HomeMy WebLinkAbout89-1011 Midwest Consulting Engineers r
C:LE,e IL f V
AGREEMENT FOR CONSULTANT'S SERVICES
between
THE CITY OF
ELGIN, ILLINOIS
KANE COUN'T'Y
and
MIDWEST CONSULTING ENGINEERS, INC.
5151 North Harlem Avenue
Chicago, Illinois 60656
PROJECT DESCRIPTION
The replacement of the Wing Park Bridges over Tyler Creek located in
Elgin, Illinois.
AGREEMENT FOR CONSULTANT SERVICES
for
Replacement of Wing Park Bridges
over Tyler Creek
Elgin, Illinois
THIS AGREEIT, entered into this Ij day ofd, 1989, by and
between the City, hereinafter referred to as the City, and MIDWEST CONSULTING
ENGINEERS, INC. , a firm of consulting engineers whose address is 5151 N.
Harlem Avenue, Chicago, Illinois 60656, hereinafter referred to as the
CONSULTANT.
WHEREAS, the City proposes to engage the CONSULTANT to render profes-
sional services in connection with the proposed improvement: The replacement
of the Wing Park Bridges over Tyler Creek, hereinafter referred to as the
PROJECT.
This AGREEMENT contains all the terms and conditions of the agreement
between the CITY and the CONSULTANT and any changes in this AGREEMENT shall
have no effect unless they are made in writing, signed by both parties, and
incorporated as an amendment to this AGREEMENT. No other written or oral
understandings, representations or agreements, other than those herein, have
been made by and between the parties hereto.
In consideration or these premises, the parties hereto agree as set forth
in the following pages numbered 1 thru 10 inclusive.
Executed by the City of Elgin, State of Illinois, acting by and through
its City Council.
ATTEST:
CITY CLERK ►• ► muff
ff
Executed by MIDWEST CONSULTING ENGINEERS, INC.
ATTEST:
NMA/41)144"--1-"--°L
SECRETARY PRESIDENT
rtE037/6 -1-
Wing Park Bridge
Replacements
CERTIFICATION OF THE CONSULTANT
I hereby certify that I am the President and duly authorized representative of
the firm of MIDWEST CONSULTING ENGINEERS, INC. whose address is 5151 North
Harlem Avenue, Chicago, Illinois 60656, and that neither I nor the above firm
I herein represent has:
(a) Employed or retained for a commission, percentage, brokerage,
contingent fee or other considerations, any tirm or person (other
than a bona fide employee working solely for me or the above consul-
tant) to solicit or secure this contract;
(b) Agreed, as an express or implied condition for obtaining this
contract, to employ or retain the services of any tirm or person in
connection with carrying out the contract; or
(c) Paid, or agreed to pay, to any firm, organization or person (other
than a bona fide employee working solely for me or the above consul-
tant) any fee, contribution, donation or consideration of any kind,
or in connection with, procuring carrying out the contract; except
as herein expressly stated (if any) :
I acknowledge that this certificate is furnished to the CITY OF ELGIN,
Illinois in connection with this contract and is subject to applicable State
and Federal Laws, both criminal and civil.
DATE 477)1°/CY )441404-
PRESIDENT
NE037/6 -2-
Wing Park Bridge
Replacement
CERTIFICATE OF THE CITY
I hereby certify that I am the CITY ENGINEER of The City of Elgin, State of
Illinois, and that the CONSULTANT, MIDWEST CONSULTING ENGINEERS, INC., or
their representative, has not been required directly or indirectly as an
express or implied condition in connection with obtaining or carrying out this
AGREEMENT to:
(a) Employ or retain, or agreed to employ or retain, any firm or person;
or
(b) Pay or agree to pay, to any firm, person or organization any fee,
contribution, donation or consideration of any kind; except as
herein expressly stated (if any) .
I acknowledge that this certificate is furnished in connection with this
AGREEMENT and is subject to applicable State and Federal Laws both criminal
and civil.
DATE
CITY ENGINEER
CITY OF ELGIN
MCE037/6 -3-
DELETION AND AMENDMENTS TO THE ILLINOIS DEPARTMENT OF TRANSPORTATION'S
STANDARD AGREEMENT PROVISIONS FOR CONSULTANT SERVICES, DATED 1977
1. Incorporation by Reference
The Illinois Department of Transportation's "Standard Agreement Provi-
sions for Consultant Services", dated 1977 hereinafter referred to as the
"STANDARD PROVISIONS", are incorporated and made a part of the AGREEMENT
except as deleted or amended hereinafter. (STANDARD PROVISIONS' section
references are shown in parenthesis) :
1.1(SP 1) Definitions pertaining to the project shall be as set forth
in Section 1 of the STANDARD PROVISIONS, amended to add the
following:
1.11 (SP 1.18) Wherever the word DEPARTMENT is used, it shall
be construed to mean the CITY OF ELGIN, except the word DEPART-
MENT shall also include the Illinois Department of Transporta-
tion in Sections 1.0, 2.24 and 2.32 of the said STANDARD
,PROVISIONS.
1.12(SP; 1.20) Wherever the term Director is used, it shall be construed
to mean The Director of Public Works of The City of Elgin,
'Illinois who is in charge of the work under the AGREEMENT.
1.2 (SP 2.41) The CONSULTANT shall invoice the CITY, not the Liaison
Engineer as provided in Section 2.41 of the STANDARD PROVISIONS, in
a format mutually agreed to by the CITY and the CONSULTANT.
MCE037/6 -4-
2. Scope of Work
2.10 Phase II Engineering
The CONSULTANT shall complete the tollowing work:
1. Bring U.S.G.S. benchmark to site, run level circuit.
2. Perform topographic survey and cross sections at each bridge
location.
3. Perform stream survey consisting of stream cross sections and
profiles for each bridge.
4. Measure water way openings of each bridge.
5. Perform hydraulic study of channel at each bridge location.
6. Develop permit correspondence for Corps of Engineers permits,
utilities and 1DOT Division of Water Resources Permits.
7. ; Meet with client concerning hydraulic study and recommended
bridge structures.
8. ' Retain a subconsultant to provide soil borings for each
abutment location (see attached subconsultant proposal) .
9. Develop final plans, specifications and estimates for both
bridges (see attached location map) .
Current funding will not allow construction of both bridges
concurrently. Additionally, the City has indicated a desire to
replace Bridge B prior to June 1, 1990.
MCE037/6 -5-
As a result of these concerns, two sets of contract plans will
be developed as follows:
Bridge A is expected to consist of the tollowing plan sheets:
- General Plan and Elevation
- Abutments and Wingwalls
- Superstructure
- Railings
- General Approach Plan and Elevations
- Cross Sections
- Miscellaneous Details
Total 7 sheets
Bridge B is expected to consist of the tollawing plan sheets:
- General Plan and Elevation
- Abutments and Wingwalls
- Superstructure
- Miscellaneous Details
- Cross Sections
Total 5 sheets
10. Develop rernuirect special provisions for the contract.
11. Develop final estimate of cost.
MrE037/6 -6-
12. Develop bid documents which are expected to consist of the
following:
- Bid Notice
- Bid Proposal Forms
- Special Provisions
- Contract
- Contract Bond
13. Assist the City in the bidding process.
14. Attend the bid opening and prepare a recommendation for award
of a contract.
15. Prepare construction contracts for submission to the City and
Contractor.
Consultant will prepare contract plans in accordance with Section 6 of the
STANDARD PROVISIONS, except as modified below:
2.11 (SP 2.31b) Delete the words "or wrongful".
2.12 (SP 6.42) The CONSULTANT not the DEPARTMENT shall pertorm and furnish all
work under this item.
2.13 (SP 6.46) This Section is modified to read the CONSULTANT will enter unit
prices and accumulate costs.
MCE0.37/6 -7-
2.14 The CONSULTANT shall furnish the CITY the following documents and plans.
Copies will be provided as needed:
A. Final contract plans: 36" x 22" Mylar Reproducibles
B. Special provisions: Original typed on 8}" x 11" white bond paper
C. Estimate of Cost: Original with prices and one copy without prices
typed on form (8}" x 11")
D. Upon 50% completion of the final design, the CONSULTANT shall
reevaluate his preliminary construction cost estimate. Any varia-
tion in the estimate shall be reported to the CITY for appropriate
action.
3. The CITY agrees to furnish the following items:
A. All presently available survey data and information including
standard details and standard specifications adopted by the CITY and
other available data useful to the work being done by the CONSUL-
TANT.
r E037/6 -8-
4. Project Schedule
The CONSULTANT shall commence work on Phase II within five (5) calendar
days after date ot authority to proceed. The work will be completed and
delivered to the CITY within the following period:
Bridge A Bridge B
Completion Completion
Activity Date Date
Notice To Proceed, Data Collection 09/29/89 09/29/89
Complete Field Survey 10/20/89 10/20/89
Complete Hydraulic Study, Meet
with City 11/10/89 11/10/89
Complete Preliminary Plans 12/15/89 11/24/89
Complete Pre-Final PS&E
(Submit for Agency Review) 01/12/90 12/08/89
Complete Final PS&E 02/09/90 12/29/89
Advertise For Bids 03/02/90 01/05/90
5. Prime Compensation
5.1 Phase II - Design and Preparation of Contract Plans
Subject to an Upper Limit of Compensation the CONSULTANT shall
receive $29,684.00 as full payment for completing the Phase II work
required of him under this AGREEMENT, which includes reimbursement
of his eligible actual costs in accordance with Section 2.45 of the
STANDARD PROVISIONS, plus a Fixed Amount of $2,884.00. For services
rendered by any subconsultant retained by the CONSULTANT, the
CONSULTANT will be reimbursed for the actual amount invoiced to the
CONSULTANT. Any such subcontracted tees are included in the Upper
Limit of Compensation. The attached Exhibit A, B, and C are to be
used as set forth in Section 2.42 of the Standard Provisions.
