Loading...
HomeMy WebLinkAbout87-0708 Everett Scheflow Engineers RESOLUTION ACCEPTING THE PROPOSAL OF EVERETT SCHEFLOW ENGINEERS FOR ENGINEERING SERVICES BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that James J. Cook, City Manager, be and is hereby authorized and directed to accept the proposal on behalf of the City of Elgin of Everett Scheflow Engineers for engineering services for the Laurel Street Storm Sewer Rehabilitation, a copy of which is attached hereto and made a part hereof by reference. George VanDeVoorde, Mayor Presented: July 8, 1987 Adopted: Vote: Yeas Nays Recorded: Attest: Marie Yearman, City Clerk , June 17, 1987 MEMORANDUM TO: Mayor and Members of the City Council FROM: City Manager SUBJECT-( UBJECT• Laurel Street Storm Sew Replacement PURPOSE: This memorandum will provide the Mayor and City Council with information to consider the selection of an engineering firm for the subject program. BACKGROUND: The Laurel Street storm sewer has had problems in the past with the collection and transmittal of storm water in the area. With the realization of this, the project of replacing this facility was incorporated into the Integrated Capital Budget for 1987 under the Sewer Improvement Fund . The Enoineering Division prepared a list of qualified engineering firms, based upon their experience and qualifications in this field , and sent them an RFP. Four proposals were sent out and three were returned . A review of the three proposals by Engineering showed that Everett Scheflow Engineers is a competent engineering firm in the sewer investigation and rehabilitation field. Everett Scheflow Engineers have been involved with storm sewer projects in the past with the City of Elgin. They satisfactorily completed the plans and specifications for the Willard Avenue Detention Facility . They have also been involved with various design projects with other local communities. A check of their references gave us favorable results as to the quality of their work . FINANCIAL_ IMPACT: The Engineer ' s estimate for the professional engineering fees was $9, 100 .00. The fees for both phases of the work as proposed by Scheflow Engineers is a maximum not-to-exceed cost of $7,300.00. This cost is for their non-televised proposal for the Phase I inspection and report on the existing facilities plus complete final plans and specifications . A tabulation sheet of the fees from each RFP submitted is attached for your consideration. RECOMMENDATION: It is recommended that the City Council select the firm of Everett. Scheflow Engineers for the design of the Laurel Street Storm Sewer for a not-to-exceed amount of %7,300 .G0 . AN City pager June 17, 1987 REQUEST FOR PROPOSALS SUMMARY LAUREL STREET STORM SEWER Engineering Firm Phase I Phase II Total (Report ) (Design) Everett Scheflow $3,500.00 $3 ,800 .00 $7,300.00 Engineers ( 1 ) Hampton, Lenzini , $8,665.00 (with I ) $8,665.00 and Renwick (2) Walker Inc . ( 3) $9,300.00 $14 ,500.00 $23,800.00 ( 1 ) Phase I cost is for the non-televised proposal . (2) Proposed cost is for Phase I and Phase II . (3) Each phase proposed cost lists expenses as in addition to basic cost . ** Council is to select engineering firm at Council meeting on June 24 , 1987. 1 EVERETT SCHEFLOW ENGINEERS A PROFIT IlIIONAI.CORRORA PION CIVIL - SANITARY - MECHANICAL 1814 GRANDSTAND PLACE • ELGIN,ILLINOIS 60123 EVERETT C.SCHEFLOW P.E. TELEPHONE:312/897-7095 FRANK C.CUDA P.E. June 11, 1987 Mr. Melford A. Dahl , P.E. Director of Public Works City of Elgin 150 Dexter Court Elgin, Illinois 60120 Dear Mr. Dahl , We are pleased to respond to your Request for Proposals for engineering services for the Laurel Street Storm Sewer Rehabilitation. Everett Scheflow Engineers is a small engineering firm providing engineering services to municipal and private