgin
150 Dexter Court
Elgin IL 60120
Subject: ECC Fountain Square Plaza
Storm Sewer Installation
Dear Ralph:
We are pleased to submit a price of $16.800.00 for new
storm sewer work on DuPage Street. All items are in
accordance with plans dated October 10, 1990 as prepared
by the City of Elgin.
We exclude railroad flagmen and railroad insurance.
If you have any questions, please call me at the above
number.
Respectfully submitted,
ILLINOIS HYDRAULIC CONSTRUCTION CO.
eL % e _
Chuck O'Connor
Underground Supervisor
CO/cl