Invoices shall be prepared in accordance with Section 2.41.
MCE037/6 -9-
5.2 Phase III
The fee for Phase III work shall be negotiated after the CITY'S
approval of Phase II Engineering.
5.3 The Prime Compensation may be increased or decreased by subsequent
agreement between the contractual and approving parties if there is
a major change in the scope, character or complexity of the work.
The fee may be adjusted in accordance with Section 2.21 of the
STANDARD PROVISIONS if the duration of the work extends more than
six (6) months beyond the date of completion stated in Section 4 ot
this AGREEMENT due to no fault of the CONSULTANT.
5.4 In the event the CONSULTANT, upon written order from the CITY, is
required to perform extra work he shall, in addition to the Prime
Canpensation, receive payment for such extra work on the following
basis: The CONSULTANT'S actual costs will be reimbursed in the same
manner as set forth in Section 5.1, plus a negotiated fixed amount
based on the estimated cost of the work, subject to a pre-agreed
Upper Limit ot Canpensation for each item of work.
5.5 Retainage - No Retainage will be required on this contract.
MCE037/6 -10-
-..--"
. ...„-- -
.
//,
\
' 7
0 t ,
, .
.01
p ( ) 0
u 0 kl ,to, d • S ‘‘• .300
'0
4 . I
.
' Or
. \ ,
, 1
72 '
\ 3, ( N• ds/2// 4
) /
EXHIBIT A
HOURLY
RATE RANGE
CONSULTANT'S
REGULAR STAFF
CLASSIFICATION FROM TO
Principal Engineer $25.00 $35.00
Project Manager 18.50 30.00
Resident Engineer 11.50 21.50
Structural Engineer 15.00 27.00
•
Survey Chief , . 11.00 17.50
Senior Project Engineer 16.00 25.00
Project Engineer 14.00 21.00
Design Engineer 11.00 16.50
Construction Engineer 11.00 18.50
Technician/Survey & Construction 7.00 14.50
Senior Draftsman/Technician 11.00 17.00
Drafter6.00 13.50
Clerical/Word Processor 6.00 15.00
`'
•
Source: SEFC
Date: February 1, 1988
SEFC/11
•
EXHIBIT B
PAYROLL BURDEN & FRINGE COSTS
% of Direct
Productive
Payroll
Federal Insurance Contributions Act 9.96
State Unemployment Compensation 3.71
Federal Unemployment Compensation 0.70
Workmen's Compensation Insurance 0.80
Paid Holidays, Vacation, Sick Leave 13.75
Bonus and Incentive Payments 7.62
Qualified Deferred Retirement Benefits 10.38
Gkoup.Insurance 7.57
TOTAL PAYROLL BURDEN & FRINGE COSTS 54.49%
• S
• i -
\ i •
•
{ f
r 1•
, SEFC/13
ST/0314S '
1
f �
%09'08 0V310118A0 7V101
96'0 sash leg40
ZO'T SuoT zrabl aeboTdW3
95'9 wea a'T33O
ECT aouvuequTew pus seT4TIT4.0
. (TT3old
8Z'T �
pue:T o u 3 ) 'SuoT4e5TT9nd 'sena 'saSU ' 's-ad
Z Z•o; *•'asuacbq •1 es-ucr Teuo?42onpa Puu 5uTu rely
8L'O. esu dxa uopeoorea pue burps •
Lb'T ahgpsod pue euo(jd9Ta►L
£L'OT sesuadxd
43P74uo3-e pee sseuTsng 'TaneaL sealtotdata, )
£8'T . buTpimoow
pee Tsbel btrcpnpouT saoTnias TeuoTssa;oad
OL'0 butssaooard equa '
08'Z saTiddna eoT33O
•
17S•T SpsoO bu} ui1d pile uar4onpozdaaa
OZ'LE ... .uorpeonpg Teuorsse;oad We 'emTs ;3124S eTgeu5TSse40
'sem 'suoT•peT406aN 's4oear4uo0 'arabuessayi
• 'T?T Tepaa0es 'anr1eZI STUTU1P 1 - saT.SI S 431"P'ur
Z0'P uorpeToazdea,
69'L waded a-men y
pue A4TTTgeTT 'IuaPTooe burpnTouT 'aoueansui sseuTsng
ZT'0 sexey emooul eTe4S
TToulied
anr. npaad
4-' Ta ;o %
SISQr 1.02HIQMI Hm1d QE+'.3F383A0
0 SISDD
A: s:,,,...e....:7 : s5:.4 - s!....DE 'S ", ,: : ::: "- i",', :,E;
)
GC.C1C,: tOS63 : ;366 : V3OZ ! '91.63: : 06E C;(... G. uat .::r1N101.
. . . t
. ,
: I t
, • . 1 . • t
• I i
. . i , • . . '
. •
. . . •
. • .
' srft
• iv thc, , .noc , :!.., , UGo d. L'il:. C.Ctl I Ci. P.a0a>.... i sSLI.,c6 „os,,
: . .. . .,
... ,.
: . LCi Di Di:C. . D.. C/C C:• U. E'...Z.C..:..:,: ..:4.:5.....S...0: s .
,
, r
. , ,c , , , : 99i
9-6.8 Si : l'St : ;CZ : 3: .
.... , . , .
3;6 :”s..,- . ,,,..
•., , , ' Z',Z1i,Z ' .4:•;,-.. ' 32,, : , ...- gp..;
..,. , . . .
C. 3; .96t ' 9. i: . .t,6 : s. ,,;; ,
I . . .
. . , S;;;LG
1 1
vb,,,.
. :: 0.1.. 1 itA, uk,21, . ' ;38 . .CD • YI t A:n:,s, .7.i.iniJpAil!
. . -,-
.
. .
wb , 0 cg. ' Z7 I .G : Z . s!,:...:scic, s
u .nspaw
: ... .:,. ,
.... -, ,:. 3; ' MP. : L SE:•;:, S :ed01.
1 .
. .
• . • ' f-• ' ' % ' ' % I ' ' I i,v% 1 f.0, I /4, I •
VI, C.,, ,1", %zi 1 'UI , ‘,// , kar
.E...S :
•
......;-„: 7::. c: ! CE: let, I,p::_-cnE; ::s...-. ' ;.,.., !„.:JApa: .: . !
V.:7.
•
.:' I.. ..::
;: i ', E--.-.... '..-:- E!.....F. ;
•
...z. ,":....::
: .
SCHLEEDE-HAMPTON ASSOCIATES, INC. • CONSULTING ENGINEERS
CIVIL • GEOTECHNICAL • CONSTRUCTION MATERIALS
1601 N.BOND STREET•SUITE 108 •NAPERVILLE, ILLINOIS 60540.312/369-0710
September 1 , 1989
RECEWED
Midwest Consulting Engineers S F P 1 1 1989
5151 North Harlem Avenue
Chicago, Illinois 60656
MIDWEST CONSULTING
Attention: Mr. Otto Hatlestad ENGINEERS, INC.
Re: Proposal for Soil Exploration and Analysis
Two Proposed Bridges over Tyler Creek
in Wing Park
Elgin, Illinois
Gentlemen:
We are pleased to submit this proposal for the performance of a soils exploration and
analysis for your bridge projects in Elgin, Illinois.
The purpose of the geotechnical exploration, testing and analysis will be to provide
information for use in planning,designing and constructing the proposed bridge. The work will be
conducted in general compliance with IDOT and City of Elgin requirements.
Scone of Work
The exploration,testing,and analysis will include:
Determination of the engineering characteristics of the subsurface materials encountered.
Determination of the type of types of foundations suitable for the support of the proposed
structure.
Provide data required for the design of suitable foundations systems and groundwater
control.
Provide recommendations regarding earthwork, including excavations, backfilling and
compaction, the treatment of in-place soils for support of pavement and other pertinent
design information.
It is proposed to explore the subsurface soil and groundwater conditions on the site by
drilling exploratory test holes.
•
SCHLEEDE-HAMPTON ASSOCIATES, INC.
CONSULTING ENGINEERS
The boring program outlined is proposed taking into consideration: the desire to obtain
sufficient information,while not expending more money than needed;and the fact that access to one
side of Bridge B will be possible with only a lightweight drill rig. Further, we are anticipating
that conditions will be favorable for founding the new bridges on a spread footing type foundation.
If conditions dictate that piles are necessary, then deeper borings will be needed to verify
subsurface conditions and allow for pile length estimates.
The basic program proposed for each bridge:
a) One(1)forty foot deep boring at one abutment and
b) One( 1)twenty-five foot deep boring at the other abutment.
If poor conditions indicate piles may be necessary, then the first boring at each bridge
will be extended up to a sixty(60) foot depth and the second will be drilled to forty(40)feet.
Method of Performance
We propose to mobilize a drill rig to the site after notice to proceed and boring layout. We
propose to provide a Field Engineer at the site during the drilling to observe the exploration,
perform field tests and measurements and prepare field reports.
Our testing program will include laboratory tests to determine the classification,
strength,water content,density,and other physical properties of the soils.
The results of the field exploration and lab tests will be used in the engineering analysis
and the formulation of our recommendations. The results of our work will be presented in a
written report, prepared by a Registered Professional Engineer. Five (5) copies of the report
will be provided.