clients. The business was started in 1967 and incorporated in 1972. The principals of the firm are Everett C. Scheflow and Frank C. Cuda. Both are registered Professional Engineers in Illinois. In addition the firm has one technician, one field inspector and two office personnel . The full time staff is supplemented as required by the use of outside consultants. We have regularly used the following consultants: Architect - John Schmidtke Structural - Baxter and Woodman, Inc. Electrical - Beam Engineering Company Surveying - Howard A. Meadows Borings* - Testing Services, Inc. Special Hydraulic Problems- Guillou and Associates, Inc. *This consultant may vary to meet the requirements of the client. We provide a full range of civil engineering services for a number of clients but the majority of our work is performed for three municipal clients: Village of Algonquin Village of West Dundee City of Genoa 1-[-Nr( T. CITY OF ELGIN ENGINEERING DEP + . Mr. Melford A. Dahl , P.E. City of Elgin Page 2 We currently are working on the following projects: Village of Algonquin: 1. Wastewater Treatment Plant Expansion. Estimated Cost: 4 Million Dollars. 2. Hanson Road Improvement. FAU Project Phase I Completed. Final Contract Value: $196,004.65. Phase II . Project Development Report Completed. Plans and Specifications to be started within one month. Estimated cost $500,000.00. 3. 1987 Street Program. Consisting of resurfacing, drainage, and miscellaneous street improvements. Estimated Cost: $150,000.00. 4. Hanson Road Watermain. Substantially Complete. Contract Value: $156,215.00 VILLAGE OF WEST DUNDEE: 1. Wastewater Improvements - Federal Grant Project. Substantially Complete. Final Contract Value: Approximately $1.5 Million 2. Royal Lane Sanitary Sewer. Substantially Complete. Final Contract Value: $127,337.00 3. 1987 Road Improvement Project. Resurfacing various streets, including drainage. Estimated cost:$88,799.00 CITY OF GENOA 1. West Main Street Improvement. Build Illinois Project. Reconstruction of street including drainage. Bids received. Low Bid: $324,226.55. 2. 1987 Street Improvements Project. Resurfacing various streets including drainage. Estimated cost: $158,429.00. Mr. Melford A. Dahl , P.E. City of Elgin Page 3 SAFETY KLEEN CORPORATION 1. Hebron, Ohio Facility. Site development including, drainage. Estimated cost: $250,000.00. 2. Elgin Recyle Center. Villa Street. Site development, including drainage. No Estimated Cost. SANITARY DISTRICT OF ELGIN 1. Design of Big Timber Sanitary Sewer. Phases 1 and 2 Complete. Bids received on Phase 3. Low Bid: $223,181.00 Mr. Melford A. Dahl , P.E. City of Elgin Page 4 CLIENT REFERENCES: 1. Village of Algonquin Ralph Jacob, Village Administrator 658-9444 2. Village of West Dundee William R. Sommer, Village Administrator 426-6161 3. Safety-Kleen Corporation Jim Bishop, Senior Engineer 697-8460 4. Custom Aluminum Products, Inc. Richard Nellans, President 741-6333 5. Village of Carpentersville Stephen W. Starek, Public Works Director 428-5912 6. Homart Development Company Ronald Berliant, Vice President 875-6666 7. City of Genoa James Dreska, Mayor 815-784-2327 8. Sanitary District of Elgin Albin D. Pagorski , General Manager 742-2068 Mr. Melford A. Dahl , P.E. City of Elgin Page 5 PROFESSIONAL RESUME Everett C. Scheflow, P. E. , President Education: BSCE - Purdue University, 1950 Registration: Registered Professional Engineer: Illinois. Business Experience: 1950 - 1958 George Scheflow, Contractor, Elgin. Construction Supervisor. 1958 - 1960 F. J. Bero Plumbing, Elgin. Estimator, Construction Supervisor. 1960 - 1963 Baxter and Woodman, Inc. , Crystal Lake. Construction Engineer. 1963 - 1965 Gavelek Engineers, Elgin. Design Engineer. 1966 - 1967 Sanitary District of Elgin. District Engineer. 