Ega
It is proposed that our fee be determined on a unit rate basis in accordance with the items
listed below and as shown on our attached Schedule of Fees and General Conditions. The scope of
work outlined below will not be exceeded without prior discussion and authorization from the
cl ient.
SCHLEEDE-HAMPTON ASSOCIATES, INC.
CONSULTING ENGINEERS
Schedule of Services and Fees- Basic Program
L2 • 90'. 2 ! 20.)
1t.m. Estimated Quantity Unit Cost Extension
Mobilization of
Drilling Rig, Personnel
and Equipment, Lump
Sum 1 $ 250.00 $ 250.00
Additional Mobilization of
Lightweight Rig 1 $ 200.00 $ 200.00
Soil Drilling and
Sampling, including
Standard Penetration
Tests, Split.Spoon
Sampling, per
lineal foot 130 12.75 $1,657.50
Field Engineering Services as required
for supervision of drill crew, field tests,
coordination and liason:
Field Engineer,per hour 12 $ 43.00 $ 516.00
Laboratory
Moisture Contents,
ASTM D-2216, ea. 40 3.00 $ 120.00
Unconfined
Compression Tests, ea. 15 8.00 $ 120.00
Grain Size Analysis,
including hydrometer, ea. 2 40.00 $ 80.00
Atterberg Limit, ea. 2 40.00 $ 80.00
SCHLEEDE-HAMPTON ASSOCIATES, INC.
CONSULTING ENGINEERS
Engineerina-Analvsis
and Report
Engineering services required
for data review, analysis, design,
preparation of report,recommendations and consultation:
Principal Engineer,per hour 75.00
Project Engineer,per hour 55.00
Staff Engineer,per hour 43.00
Draftsman, per hour 27.50
Estimated Cost $800.00
Estimated Total — Basic Program $3.023.50
If conditions dictate piles and the deeper program is necessary, the additional drilling and field
time will increase the budget by an additional $1.536.50
Estimated TOTAL Major Program $5.360.00
Closure
Thank you for the opportunity to offer our services and we look forward to working with
you on this project. If the proposal is satisfactory, would you please execute the agreement and
return it to us for our files. We are ready to begin the project immediately after notice to
proceed.
If you have any questions concerning this proposal, please do not hesitate to call.
Very truly 'u- ,
SCHLEE 0r-, TON ASSOCIATES, INC.
ill
S •h n . Schleede, P.E.
Principal
SCS/dla
Attachments: General Conditions
Fee and Rate Schedule
SCHLEEDE-HAMPTON ASSOCIATES, INC.
CONSUL TING ENGINEERS
AGREED TO THIS DAY OF Jig
FIRM:
BY:
TITLE:
SCHLEEDE-HAMPTON ASSOCIATES, INC.
CIVIL • GEOTECHNICAL • CONSTRUCTION MATERIALS
FEE AND RATE SCHEDULE
GENERAL CONDITIONS
ENGINEERING AND ASSOCIATED SERVICES INVOICES
Fees for our services will be based upon the time worked on Progress invoices will be submitted to the client monthly
the project at the following rates: and a final bill will be submitted upon completion of the
services.Invoices will show charges for different personnel
Principal or Consulting Engineer and expense classifications. A more detailed separation of
Project Engineer or Project Geologist charges and backup data will be provided at client's
Senior Engineer,Senior Designer, o request,but each invoice is due on presentation and is past
or Senior Resident p due thirty(30)days from invoice date.Client agrees to pay a
Staff Engineer or d finance charge of 11% per month, or the maximum rate
Senior Engineering Technician i allowed by law,on past due accounts.
Draftsman or Engineering Technician rW The client's obligation to pay for the work contracted is in
Secretarial Services ! no way dependent upon the client's ability to obtain
financing,zoning,approval of governmental or regulatory
agents, or upon the client's successful completion of the
REIMBURSABLE EXPENSES project.
The following items are reimbursable to the extent of actual
expenses: WE RESERVE THE RIGHT TO SUSPEND OR TERMINATE
1. Transportation,lodging and subsistence for out of town WORK UNDER OUR AGREEMENT UPON FAILURE OF THE
travel. CLIENT TO PAY INVOICES AS DUE:
2. Long distance telephone,telegraph and cable charges. INSURANCE
3. Special mailings and shipping charges. We maintain Workman's Compensation Insurance and
4. Special materials and equipment unique to the project. Employer's Liability Insurance in conformance with state
S. Automobile travel on projects. law. In addition, we maintain Comprehensive General
6. Computer charges. Liability Insurance and Automobile Liability Insurance with
bodily injury(limit$1,000,000.each occurrence,$1,000,000.
TEST BORINGS AND FIELD INVESTIGATIONS aggregate), and property damage (limit $1,000,000. each
occurrence,$1,000,000.aggregate).
On projects requiring test borings, test pits, or other Within the limits of said insurance, we agree to hold the
explorations, we may obtain the services of reputable client harmless from and against loss, damage, injury or
subcontractors to perform such work. liability arising directly from the negligent acts or omissions
of ourselves, our employees, agents, subcontractors and
their employees and agents. If the client places greater
SPECIAL RATES responsibilities upon us or requires further insurance
Per diem or other special rates can be established for coverage, we, if specifically so directed, will take out
specific projects when conditions indicate the desirability additional insurance (if procurable) to protect us, at the
of such rates. client's expense. But we shall not be responsible for
property damage from any cause, including fire and
explosion, beyond the amounts and coverage of our
INCREASES insurance.
Fee schedule increases made by our firm on an over-all
client basis will be applied to work on all projects as they LIMITATION OF PROFESSIONAL LIABILITY
become effective. At least 30 days advance notice of such The Client recognizes the inherent risks connected with
increases will be given. construction. In performing our professional services,we
will use that degree of care and skill ordinarily exercised,
under similar circumstances,by reputable members of our
ACCESS TO SITES profession practicing in the same or similar locality. No
Unless otherwise agreed, the Client will furnish us with other warranty,express or Implied,Is made or intended by
right-of-access to the site In order to conduct the planned the proposal for consulting services or by furnishing oral
exploration. We will take responsible precautions to or written reports of the findings made.It is agreed that the
minimize damage to the site due to our operations, but Client will limit any and all liability,claim for damages,cost
have not included in the fee the cost of restoration of any of defense,or expenses to be levied against us on account
damage resulting from the operations.If the Client desires, of any design defect, error, omission, or professional
we will restore any damage to the site and add the cost of negligence to a sum not to exceed$50,000.,or the amount
restoration to the fee. of our fee,whichever Is greater.
REQUIRED AFFIRMATIVE ACTION CONTRACTOR/VENDOR SUBMITTALS AND
CERTIFICATIONS
Persuant to the attached "Affirmative Action - City
Contracts" provisions the following information and
certifications are required :
A. Number of Employees S 6 r
B. If your bid is more than $10,000 And your
number of employees is 15 or more, the following
should be submitted with your bid :
1 . Completion of the attached "BIDDER' S
EMPLOYEE UTILIZATION FORM" .
2. A written statement of your Company ' s
commitment to provide equal employment
opportunity or a copy of your Company ' s
current "Affirmative Action Program" .
a . What have you done and what will you do
to recruit minority employees?
b . Do you have a training program for
minority employees?
The contractor/vendor will not discriminate against
any employee or applicant for employment because of race,
color , religion, sex , ancestry, national origin, place of
birth , age or physical handicap which would not interfere
with the efficient performance of the job in question. The
contractor/vendor will take affirmative action to comply with
the provisions of this ordinance and will require any
subcontractor to submit to the City of Elgin a written
commitment to comply to those provisions. The
contractor/vendor will distribute copies of this commitment
to all persons who participate in recruitment , screening ,
referral and selection of job applicants, prospective Job
applicants, members or prospective subcontractors.
The contractor/vendor agrees that the provisions of
Chapter 3. 12 of the Elgin Municipal Code , 1976, is hereby
incorporated by reference, as if set out verbatim .
SIGNED
lfh144;)44agti"‘"""e---------_
TITLE E SEAL
DATE---14-141?
Subscribed and sworn to before me this Z-C --. day
of"Se
SEAL
Not r Public
"OFFICIAL SEAL"
THOMAS J. HIETTER
Notary Public, State of Illinois
My Commission Expires 9/01/91
'REQUIRED CONTRACTOR CERTIFICATIONS
Persuant to the State of Illinois Public Act Na .
85-1295 the following certification must be signed .
The undersigned firm certifies that it is not
barred from bidding on this contract as a result of a
conviction for the violation of State laws prohibiting bid-
riggingcor bid-rotating .
SIGNED _
TITLE_ _19/1 SEAL
DATE___ w1 7Z
Subscribed and sworn to before me this 2-0 day
c\e_ SEAL
No - y ublic
•OFFICIAL SEAL"
THOMAS J. HIETTER
Notary Public, State of Illinois
My Commission Empires 9/01/91
i •
r
AFFIRMATIVE ACTION POLICY
Midwest Consulting Engineers, Inc. will not discriminate
against any employee or applicant for employment due to race,
religion, color, national origin, age, sex or handicap. We will
employ and develop the best people we can find, basing our
judgment on the job-related qualifications.
We will direct our employment and personnel practices toward
insuring equal opportunity for everyone. Therefore, we intend
that all matters related to recruiting, hiring, training, bene-
fits, compensation, promotion or other employee programs, and all
treatment on the job, be free of discriminatory practices.
I
•
r
BOARD OF DIRECTORS
IMIDWEST CONSULTING ENGINEERS, INC.
r
r
I
r
IL SEFC/30 -2-
AMI a a a a a a Al a a ii a JII Mt JII , 111 , 2!