1967 to date Everett Scheflow Engineers, A Professional Corporation. Professional Societies: Consulting Engineers Council of Illinois. Water Pollution Control Federation. Illinois Society of Professional Engineers. American Water Works Association. American Public Works Association. American Concrete Institute. Mr. Melford A. Dahl , P.E. City of Elgin Page 6 PROFESSIONAL RESUME Frank C. Cuda, P.E. Education: BSCE - Michigan State University, 1972 MBA - Northwestern University, 1983 Registration: Registered Professional Engineer: Illinois, Wisconsin. Business Experience: 1971 Illinois Department of Transportation, District 1, Elgin. Assistant Resident Engineer. 1972 - 1974 Baxter and Woodman, Inc. , Crystal Lake. Engineer 1974 - 1985 Lakeland Construction Co. , McHenry. Engineer Supervisor. 1985 Everett Scheflow Engineers, A Professional Corporation. Engineer Professional Society: Illinois Society of Professional Engineers. Mr. Melford A. Dahl , P.E. City of Elgin Page 7 PROPOSAL FOR ENGINEERING SERVICES FOR CITY OF ELGIN LAUREL STREET STORM SEWER REHABILITATION 1. Proposal for Design Report (Step 1) . We propose to prepare a design report for the Laurel Street Storm Sewer Rehabilitation for a lump sum of $6,300.00. The report will include a television report of the main sewer and visual inspection of all structures. Based on this information we will evaluate alernative methods of upgrading the system to be in accordance with current minimum standards of the City and good design practice. Illegal connections, if any, would be identified. As an alternative, we propose to prepare a design report for the improvement of the Laurel Street Storm Sewer system for a lump sum of $3,500.00. This report would assume that the existing sewer is not adequately sized to transmit a 10 year frequency storm and no television work would be included. The visual inspection of the structures, however, would be included. The report would include recommendations for the sizing of a new storm sewer system with evaluation of existing structures. The following work is not included in either proposal . 1. Soil borings 2. Dye testing, except, as may be deemed necessary by Engineer. 3. Tracing of illegal connections if any are located. We assume that the City will act to remove these connections under authority of existing ordinances. 4. Design of storm water detention facilites, (your Mr. Einweck stated those facilities are not necessary) . 5. The evaluation of storm sewer systems tributary to the Laurel Street Storm Sewer. If any of the above services are required we will be pleased to revise the proposal . Mr. Melford A. Dahl , P.E. City of Elgin Page 8 2. Proposal for Preparation of Plans, Specifications and Bidding Documents (Step 2) . We propose to prepare plans, specifications and bidding documents to implement the approved alternative for a lump sum of $3,800.00. 3. Construction Engineering Services (Step 3) . No proposal provided because none was requested. We would be pleased to provide a proposal if requested. 4. Other Matters. a) Insurance. We will provide insurance as required. In addition we have Professional Liability Insurance. b) Time Table. We can meet the time table. However, we cannot speak for the utility companies, if utility relocation is required. c) Agreement for Engineering Services. We assume that if the proposal is accepted you will require an Engineering Services Agreement. We can provide a draft copy for your review. d) Copies of material to be submitted. The proposal includes the submission of 6 copies of the design report and three sets of plans, specifications and bidding documents. =�. i EVERETT C. SCHEFLOW, I RESIDENT EVERETT SCHEFLOW E INEERS A PROFESSIONAL CORPORATION Of - CERTIFICATE OF INSURANCE ISSUE DATE(MM/DD/YY) 7/15/87 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND, AVA Insurance Agency, Inc. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW. 20 N. Wacker Drive, Ste. 2600 COMPANIES AFFORDING COVERAGE Chicago, IL 60606 COMPANY A LETTER Security Insurance Company of Hartford COMPANY INSURED LETTER B Everett Scheflow Engineers LETTER COMPANY c 1814 Grandstand Place COMPANY D Elgin, IL 60120 LETTER COMPANY E LETTER COVERAGES ' THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POUCY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY • BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS,AND CONDI- i''• t TIONS OF SUCH POLICIES. CO POLICY EFFECTIVE POLICY EXPIRATION LIABILITY LIMITS IN THOUSANDS LTR TYPE OF INSURANCE POLICY NUMBER DATE IMMrDDrYY) DATE woo" EACH OCCURRENCE AGGREGATE ' GENERAL LIABIUTY BODILY la COMPREHENSIVE FORM INJURY $ $ ;..: IL PREMISES/OPERATIONS PROPERTY ■ E XPLOSION&COLLAPSE HAZARD DAMAGE $ $ , A L PRODUCTS/COMPLETED OPERATIONS PL 616 475-01 11/16/86 11/16/87 "' ■ CONTRACTUAL COMB NED $ 500, $ 500, . INDEPENDENT CONTRACTORS ■ BROAD FORM PROPERTY DAMAGE >. n. III PERSONAL INJURY PERSONAL INJURY $ lig:;`' AUTOMOBILE LIABIUTY WO '':'_: ■ ANY AUTO IFLUAY $ (PER PERSON) ■ ALL OWNED AUTOS(PRIV. PASS.) BOGLY OHAN 1 Ih URY III ALL OWNED AUTOS C PTRIVHER PATSS./ 'PER ACCIDENT) $ • ■ HIRED AUTOS PROPERTY ■ NON-OWNED AUTOS DAMAGE $ !r ■ GARAGE LUIBILITY • . T' , EXCESS LIABIUTY I• ■ UMBRELLA FORM ■ OTHER THAN UMBRELLA FORM STATUTORY WORKERS'COMPENSATION AND $ (EACH ACCIDENT) '''�' i. EMPLOYERS' LIABILITY $ (DISEASE-POLICY LIMIT) -,,r 4i,: OTHER $ (DISEASE EACH EMPLOYEE) "„,a • -:a' ' Professional PL 616 475-01 11/16/86 11/16/87 $500, per claim/ , Liability annual aggregate DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/SPECIAL ITEMS Laurel Street Storm Sewer; The City of Elgin ;-;; is an additional insured under the comprehensive general liability, but only with respects to liability arisin; ,}R; : out of operations performed for such additional insured by or on behalf of the named insured. • CERTIFICATE HOLDER CANCELLATION i The City of Elgin SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX- :-'`'' 150 Dexter Court PIRAT QN DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO `' MAIL au DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE ••'4:4 Elgin, IL 60120 LEFT,BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR UABILITY =,5 OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE _ {� �` ,l2c-- _` , l Li tut Laml4� i ACORD 25(8/84) ` © IIR/ACORD CORPORATION 1044.'..;„,.. . . Certificate of Insurance . ,. .. =Ord THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED BELOW. NAME AND ADDRESS OF AGENCY . ..., • L.Li 11 D S IRON I 0 6 t.i!";A i',.!t:::E COMPANIES AFFORDING COVERAGES :1.700 LA17:1-<1 N AVENUE COMPANY ,ik .i... P. 0. BO>I, 3 8 L3 LETTER ELGIN, I Lt..I NO I S 6 0 1.21 COMPANY B LETTER 4.; • NAME AND ADDRESS OF INSURED COMPANY C • E ti E P E'I.T .:.::C I!EFL.°W LETTER . . EN G I N IE.E F.:(.-.:::, PC: COMPANY D .,.. . 1 Ei 1 4 0 Pi'::1i---iri ",T A ND r'L f•-••,,CE LETTER •-;;,..t. E L 0 I N, .11_1..1 N 0 i s ‘..,.,o 1 23 .,, COMPANY LETTER , , *L This is to certify that policies of insurance listed below have been issued to the insured named above and are in force at this time. Notwithstanding any requirement,term or condition 4 : of any contract or other document with respect to which this certificate may be issued or may pertain,the insurance afforded by the policies described herein is subject to all the terms,exclusions and conditions of such policies. Limits of Liabilit in Thousan.s Ill) . - COMPANY POLICY ''-' LETTER TYPE OF INSURANCE POLICY NUMBER EXPIRATION DATE EACH CCURRENCE AGGREGATE kit.,•4 O15.4 • . 'S ,A0,4 GENERAL LIABILITY BODILY INJURY S $ ID COMPREHENSIVE FORM ,... ,,14. El PREMISES—OPERATIONS PROPERTY DAMAGE S. S • LI EXPLOSION AND COLLAPSE HAZARD . ,..4.", El UNDERGROUND HAZARD t'''.."