• . - .. PERSONNEL
.
9. List number of employees (by classification) you have on your present payroll.
Direct
Spanish American Asian Non- Salary Range
Classification Black American Indian American Minority Total (Hourly Range)
M F M F M F M F M F M F ($)
Principal Engineer 2 2 25 .00-35.00
Project Manager 1 8 9 18. 50-32.00
Resident Engineer 8 8 14 .00-22.00
Structural
Engineer ., . 2 2 15.00-27.00
Survey Party Chief 2 2 11.00-17.50
Senior Project • •
Engineer " ` 2 218.00-28.00
Project Engineer 5 5 14 .00-20.00
Design Engineer/
Senior Technician 2 4 6 11 .00-16.50
Construction
Engineer 4 4 12.00-18. 50
Technician/Survey
& Construction 1 9 10 7 .00-14 .50
Senior Draftsman/ . -
Technician 1 1 2 11 .00-17.00
Drafters 1 2 1 2 4 2 5.75-12.00
Clerical/Word
Processors 3 3 6 .00-15.00
j Totals 1 4 3 48 5 56 5
(Final total must agree with total firm personnel on page #4 . )
SEFC/38
mos
BRIDGE CONDITION REPORT
BRIDGE A
BRIDGE B
WING PARK
ELGIN, ILLINOIS
Prepared For: City of Elgin
Prepared By: Midwest Consulting Engineers, Inc.
5151 North Harlem Avenue •
Chicago, Illinois 60656
TABLE OF CONTENTS
BRIDGE A
ITEM PAGE
Description of Bridge 1
Existing Bridge Condition 2
Recommendations 3
Description of Proposed Structure 3
Cost Data Table 4
APPENDIX A - PHOTO LOG 5 thru 9
APPENDIX B - SKETCHES 10 thru 15
BRIDGE B
Description of Bridge 16
Existing Bridge Condition 17
Recommendations 18
Description of Proposed Structure 18
Cost Data Table 19
APPENDIX A - PHOTO LOG 20 thru 25
APPENDIX B - SKETCHES 26 thru 32
OJH-07
Bridge A over Tyler Creek
Wing Park
• Elgin, Illinois
Bridge Description
Bridge A provides park or city vehicles access to the Wing Park
swimming pool. The date of bridge construction is not known. It
is estimated that the bridge is 50 to 60 years old and was most
likely designed for a live load less than the current HS-20
design live load. The abutments and wingwalls are concrete with
• spread footings on an apparent rock surface. The superstructure
is a 6" reinforced concrete slab supported by cast-in-place, 24"
deep reinforced concrete beams. The structure is one span,
42 ' -8" long, with a 19 ' -4i " clear roadway width and a 4 ' -7" clear
width sidewalk on each side of the structure. The total width of
the structure is 32 ' -0" .
• OJH-07 -1-
Existing Bridge Condition
11.1 Abutments
The west abutment is in good condition. The northwest and
• southwest wings each have open cracks and the northwest wing has
an open construction joint. See Figure 3 .
The east abutment is in generally good condition, however, a
poorly built construction joint is located near the bottom of the
abutment. The northeast wing has separated from the main abut-
ment. No reinforcing steel was found in the wingwall. See
q i Figure 4 and photographs 7 and 8 .
Beams
The concrete beams are in fair condition. The original con-
struction was of very poor quality with honeycombed concrete and
no cover over some steel stirrup bars. Some longitudinal open
cracks located 2" from the bottom of the beam were found in
several locations. See Figure 2 and photographs 5 and 6 .
• Concrete Slab
The concrete slab is in poor condition. The quality of the
• original construction was poor with numerous lateral bars exposed
on the bottom of the slab due to little or no concrete cover.
Some cracks with leaching deposits were located on the bottom of
the slab. See Figure 2 . Lateral cracks were also found on the
• top of the slab. The sidewalk slab is in very poor condition
with a li " deep spall located along the entire length of the
north walk and in certain locations on the south walk.
Steel Railing
The railing along the north walk is securely fastened, has some
rust spots, but is not plumb. The railing along the south walk
is loose at the east end of the bridge.
• OJH-07 -2-
Recommendations
�* Due to the deterioration of certain areas of the bridge, poor
quality original construction, the apparent lack of reinforcing
steel in the abutment and wingwall and the age of the bridge, we
recommend that the structure be completely removed and replaced
with a new structure. We recommend replacement with a precast
prestressed concrete deck beam bridge bearing on concrete abut-
ments. See Figures 5 and 6 .
Description of Proposed Structure
The recommended structure would have a single span length of 40
feet, a roadway width of 22 feet and a 5 foot wide sidewalk on
each side for a total width of approximately 36 feet. The
structure would be built to a 15 degree skew to keep it on the
same alignment as the present structure. It should be designed
for HS-20 loading.
q•
The superstructure would be 21 inch deep prestressed concrete
deck beams protected with a waterproofing membrane system and
+w overlayed with a 2 inch thick bituminous concrete overlay. The
sidewalk and parapet would be cast-in-place concrete construction
(See Figure 5) . The proposed superstructure depth is 6"
shallower than the existing structure and will therefore increase
the waterway opening. A hydraulic study should be performed
prior to beginning final design.
The substructure would be a cast-in-place reinforced concrete
abutment with concrete wingwalls. The concrete footings would
bear on an apparent bedrock surface below the streambed. Two
foundation borings should be taken prior to final design. (See
Figure 6 for proposed abutment details) .
The preliminary estimated cost of constructing the recommended
structure is $123 , 000 .
Steel Beam Alternate
Also studied was a rolled steel beam span with a 7} inch thick
concrete slab. The substructure would be cast-in-place rein-
forced concrete similar to the prestressed concrete deck beam
alternate. The preliminary estimated cost of this alternate was
$157 ,000 .
q•
OJH-07 -3-
COST DATA TABLE
Item Cost
Removal of Existing Structure $ 10 ,000
Relocate Water Line 5 ,000
Structure Excavation 3 ,000
Rock Excavation 3 , 000
Reinforcing Steel 8 ,000
Class X Concrete 36 ,000
Prestressed Concrete Deck Beams 36 ,300
• Waterproofing Membrane System 4 , 200
Bridge Railing 6 ,720
Bridge Approach Work 10 ,000
• Bituminous Concrete Overlay 780
Preliminary Estimated Cost of Construction $123 , 000
UP
•
OJH-07 -4-
N I
1O
NO
IN
1111
APPENDIX A
N O
N I
IN
IN
N
N
Identification of Photographs
N
1. Looking west at Bridge A.
2 . Unsound concrete on the north sidewalk.
3. Looking at the south side of the bridge.
mm 4 . Looking at the east abutment and the southeast wingwall.
Note the pipe line attached to the superstructure.
5 . The underside of the concrete deck showing cracks with
leaching and a deck drain.
6 . Looking at the side of a 24 inch deep concrete beam. Note
the exposed reinforcement bars .
7 . A large break between the northeast wingwall and the east
abutment. Note the absence of reinforcement bars.
8 . An open longitudinal construction joint in the east abutment
located about one foot above the water line.
N
N
mom
N
imp
w
N
w
mm
'� OJH-07 -5-
M M
,h. ti•
F 't 't 'I 4\ i x. y�4 .i.1111
:.
.4,7.
, liroik
, „.. :
...„. .
..
., . •.. ... ,„
♦: , • 4 t FT 4
•fi ; .4,
r
' "� _
Mt
,mss i i
♦I1'SIT fr A ; k �� .., , its 14 •'�a `►'... '• K;
r , •
4 i ! I ! I 1 I I 1 I I I I I I 1 1
rir—rrircL—Almoilim- —t__,_
► _ i . 'r
, L
'..'•
•
•
'I i
jti+ fir`` 4
i
1
_` y
..
4 ' � • 1 •i u� � '
; ' .
rrrl` . e 7. •� i y
fir .t. [ .6,rte• •
A.
•
•
I ; w
{ i-''' yrs, .-0)t( , ` * :-s
.\
0111 M N MI IIIII MIL 1 1 1 1 I i I 1 i 1
It
'4 S6 Ar44:-) .
I" i
i tilt*
APOor
. 4
.. - • .11011011144111404
It; .'
0
0
14
0
0
0
0
aNt
s Y-1(1°a
0
I I I I I I I z, I I I ,: I I I I I I ' I ' I I
N
42 ' - 8 "
3O'-O'� I34" 0 DECK DRAINS
r In 14)
• " AliNI 47 ir IF
Artf:vii
\ t
N- 3 6
\ cw To
`' TIGHT \\ -
\ CRACKS \ —
$'\!
•
. _ (4- \ DECK SOUNDING
\ N \ NOT GOOD
-Cr `!\ WALKWAY SOUNDED
!\ _1 2. ! POOR
ENTIRE END OF
PARAPET IS 'G ! �'
SPALLED , co '*7/' \ Vo II- 0"
" ,
s o a o a
o N
• 1 1
61 )( 4 ' SPALL in `r RAILING IS LOOSE
HAS SOME RUST SPOTS
TOP OF SLAB SURVEY
BRIDGE - A
FIGURE - I
= 1 1 I I , I . I I i. I 1 ', 11 1 ; I . A ' 1 t II I i—III - II i
N
5'-OPEN CRACK 0
SOUTH FACE ' I
Tin
, . , .
IS"- OPEN CRACK
i N. FACE OF BEAM
, , , , , , , , , • , N:\\\•14 CRACK W/LEACHING
% % 1 % 1 s
...
EXPOSED STIRRUPS lf - . _
M
IN SIDE OF BEA , , , ,
, v
, , ' , ,
,
f i
EXPOSED REBARS , ,-;—:,-----...---,.. \‘, ,
. . • • S
.• AS
DUE TO NO COVER . .
TIGHT CRACKS it
'Ili „,,....... ....0.... \
W/LEACHING DEPOSITS r- 0" 0 '` ..
In 2'-2" OPEN CRACK
SOUTH FACE
BOTTOM CRACK SURVEY
BRIDGE -A
FIGURE - 2
! ! A ! I I f l ! i ; 1 / 1 - 1 I1 1 7 1 , I
I'-4" THICK WINGWALL
COMPLETELY SEPARATED L PIPE SUPPORT W/
FROM THE ABUTMENT, NO REBAR
5' - 712" �7'4'- 0" I'- 0" 434" O.D. IRON PIPE
CONSTRUCTION JOINT
i , , , \--
J-- GOOD CONDITION --5
j--
N VERY POOR CONST. JOINT '
1
NOTE: NO EVIDENCE OF UNDERMINING SHORT LEDGE = TOP OF FOOTING
EAST ABUTMENT
BRIDGE - A
FIGURE - 3
I I I , I • I ,- i , 11 Al ; 1 ,, 1 1 1
IRON PIPE
1 5' - 0" ....
15TIGHT CRACK
/f " CONSTRUCTION
6'- 3" Le IO' - 3" ,
o
FAIR
H I_
771/
..
/ ‘,.
.,
1
GOOD 8" TIGHT CRACK
1 \ ,
CONDITION —.--1 OPEN CONST. JOINT .... , • /
132" TIGHT CRACK .
WEST ABUTMENT
BRIDGE - A
FIGURE — 4
5 3 .1(15/..7/
'V 3 `: (1 aIg CI.7 500/9U0/
• a-y GlO/.,c7a,j -c/ 9 a-4n6./.7, •-aa• r /VV.77
` � Q
ts
\ 1;1 \\
\ 1.
\lc I-121 a 4.r.".91 3' / \
\\ 007Zk \\
\\ z \\
_.........,.
\\
_ - ___ _ k - - -- -- - - '\-
//CO/4(f Gins/)(./ �_
Q J \ \
*I.-C/ ‘uy_,.SI"
lI
I PasodOd _ I l
/1(1/�� -+q p�sod a,� '
1114 , 1111 a a . 1111 a a a 11 . 1 - a - a
3 ' I "
t=o" 1, " ..!0" IL • /1 /20" a 11Iii 74( h )US C 0 Y1 t-et a overlay
Over Waree'pl.'007e/r%. Wlembl"ane Sy.174kni.
NUM.in-Jw1
rad,n5. am=rial
11111111011111111111E/11.1011111111111111 Comcfreti co a He e pa - aper
2./ H pr.e. s-tr.e.ssi?d Cot-Ice-47'e barn .
SECT/ON 4-A
II .1111111772-
/
allEz Aef,
PROPOSE/2' W/N6WALL
pRoPOSE1) A13)l/rAYNT
PROPOSED BR I 1)(,- E A
WE 6
1111
w
IP
BRIDGE B
w
411
w
14
OP
ove
Bridge B over Tyler Creek
Wing Park
Elgin, Illinois
Description of Structure
Bridge B over Tyler Creek provides pedestrians access to the Wing
Park swimming pool area. At one time it provided access for both
441
vehicles and pedestrians. Vehicles are now prevented from using
the structure. Plans are not available for the structure and the
date of construction is unknown. The concrete abutments and
in wingwalls appear to be supported on spread footings, and the
concrete pier appears to be supported on spread footings.
The superstructure consists of a 6 inch reinforced concrete slab
and 5 inch thick reinforced concrete walkway supported on 24 inch
deep reinforced cast-in-place concrete beams. The top of the
s
bridge slab is covered with a bituminous overlay.
The structure is a two span bridge, total length is 59 feet with
a total width of 32 feet. The bridge provides a 19 ' -4" clear
44 width between concrete parapets and a 4 ' -7" clear width sidewalk
between the concrete parapet and the pedestrian railing.
4411
441
444
441
OJH-07 -16-
Bridge Condition
Superstructure
Concrete Slab
The reinforced concrete slab is in poor condition. A poor
quality original construction left many bottom lateral rein-
forcing bars exposed due to improper cover. Spalls are located
•
on the bottom of the slab where the lateral bars have only a
small amount of cover. The sidewalk slab is very poor with li "
deep top surface spalls throughout much of the walkway and
numerous lateral cracks found on the bottom of the walkway slab.
See Figures 1 and 2 for locations of spalls and cracks. The
concrete parapet between the roadway and the walkway is also in
poor condition.
Concrete Beams
Triginf=t=onarr:sulitenn7hOnre= cOrrZenndcirila
of proper cover over the reinforcing steel. Open vertical web
cracks are found over the pier and also throughout the span.
Also, open longitudinal cracks located approximately 2" up from
the bottom of the beam were found on every beam.
Steel Pedestrian Railing
The steel railing is partially missing on the west side and
almost entirely missing on the east side. This loss of railing
and posts is due to unsound concrete support for the steel posts.
Substructure
South Abutment
The south abutment is in poor condition. Numerous open vertical
and longitudinal cracks were found. Hammer sounding of the
bottom of the abutment found the concrete is of very poor
quality. The southeast and southwest wingwalls are in fair
condition.
North Abutment
The north abutment is in poor condition. Numerous open cracks
were found in the abutment wall. Very poor concrete was found
just above the waterline. The northwest and northeast wingwalls
are in fair condition.
Pier
The concrete pier is in fair to good condition. An open vertical
crack is located on the south face. It appears that the stream
current is beginning to undermine the pier footing.
OJH-07 -17-
Recommendations
The superstructure is obviously beyond repair and should be
removed. Also, after a detailed inspection of both abutments, it
is recommended that they also are not salvable. A new structure
should be a one span bridge spanning from bank to bank, so
therefore, the concrete pier can also be removed.
Description of Proposed Structure
The recommended pedestrian structure would be a one span bridge
with a span length of 56 feet and a clear width of 10 feet. The
recommended design live load is 60 pounds per square foot plus a
concentrated live load of 10 , 000 pounds.
m The superstructure would be a pre-fabricated steel truss struc-
ture made of high strength self weathering steel. A proposed 5"
thick concrete slab would be supported by steel stringers and
floorbeams. This type of structure is commonly found on bike-
paths and on golf courses. See Figure 6 . This structure would
provide more waterway opening than the existing structure. A
hydraulic study should be performed prior to final design.
The substructure would be a reinforced concrete abutment with
concrete wingwalls. The concrete footing should be founded on
the apparent bedrock surface. Two foundation borings should be
obtained prior to beginning the phase two design. (See Figure 7
for proposed abutment details . )
The preliminary estimated cost of constructing the recommended
structure is $76 ,000 .
Open Abutment Structure Alternate
This alternate bridge type would have a span length of 90 feet.
The increased span length allows a smaller abutment to be
constructed and also eliminates wingwalls. However, a stream
slope protection system such as stone riprap is required.
The preliminary estimated cost of this alternate is $78 ,000 .
1411
OJH-07 -18-
COST DATA TABLE
Item Cost
Remove Existing Structure $15 ,000
Structure Excavation 3 , 800
Rock Excavation 1 ,100
Class X Concrete (Substructure) 19 ,550
Reinforcing Steel 4 , 110
Furnish and Erect Steel Truss Span 20 ,000
Superstructure Concrete 4 ,500
Epoxy Coated Reinforcing Steel 1 ,250
Porous Granular Backfill 1 ,625
Miscellaneous Approach Work 5 ,000
Preliminary Estimated Cost of Construction $76 ,000
air
OJH-07 -19-
r
Os
So
VO
Os
al
rr
0
Identification of Photographs
1. Looking west (upstream) at Bridge B.
2 . Looking south at Bridge B.
3 . West parapet and railing.
4 . Poor concrete on the south sidewalk.
5. Exposed reinforcement bar and spalls on the bottom of the 24
inch deep beam.
6 . Showing exposed reinforcement on the bottom of the slab and
a vertical crack in the beam.
7 . Exposed reinforcement in the bottom of the top slab and a
poorly made construction joint in the beam.
8 . Edge of east walkway slab.
9 . Very poor concrete at the bottom of the north abutment.
10. Very poor concrete at the bottom of the south abutment.
** OJH-07 -20-
Emil A IIIM MI =I MI MII MI MI MI =I MI =I IIMI MIMI 11111 NINE IIIE IIIII
,
. 1
I' ,
•
i 4 '
b . r 1 1 till
tr
. ,
P1'
i , _ , ,. • .... .
air- - .. ,.,.
,
, .,,t. .•
.... (4 ,
, , ,.I • •
• `s• )1 'ill I I'li,4'.' 'II INN
Idli . k .-- , •• •-
, , . . i ,I . i •
tvi •i : 'e 01 ila , - '.' .,-:. '
f * •
1' 1; ./ ::' ,,: : ,
. .
, 4
_
et , ,( 4 - .,, ,•.,.
,
. , .,..t.1 't
1,1 ft, • , Y 'A%
" ' ' I.1' 1.; . -`• 1
ILIILb
r t. • . . . . — •
. '. ., •• , •
• v .; , ,,..
I .# ,.1', il .i • , • I
/ AV•
4f . -:'•
t •'rir. 'at- „...._-,
_ ,, ,_ ,• le,.. 1 ...,
, • l e ' .