• 0 PRODUCTS/COMPLETED .„ r__, OPERATIONS HAZARD BODILY INJURY AND '.'*•' LJ CONTRACTUAL INSURANCE PROPERTY DAMAGE $ 1 ) 0 BROAD FORM PROPERTY COMBINED .:". .' DAMAGE ". .r; 0 INDEPENDENT CONTRACTORS CI PERSONAL INJURY .., PERSONAL INJURY • AUTOMOBILE LIABILITY BODILY INJURY (EACH PERSON) 0 COMPREHENSIVE FORM BODILY INJURY $ . Z.. El OWNED (EACH ACCIDENT) 4,-• 0 HIRED PROPERTY DAMAGE S. .;'• BODILY INJURY AND El NON-OWNED S. PROPERTY DAMAGE COMBINED •",-0; f•••0-.•;.- EXCESS LIABILITY BODILY INJURY AND ElUMBRELLA FORM PROPERTY DAMAGE *it 0 OTHER THAN UMBRELLA ) COMBINED V. FORM '',.... WORKERSCOMPENSATION STATUTORY A '. ,... and .3 C 0 1 0 c•:'1 1:::.)---0 I T.::: -.'::::-1. "."-T - .. - ' - - • . ... EMPLOYERS'LIABILITY _ 14.ki. • OTHER - : DESCRIPTION OF OPERATiONSiLOCATiONSNEHICLES 4 „ -,i „ . .... . Cancellation: Should any of the above described policies be cancelled before the expiration date thereof, the issuing corn- , ... pany will endeavor to mail :I.() . days written notice to the below named certificate holder, but failure to mail such notice shall impose no obligation or liability of any kind upon the company. NAME AND ADDRESS OF CERTIFICATE HOLDER DATE ISSUED - .. , - — . , C:I:.0 1'11 II E.X.1.17 p c ot IR-1" --- ___, , Er:L C,I i--1, I i_ CI 0 N.is-',I C. I , ;.-.1 I-I , C;':'C.' 1,1 ,., A,,-1,,ui.../EL i.I pki,,,.:A ACORD 25(1.79) Afi . . , . II . � X certificate of ,iilzuraiYce THIS IS TO CERTIFY that the company indicated by an X- has issued the policy or policies described below. The insurance afforded is only with respect to the coverages indicated by specific limits of liability and this certificate of insurance neither affirmatively nor negatively amends, extends nor alters the coverage 11 afforded by any policy described herein "This certificate or verification of insurance is not an insurance policy and does not amend, extend or alter the coverage afforded by the policies listed herein Notwithstanding any requirement, term, or condition of any contract or other document with respect to which this certificate or verification of insurance may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions and conditions of such policies" ] THE OHIO CASUALTY INSURANCE COMPANY 11 ❑ AMERICAN FIRE AND CASUALTY COMPANY ® WEST AMERICAN INSURANCE COMPANY 11 CERTIFICATE ISSUED TO [I 11 NAMED INSURED and ADDRESS NAME and ADDRESS 1EVERETT SCHEFLOW ENGS. A PROF CORP. 1 1 City of Elgin, Illinois i 11 1814 Grandstand Place Dexter Court Elgin, Illinois 60123 Elgin, Illinois 60120 i ti 1_ 1 I DESCRIPTION OF OPERATIONS LOCATION OF OPERATIONS 11 a 0 KIND OF INSURANCE0 POLICY NUMBER POLICY PERIOD LIMITS OF LIABILITY GENERAL LIABILITY COVERAGE EACH OCCURR. AGGREGATE El Comprehensive Form BODILY INJURY $ 000 $ 000 ❑ Premises-Operations ❑ Products/Completed PROPERTY DAMAGE $ 000 $ 000 Operations ❑ Contractual ❑ Independent Contractors ❑ Personal Injury COMBINED SINGLE LIMIT $ 000 $ 000 Personal Injury $ AUTO LIABILITY BODILY INJURY PROPERTY DAMAGE 0i ', Comprehensive DCW02004673 B 5/16/87 to 250 000 Each person $ 100 .000 Each accident Owned 11/16/87 $ 500 000 Each accident 11 [ Hiredn Non AC09617026 11/16/86 to -Owned Specified 11/16/87 Combined Single Limit $ 500 ,000 Each accident [1 UMBRELLA ll .000,000 Single Limit WORKERS' COMPENSATION COMPENSATION-STATUTORY-STATE(SS) Employers' Liability— $ OTHER: LIMITS OF LIABILITY BODILY INJURY PROPERTY DAMAGE In the event of cancellation of these policies written notice will be mailed to the party to whom this Certificate is issued but no responsibility is assumed by reason of any failure to do so. RAPALEE-OLSON AGENCY 164 DIVISION, ROOM 315 DATE. 7/13/87 ELGIN. IL 60120BYL ,,/1) Form L-604b Rev 4-83 ii=4 ? 3C=4}={K=:4 K=4 K:=l K=X1=X K.. —)4/C=4=X K=:==K iC====>f