I‘•' ;),
.. I
i ,„
. / t `.
•
10111 11111 MN NE 11111 11111 IIIII 11111 NEI MIN NMI =I I= 11111 11111 IIIMI IIII1 MINI MIMI
r ,,, ,g 1 ••••,,
4, ...
A t. 4f •,,-
„II ,2 t . • ' 1 1 i‘
s , ,
4.
„ ,..,,,....„
*' •
4.. .
• '01 / - MO 4 -A\ )il., .
s. Ir
1 t'. i'' 'e •-
\
If
( - ' ' — liiYit l'Aifi-i: .' • .
; ‘ :i.,:;..11,:,.., ..;•
• r • 1 ,.,)
0::,; „ , •$44
1 II
A •
t4 1.! ) . .
.
yk' /3/4 ' I 6., ,,,,,•. , . , A,.,
61 .' - • i , :” slit
.,.
t ,
N 14 . . • ,,
• i ,,, ii i
, . • .
, . I ,ft . 4-' ;- -
* ii: r'''. _-.1,. • .1
.
i , .. r
,
... ., , • - '
r ,..
If : k .`
.1, f .
; , -, , *•4, .a, -- ,
1 A .
4i' • -- ,. . . . .. ,
.4 '5•• .:49 - . .,. ... I
..., !..i,s • . ,,, . . ...-
—• . .44
1 ili4t • ...•
„..
' i -i 'V• . • N.
, \ ,
'- lit•IT,,,1.‘ ) , 14), ' 1.
• 1 f - lAtt
. ,
,
1 :tx
• -,11-7;
, .
. . . ...,,i, .
..,, -111 •• -: , .4_, . .
. ._ ,i, . ..". t ..„ • ‘
• i 44 tI ,
1 t I:Pilibt V .
N M N I I I NM NNI NINI N N MN -- ,,EI
•
•-'
(r.%
'
s. 401
4 i & I L i i i x i s i s i . 1 t i t i a _ A
'it. ;
.,
ii., ..\, -
‘1,,,
ri
K 1
At .-
a ('
Nw 'l' y v
T Y rt.
1
k'• ..."00.'" KS1
, ,,,tip
I • . . . .
, .
4Ir
t •
.
A
• • 4k:7
. ...•..0'_ 'i ;4r.
. r
. . t
i•
r.' .•
....?
6-1
1i1
.e .,.
••
"14 .
1 7At
zi 4f4"1It,7
6,.•.
•
•
. 0.
. 1
l 4 • .1r.
• t . $
. ..
. ,
. .
S. .
.,•
,,. . •. .16. e
.
-
.
.. • ; 401111111"
A . a I...i.'"
pa
x
H.
ca
z
w
p4
a
4
11-4 I , I i I '• 1 '--' I ' I I I I -i I I I I
4. I 4: '.',
II , I I 11 -: I . 1 -.. 1 I 1 11 1 1 1 II ': 1 1 'i I '' 1 !?' ' 1
I311111110"•••-- z
1 STEEL RAILING IS MISSING
\/- 7
ra .0eiA {77/i" 0 al
01: e4
•
r
N ' SPALL ON SIDE OF PARAPET
---\ .
II
- )
,
i )
i "87ff/Av
A.
STEEL RAILING IS MISSING /
LEGEND
CO CONCRETE SURFACE
S PALL
TOP OF SLAB SURVEY
BRIDGE -13
FIGURE - I
1 - I 1 1 - 1 1 1 1 , I 1 1 - 1 -: 1 : 1 - I 1 l ! t i
SPALLS a EXPOSED
STEEL AT POSTS \ 1 MINIIImm--- z
OPEN CRACKS IN WEB
5 - OPEN CRACKS ,7' OPEN CRACK
EQUALLY SPACED p
.i
\i
h
,;1 } 1 i , 1 it ! ! li
I I 1 , , 1 . 1 11 1 • , i ,
1 i 1 1 1 1 1 i i 1 i 1 i1 Nt 1 I
CONCRETE 1 : 1 ; ; ; ; ; ; .'
1 • • I- I 1 . 1 1 !`•••• I
dilliMia
i • I , I t i I • I I , i • S ,. . ;
.. I I I 1 I I I 1 a I , , , 1 I I N.I I 'ah:-. , I
t ( 1 1 I I , 5 t ', , 1(��1 ,� i I
1 1 1 1 1 1 1 I ► 1 1 1 1 1 - II �,^1 I, 1 Io 1 I
i i i i 1 1 t i 1 I i t ,: a _) aI % 1
I I i 1 a a • I . 1
1 SPALLS DUE TO tea, i s *) "
N LACK OF COVER ; 1 ; I " + i -
} y/ , I 1 I I 1� ,
1 i v 1 / 1 i I I 1 i L i 1
1 110 . • I
1 1 i 1 1 1 T • r I , • . I / • �. I t
1 1 I I I I I • 1 1 , 1 I • 1 1 1 1 6 i 1 ,
l 1 /
\� r5;X€3"
IN( 3 1 -,:. 1 ,---/-
3i-6"X5" - 1
• o
,i
OPEN CRACKS IN BEAM WEBStt
AT APPROX. 30H CTS. THROUGH 4' OPEN CRACK
ENTIRE BEAM. LEGEND
q7/4) CONCRETE SURFACE
SPALL
OPEN CRACK
TIGHT CRACK
BOTTOM CRACK SURVEY REBAR EXPOSED
HONEYCOMBED CONCRETE
•.:;t GOUGES
i
BRIDGE - B
FIGURE — 2
18"OPEN CRACK
OPEN CRACK
TIGHT
CRACKS SOUNDS GOOD
11,- i4„ 28,_O ' ± I I' - ?„
\ 11111111 1111 I I I I WAWA r /
I VERY POOR CONCRETE NOTE:
RECOMMEND ABUTMENT REMOVAL,
BASED ON CONCRETE HAMMER
SOUNDINGS ABOVE THE GROUND LINE.
SOUNDED WITH HAMMER/
NOT BAD
SOUTH ABUTMENT
BRIDGE - B
FIGURE - 3
t
♦1
OPEN CRACK 0
icy
N
STREAM IS TRYING TO
UNDERMINE FOOTING ON THE
NORTH SIDE
SIE CONDITION OF PIER
IS FROM FAIR TO GOOD
PIER
(LOOKING NORTH)
BRIDGE - B
FIGURE - 4
If 1 1 I 1 1 1 1 1 ,11 1 - 1 1 1 II 1 U ,r"I
6'- OPEN CRACK
STONE WALL TIGHT CRACKS
0010410
•Akcela 1 ) ! .
I.s� Ii II - 9 28 -0 # II - 6
"%In 1 V. / .
11('..(4)„4,4\_.._______j -
Wi 0 2I
1 N
0
POOR CONC. --"'"Ir a
, �5,-61,
SOUNDED W/HAMMER / APPROX. 5" DEEP LOSS OF
CONDITION IS POOR CONCRETE , AND REMAINING
CONCRETE IS VERY POOR
NORTH ABUTMENT
BRIDGE - B
FIGURE - 5
I
fo----1
\ Propose ci s 711--Lic... tu r--,e_—
L —,
--I-
I
I 601-0° I 4
0 ---4 Ir 7 Appr-oa cA timber ft)arJ I • s
— — ' - • 11 rad, typ.
II
1 _
/ .
4
I
f 11) I 6
[ — — -- — '-
I
I
PLAN .. z—
peed esiriavi 4)--,d,-.Q -
e- -. -
I
1 T-- i 1 -1- I r 1,.
See. 749:u r, 7 fo, 5 tc- A- A.
lil i 1
1 i 1 1
I
I
L_____ _ ...______ _ _____i i____ _____ —
I L—:.1 .::::=1 .
II 111
.ELEVA-T/ON
it0 O5 EL) BR
I I I I 1 1I 1 I I - 1 te-11
CtrOC 74U r a / tube , 75v. 141 A r/- ,,I
ather st-e /.
inLo" dear
I -
Cc") cee-/e
5C7/ON /1-11-
t4
0.7
• • 11=111 r-P7'71- t
j
• .1
AB(JriviENr 1)ETA,1 W/A.1GWALL
PROPaSED SRI IX;E.
Fla E 7
4
BRIDGE CONDITION REPORT
NATIONAL STREET BRIDGE
ELGIN, ILLINOIS
July, 1989
ewe
owe
owe
Prepared For: City of Elgin
Prepared By: Midwest Consulting Engineers, Inco
5151 North Harlem Avenue
Chicago, Illinois 60656
TABLE OF CONTENTS
ITEM PAGE
Bridge Description 1
Past Maintenance and Repair 1
Existing Bridge Condition 2 , 3
Recommendations for Repair and Maintenance 4 , 5
Alternative Bridge Deck Overlay System 5
Longitudinal Joint Closure 6
Cost Data Table 7
APPENDIX A
Identification of Photographs 8
Photographs 9-17
e� APPENDIX B
FIGURE 1 18
FIGURE 2 19
FIGURE 3 20
FIGURE 4 21
wr FIGURE 5 22
FIGURE 6 23
FIGURE 7 24
FIGURE 8 25
FIGURE 9 26
FIGURE 10 27
APPENDIX C
BRIDGE DECK CORE REPORT
IN OJH-06 -i-
National Street over Fox River
Elgin, Illinois
Bridge Description
Structure No. 045-6304 carries National Street over the Fox River
in Elgin, Illinois. The bridge was constructed in 1948 . The
substructure consists of reinforced concrete abutments supported
on timber piles and reinforced concrete piers supported on timber
piles. The superstructure consists of a 6" thick reinforced
concrete deck slab supported by cast-in-place reinforced con-
s' crete, haunched girders. The concrete deck is overlayed with an
approximately 1i" thick bituminous concrete overlay. The bridge
is a four span structure that carries one traffic lane in each
direction and also has a parking lane on each side of the struc-
ture. There also are 9 ' wide sidewalks on each side of the
structure. The bridge is not posted. See Figure 1 for structure
dimensions.
Past Maintenance and Repair
In 1974, the following maintenance or repair items were done on
the bridge.
1 . Concrete slab partial depth and full depth repair.
2. Application of waterproofing membrane system to the top of
deck.
3 . Overlay of the deck with 1k " bituminous concrete surface
course.
4 . Installation of a neoprene expansion joint at both abut-
" ments.
5 . Sidewalk repair.
6 . Cleaning and painting steel bearings.
OJH-06 -1-
Existing Bridge Condition
�* Abutments
West Abutment
The west abutment is in good condition. Three areas with spalls
were located during the inspection. Bird droppings have accu-
mulated on top of the beam seat. The southwest wingwall is in
fair condition. A concrete spall was found along the entire
length of the original top of wall. Numerous hairline cracks
were also found. The northwest wingwall is in good condition.
East Abutment
The concrete abutment is in generally fair to good condition.
See Figure 8 for the location of two large deteriorated concrete
areas. Some open cracks were found in the abutment backwall.
Dirt has accumulated on the beam seat. Both wingwalls are in
good condition. A concrete spall is located at the end of the
southeast wingwall.
Piers
Pier 1 , 2 & 3
Piers 1 , 2 and 3 are in good condition. A full height 1/8"
vertical crack was found at each pier and is located 5 ft± south
of the centerline of bridge on each pier. This crack is appa-
rently a concrete shrinkage crack and is a full depth crack.
Bird droppings have accumulated on the top of each pier. No
evidence of streambed scour was found during the inspection.
Concrete Deck
Visual inspection from below and inspection of four deck cores
indicates that the concrete deck is in fair condition. The
bottom of the concrete sidewalk support slab shows evidence of
leaching through the slab. The top of the concrete sidewalk has
approximately 20 percent either spalled areas or old concrete
patch areas. See Figures 3 and 4 for the spall areas and also
for locations of open cracks and tight cracks in the sidewalk.
The traffic curb edge of the concrete sidewalk has numerous
spalls with reinforcement bars exposed. The roadway support slab _
shows no evidence of leaching completely through the deck. An
estimated 1% of the slab will require full depth repair and
approximately 15% of the area will require partial depth repair.
See Appendix C for the concrete core data and report. Concrete
cores Cl and C were intentionally taken in deck surface
distressd areas.6 A 1/2" wide open longitudinal joint runs the
entire length of the structure. A previous attempt to overlay
this joint with bituminous concrete was not successful.
OJH-06 -2-
xim
Girders
.. The reinforced concrete girders are generally in good condition.
At the abutment expansion bearings the bottom, back corner of the
beam has cracked and in some cases fallen off. See Figure 10 .
On some girders, the concrete in front of the steel embedded
plate has also spalled off. No repair on the end of beams will
be required at this time.
Bituminous Wearing Surface
The approximately 1k " thick bituminous wearing surface is in poor
condition with numerous lateral and longitudinal cracks.
The wearing surface in the traveled lanes is in poorer condition
than the wearing surface in the parking lanes .
Bridge Approach Pavement
The west approach concrete pavement and bituminous overlay is in
very poor condition. Numerous potholes occur in the area adja-
cent to the railroad track and are less numerous towards the west
abutment. The bituminous wearing surface is missing in some
areas. See Figure 2 and photograph 2 for an indication of the
condition of the approach pavement. Surface water ponding occurs
at both the northwest and southwest corner of the bridge due to
the absence of stormwater inlets.
The east approach concrete pavement is in good condition. The
east end of the bridge approach pavement has recently been
reconstructed. See photo 9 .
Bridge Railing
The iron bridge railing is in good condition. Rust areas occur
on the bottom railing and near the bottom of the post.
Expansion Joints
w The joints at each abutment were reconstructed in 1974 and are in
fair to good condition. The type of joint is the WABO SR 2A.
Drainage
The bridge deck is drained by curb drains located at about 15 '
centers. The drains provide an opening of 6" x 3" and allow the
stormwater or snow melt to drop directly into the Fox River. The
metal drains are very rusty. Storm water inlets are located on
the east approach pavement, however, none are located on the west
approach pavement.
OJH-06 -3-
Recommendations for Repair and Maintenance
Abutments and Wingwalls
1 . Repair deteriorated concrete with formed concrete repair or
pneumatically applied mortar.
2 . Repair open cracks with epoxy crack repair.
3 . Blast clean the bridge seat and apply sealer.
Piers
opo
1 . Blast clean the top of pier and apply sealer.
Steel Bearings
1 . Blast clean and paint all steel bearings .
Concrete Deck and Sidewalk
1 . Remove the bituminous wearing surface on the deck.
2. Scarify the deck to a depth of k" .
3 . Repair the concrete slab with partial depth and full depth
repair.
4 . Overlay the scarified slab with a 1 3/4" bridge deck con-
'. crete overlay.
5 . Remove the entire top portion of the concrete sidewalk to a
depth of 1i " and replace it with a 1k " concrete overlay.
' 6 . Deteriorated concrete located at the curb/sidewalk interface
will be repaired with the sidewalk repair operations.
Iron Bridge Railing
1 . Blast clean and paint the iron railing.
Expansion Joint
1 . Remove the existing expansion joint at both abutments and
replace them with a neoprene expansion joint.
Bridge Approach Pavement
1 . Remove and reconstruct the concrete slab from the railroad
.� track to 30 ft. west of the west abutment. (See Figure 9)
2 . Remove the bituminous overlay on the remainder of the west
approach pavement.
OJH-06 -4-
3 . Overlay the entire west approach slab with a bituminous
overlay.
4 . Remove and replace the bituminous overlay on a 10 ft. wide
strip adjacent to the east abutment.
ow
Drainage
1 . Construct storm water catch basins with outlet pipes at the
northwest and southwest corner of the bridge.
Alternative Bridge Deck Overlay System
Two bridge deck overlay systems were considered. One system is a
2" bituminous concrete overlay over a waterproofing membrane.
This system has been widely used in the past by Villages and the
Illinois Department of Transportation. The estimated life is
approximately 10 years.
The second system is a 1 3/4" thick rigid concrete overlay over a
i" scarified bridge deck. This overlay has been used by the
Illinois Tollway for many years and is now also favored by
District 1 , IDOT over the bituminous overlay. The estimated life
is approximately 20 years. We recommend the rigid concrete
overlay for the National Street bridge.
COST DATA
WATERPROOFING MEMBRANE SYSTEM AND BITUMINOUS CONCRETE OVERLAY
Item Cost
Waterproofing Membrane System $27 , 080
Bituminous Concrete Overlay, Class I 5 ,285
Total Preliminary Estimated Cost = $32,365
w
RIGID CONCRETE OVERLAY
Item Cost
Scarification (1" ) $ 6 ,430
s Rigid Concrete Overlay 40 ,650
Total Preliminary Estimated Cost = $47 , 080
OJH-06 -5-
Longitudinal Joint Closure
The structure was constructed with a i " open longitudinal slab
joint at the centerline. Attempts to overlay across this joint
have not been successful (see photograph 16) . Under present
Illinois Department of Transportation criteria a longitudinal
separation joint is only required for a bridge wider than approx-
imately 95 feet. We recommend that this open joint be closed
with concrete . See Cost Table and detail below.
el
COST DATA
RECONSTRUCT LONGITUDINAL JOINT
Item
Cost
Concrete Removal $ 3 ,500
Class X Concrete 4 ,200
Epoxy Coated Reinforcing Steel 770
Total Preliminary Estimated Cost = $8 , 470
— C/ s. X Conce-4te
c1777.(2.te tnov /
*I
qo
2--
(///:74V
EP
L „
OW LONG/Tab/AIN. JOINT bETAIL
OJH-06 -6-
g COST DATA TABLE
Preliminary Estimated Cost of Repair and Maintenance
U
Item Cost
Bituminous Concrete Overlay Removal $ 8 ,750
Concrete Approach Pavement Removal 16 ,800
Sidewalk Slab Removal (Top 1k") 6 , 160
Concrete Repair 6 ,600
Epoxy Crack Repair 1 , 700
Deck Slab Repair (Full Depth) 4 ,000
Deck Slab Repair (Partial Depth) 28 ,500
Bridge Slab Scarification in 6 ,430
Bridge Deck Concrete Overlay, 1 3/4" 40 ,650
Concrete Sidewalk Repair 5 ,550
Bituminous Concrete Surface Course,
Mixture D, Class I, Type 2 1 ,500
Concrete Pavement, 10" 21 ,000
Neoprene Expansion Joint 24 ,800
Clean and Paint Iron Railing 10,000
Clean and Paint Steel Bearings 5 ,525
Reconstruct Longitudinal Joint 8 ,470
Catch Basins 2,000
Storm Sewer 2 , 100
Concrete Headwall 3 ,000
Bridge Seal Sealer 2,500
Traffic Control and Protection 20 ,000
Miscellaneous, Striping, Etc. 10 , 000
yes Preliminary Estimated Cost of Construction $236 ,035
■s
OJH-06 -7-
PP
MP
APPENDIX A
IP
N IP
E P
111111
Identification of Photographs
1 . Looking east at railroad tracks, the west approach pavement
and the National Street Bridge.
2. Looking at the southwest part of the west approach pavement.
3. The northwest part of the west approach pavement.
4 . Potholes in the west approach pavement.
5 . Old concrete repair areas on the south sidewalk.
6 . Concrete spalls and hairline cracks on the south sidewalk.
7 . East abutment expansion joint.
8 . Northeast corner of the bridge.
9 . Looking west at the bridge.
10. Looking southwest.
11 . East side of pier 3 .
12 . Utilities attached to the north side of the structure.
13 . Concrete spall on east abutment wall.
14 . Deteriorated concrete on the south edge of the concrete
sidewalk slab.
15. Unsound concrete and exposed reinforcement bar located at
the top of the southeast wingwall.
16 . Bituminous concrete over a in open longitudinal joint.
17 . Spalls and old repair areas on the north sidewalk.
18 . Expansion joint at the west abutment.
• OJH-06 -8-
"'I 111111 alll M1111 UN 1 N E r
O '
. ti I: '! ' I 1 i I It".! .
, 1• )' i
,i i : k [ 1
i 1 -W -7.. .:,
` •
02 ' " i .. \:.;4 . • u.
I
I
e. . _:,:, 44 __,
11
1AS/ .' 4 k ' : '
1
1, 1.‘
I I
t i i 1
f. 111 li.
. . ' . :
I
1 C
"•11 PIN al1111 PIE BIN
A I
��rI 1
f�
• i,• 1 I 1
pt • I
C. . , 1!
1+r __ `, .do.: ., ) —t 111' +�� 1 ,1:1):::
• , ,
4 11 f I ate
0
of . , . . I 0
j..
• a
•
4
e n
\ \
1
•
•
I .; A ..41.110°,.
f
1 r 1
, i .
1
si.(r). .i 0 ' ,-.•
A
I
1 .Id
1i, t 1 r it.
1,4 / (t)
1 / _. w •,i♦. •
. qtr
Q.4.41
1 ,:.. " 1
I . «�! a
i, a• . . Ifs . ;7r. II '4
—I u— I 1 I 1
y .
• ......1C1 .-- \
..
ar _ 9,,. } _
s.
I
l'411. 1- t-
w
! 9
„_.
1 ,
:, __
.,,
__ .,....
041,41
, i
. ‘ • ., .
IE
III
11 P - •••
• .
I 1 = 111110 I r
if _ . I
it it
, ._ .
. _
i . - .
4
.4pr i0
'Fie.
...sl.
I
I
#1
I
I
I
t , I,i 4 tu- 1 , t
I I
- T .
II
Mil
AIli
ll
.'i P
,0I II
I
I
It
I
I
f
I
`',...
'1I
I
I
I
. I
I
.. I
•
I
I
5/
I
I
•
• • I
I
I
14
. -
I 141I
c • a.P
i 1 1 1 I I I I I i I I I
\`'
X / �•�
'N,4N4Iiiiii\
t I P `' 1
Y
I.
ii ;
t.
I
1
w
• j
1111/T1117
ll•
i
I
.
A
i
r
r
r
r
r
0
0
41.
0
0
r
XzaIA3aa'
I'
0/1 .)..Zs 5SVY) .7 7T
k,.1
r
9 y_
1 ("
I 1► 11 k\
j ET. ,_...7
1 ,)_11 ‘N. /) 1 /, N.
4 j 1±---1 1--.7.1.---I ,
Lly r
Q d v-z z "�.. P
Alti i
kl 7d 031
`jC/ ig .._17211.15 7tfAOl1 VN
C01.
N
N I
-----,A I - _
lx) -'r
N
4--
-G "1
F' "aid -- j 7 -"'d , / .i "d
Q; a9 ....
-cit 49 ; SI "9 -8 .1 a— o1
II I I I Ili F4 I i I t , I 1 I I I f I p ' [ f ;
I
1
1
1
I114
I
i I b1M �
1 1 6.4'51111
Pi -ci
I cr
I
i
i ,d :y
.� ;.:fit; , \ \\
\ _ ohaf
r n a
• .T \
\ N s� fir'df
\ sr.
„w 0 tloi-P'ldf
,451 , 1 ` ,.--
Itia
0 00 le h 17
\ , $ L��
51761ri
\ \ \ VI " -rho)¢
co \ • Fu --
vRri P \ \ opo
�r
\ k \
t _iffl, . .
OP
or .
_mit:,
0
•
\ . ,
�,
� j
il
q, ►
7.o
\{`'\,
I I I
I
I i
i
I I
I I I I I
_ \f via!!
4�'9 �r
a - ----- i, � �1 �.
30 VVI l LL Y: , cpNcRJ U
g
1)V
A
Ce
:� tpmf...� cpAcx
?� �r flAG
A
NA f IN lit
L STRo
s
a
I
•
I
i
i
I
i
l
1
► s¢a-t
CONS*.
fullbZ, �lt1t'
r 122V°slj
COICL/7!1
c
ntrAt
NATI-
q.j
•'1
I
I
i
0101°111000-•*,
I
1
i
1
1
1
i
� P,t✓
S
1
& 3
i,016,5 west
D PO', cgAcr
rIGHr
sTfirci
NorioNAL
h
t
I
1
I
1
1
1
1 ► `X u,ati
� 6a
o�,�rlk
�ra�
aT v\-k--
1,n S 4,.
-II Sall ro
o
, Ya rn
" SYS ���
iviENT
tIN
EAsr A°Ijr
cgACK
Orel' f ,ACK
srfRea
✓,j���1�t7
— — i
JN3WJA Vol H0VOU&V 1 s. 1V[ ,
N ct
S44.
cla t �4597 JO POSodo.I/
II
. 2/
II
• /VA 74 so
'
N
,�aaDt-.to7 roau,iu4(2/1 N
4 II z ' \
aPir!'ig ;S- I I N
" leuoveN
I I 7 , 97 1
N I I i
N
e.
.. I
/�
I I
SEG'
V/ y3LeJ pas06111 I I I
T I ClI ,
s s 0/;?/ (asodQ,rd _ b, — .q%s -��a.r wos I
r
/ ep 44 re - 1oyA1y
y09 ip d 6,,41 s i x3 7 Pe. 0-4 1.1e.v ,---e"
4/.
0-4
SPA-Lis ATT GlITDER EXPAN5ION_ . EA RINGS.
IMP
- riK.tipr 16
OP
•
•
•
•
•
•
•
•
•
•
•
OP
•
•
ilagSa
Si is
•
•
•
ow • SCI11LEDE-HAMPTON ASSOC/MIS. INC. _
CONSULTING LNGINFFRS
MP
The cores were drilled using a thin walled diamond drill bit to a depth
�* of about one ( 1 ) inch from the bottom of the deck. The cores were broken
off at that point and retained for inspection. The core was not taken
completely through the deck so that the core sample could be retained and
the hole could be patched. All core holes were patched with concrete
Immediately after the coring operation.
Core Core Depth Material
No. Material Depth (In) Condition
C- 1 6.8 Bit. Surface Course 0.0-1.6 Good, small
amount of
air voids.
i• Seal Coat wi Pavement 1.6-1.8 Good
Fabric
PCC Bridge Deck 1.8-6.8 Good. Core
broke at top
of lower
rebar mat.
C-2 4.0 PCC Bridge Deck 0.0-40 Vertical
Crack from
depth 3.0" to
bottom of
core direct-
ly below re-
inforcing
bar
.* - SCHLFEUC-IIAM!'ToN ASSOC L4ItS, INC.
CQNSL'L!!,'YG FNGI,tiLLhS
Cone Core Deptn Material
No. (JO Matertl Depth (in) uncut=
C-3 7.0 Bit. Surface Course Good
�* Seal Coat w/Pavement 1.7-2.2 Well bonded
Fabric to PCC deck
and AC surf-
ace
PCC Bridge Deck 2.2-7.0 Horizontal
crack at
depth 2.T.
Upper 0.5" of
PCC In very
poor condi-
-
tion
C-4 3.9 PCC Bridge Deck 0.0-3.9 Poor. Hori-
zontal
cracks
throughout
core. Cored
through
Intersection
of reinf or-
ting steel.
C-5 7.0 Bit. Surface Course 0.0-2.3 Good
SealCoat w/Pavement 2.3-2.5 Good bond
Fabric PCC Surface
PCC Bridge Deck - 2.5-7,0 Good. Core
.. broke
lower rebar
mat. Rebar
'- not bonded
to PCC
— • • SCNLE£D£-HAMPTON ASSOC IA7h1, INC.
CU1v5t-if.NGtNictis
w
Core Core Deptn Material
(in ) Material Deptb (in) Condition
gin
C-6 8.3 Bit. Surface Course 0.0-2.0 Poor, Hori-
zontal and
vertical
crack thru
AC section,
Seal Coat w/Pavement 2.0-2.3 Good bond to
PCC deck
PCC Bridge Deck 2.3-8.3 Continuous
(reinforced) horizontal
crack at
"' depth 2.8".
Below 2.8"
the PCC is
intact & in
good condi-
- tion.
The core samples have been boxed and will be shipped to MCE for their
" inspection and final disposition. If further testing or evaluation of the core
samples becomes necessary, or if you have any questions regarding this
data, do not hesitate to call us. Thank you for the opportunity to be of
continuing service.
.. Very truly yours,
SCHLEEDE-HAMPTON ASSOCIATES, INC.
LCA . G -
William J. Wyzga l , P.E.
Project Engineer
WJW/dla